TDOT contract CNZ261 bid tabulation

The repair of the bridge on s.r. 62 over little clear creek (l.m. 13.77). Let by Tennessee DOT on October 3, 2025, Morgan County. 4 bids received; low bid $1,673,335 by Jamison Construction, LLC.

Owner
Tennessee DOT
Letting
03 OCT 2025
Pay items
38
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Jamison Construction, LLC$1,673,335Low
2Mid-State Construction Company, Inc.$1,818,806+9.0%
3Southern Constructors, Inc.$2,260,852+35%
4Jones Bros. Contractors, LLC$2,495,758+49%
TDOT contract CNZ261: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Jamison Construction, LLC2. Mid-State Construction Company, Inc.3. Southern Constructors, Inc.4. Jones Bros. Contractors, LLC
1Construction stakes, lines and grades (105-01)LS1$14,500$14,959$50,000$25,000
2Removal and disposal of brush & trees (201-07.01)LS1$15,000$4,833.15$50,000$25,000
3Removal of structures (bridge no.65-SR062-13.77) (202-04.01)LS1$280,000$319,718$325,000$700,000
4Dry excavation (bridges) (204-02.01)CY407$70.00$73.85$75.00$60.00
5Granular backfill (bridges) (303-01.02)TON37$75.00$61.86$100.00$150.00
6Mineral aggregate (size **) (303-10.04)TON675$78.00$62.71$90.00$100.00
7Bituminous material for tack coat (TC) (403-01)TON1$1,200.00$1,190.25$1,250.00$1,035.00
8Acs mix(PG64-22) grading D (411-01.10)TON30$700.00$718.75$800.00$625.00
9Cold planing bituminous pavement (415-01.02)SY444$35.00$36.80$70.00$32.00
10Epoxy coated reinforcing steel (604-02.03)LB100,118$2.10$2.31$2.75$2.25
11Pavement @ bridge ends (604-03.04)SY213$510.00$542.95$500.00$600.00
12Class D concrete (bridge deck) (604-03.09)CY266$1,275.00$1,538.77$1,600.00$1,800.00
13Applied texture finish (new structures) (604-04.01)SY916$15.00$14.38$22.00$18.00
14Applied texture finish (existing structures) (604-04.02)SY21$15.00$74.75$22.00$18.00
15Bridge deck grooving (mechanical) (604-05.31)SY1,171$8.75$10.24$15.00$5.45
16Concrete repairs (604-10.54)SF1$600.00$1,980.80$1,000.00$2,500.00
17Concrete (foundation repairs) (604-10.55)CY6$2,400.00$2,485.20$5,000.00$5,000.00
18Epoxy injection (injection) (604-10.58)GAL5$225.00$80.50$200.00$250.00
19Epoxy injection repair (complete and in place) (604-10.62)LF88$140.00$110.55$150.00$260.00
20Conc parapet single slope (STD-1-1SS) (620-05.01)LF498$170.00$188.09$250.00$225.00
21Thrie beam bridge transition MASH TL-3 (705-06.25)EACH4$3,225.00$3,105.00$4,000.00$2,700.00
22Machined rip-rap (class A-1) (709-05.06)TON40$80.00$98.90$275.00$150.00
236" perforated pipe with vertical drain system (710-09.01)LF104$60.00$53.63$70.00$50.00
246" pipe underdrain (710-09.02)LF28$30.00$36.81$70.00$10.00
25Traffic control (712-01)LS1$78,000$91,580$100,000$35,000
26Portable barrier rail (MASH TL-3) (712-02.10)LF540$55.00$84.76$150.00$90.00
27Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH2$8,800.00$5,175.00$12,000$10,000
28Flexible drums (channelizing) (712-04.01)EACH47$44.00$46.00$50.00$40.00
29Barrier rail delineator (712-04.50)EACH27$20.00$14.95$50.00$13.00
30Signs (construction) (712-06)SF620$10.00$8.80$15.00$7.65
31Removable pavement marking (8" barrier line) (712-09.02)LF3,834$4.15$4.20$5.00$3.65
32Removable pavement marking (stop line) (712-09.04)LF50$25.00$28.75$30.00$20.00
33Removable black-out tape (8IN) (712-09.31)LF1,853$4.50$4.54$5.00$3.95
34Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM0.30$13,500$13,800$22,000$12,000
35Mobilization (717-01)LS1$137,000$142,222$220,000$255,000
36Temporary traffic signal system (730-40)EACH1$105,000$91,736$125,000$160,000
37Geogrid reinforcement type 2 (740-07.04)SY2,348$6.50$6.76$12.00$6.00
38Geotextile (type IV)(stabilization) (740-10.04)SY441$6.00$7.35$12.00$6.00
TDOT contract CNZ261: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy