TDOT contract CNZ260 bid tabulation
The repair of the bridge on westfield drive over i-26 (l.m. 0.05). Let by Tennessee DOT on October 3, 2025, Sullivan County. 3 bids received; low bid $1,480,105 by Southern Constructors, Inc..
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 46
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Southern Constructors, Inc. | $1,480,105 | Low |
| 2 | Jamison Construction, LLC | $1,655,088 | +12% |
| 3 | Mid-State Construction Company, Inc. | $1,668,269 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Southern Constructors, Inc. | 2. Jamison Construction, LLC | 3. Mid-State Construction Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removal and disposal of brush & trees (201-07.01) | LS | 1 | $20,000 | $25,000 | $58,606 |
| 2 | Road & drainage excavation (unclassified) (203-01) | CY | 1.80 | $1,000.00 | $500.00 | $1,653.65 |
| 3 | Mineral aggregate, type A base, grading D (303-01) | TON | 3.64 | $130.00 | $300.00 | $523.71 |
| 4 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 0.86 | $6,000.00 | $5,720.00 | $6,007.64 |
| 5 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 26 | $500.00 | $864.00 | $513.25 |
| 6 | Bituminous material for prime coat (PC) (402-01) | TON | 1 | $3,000.00 | $1,825.00 | $3,164.00 |
| 7 | Bituminous material for tack coat (TC) (403-01) | TON | 1 | $1,400.00 | $1,550.00 | $1,469.00 |
| 8 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 0.33 | $15,000 | $15,525 | $15,836 |
| 9 | Acs mix(PG64-22) grading D (411-01.10) | TON | 21 | $600.00 | $1,100.00 | $623.99 |
| 10 | Cold planing bituminous pavement (415-01.02) | SY | 311 | $60.00 | $55.00 | $49.04 |
| 11 | Repaint existing bearings (603-02.15) | LS | 1 | $20,000 | $2,000.00 | $11,695 |
| 12 | Containment & disposal of waste(BR. no. 82-I0B357-0.05 ) (603-05.20) | LS | 1 | $2,000.00 | $4,000.00 | $3,955.00 |
| 13 | Applied texture finish (existing structures) (604-04.02) | SY | 1,593 | $20.00 | $18.00 | $15.26 |
| 14 | Concrete (604-10.05) | SF | 12 | $800.00 | $850.00 | $1,601.63 |
| 15 | Concrete parapet repair (604-10.23) | LS | 1 | $10,000 | $18,000 | $45,140 |
| 16 | Bridge deck repairs (full depth of slab) (604-10.30) | SY | 10 | $1,800.00 | $1,500.00 | $1,329.50 |
| 17 | Expansion joint repairs (604-10.44) | LF | 60 | $600.00 | $915.00 | $1,006.65 |
| 18 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 200 | $470.00 | $510.00 | $482.70 |
| 19 | Concrete repairs (604-10.54) | SF | 12 | $800.00 | $850.00 | $1,601.67 |
| 20 | Epoxy injection (injection) (604-10.58) | GAL | 14 | $170.00 | $210.00 | $79.10 |
| 21 | Epoxy injection repair (complete and in place) (604-10.62) | LF | 285 | $150.00 | $250.00 | $96.05 |
| 22 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 870 | $85.00 | $80.00 | $77.74 |
| 23 | Concrete parapet curved wall (<=to 40MPH) (620-05.10) | LF | 24 | $1,500.00 | $1,000.00 | $2,045.69 |
| 24 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 47 | $35.00 | $39.00 | $56.50 |
| 25 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $2,000.00 | $1,800.00 | $1,751.50 |
| 26 | Thrie beam bridge transition MASH TL-2 (705-06.26) | EACH | 1 | $3,000.00 | $3,950.00 | $4,237.50 |
| 27 | Guardrail removed (706-01) | LF | 71 | $12.00 | $2.00 | $2.83 |
| 28 | Machined rip-rap (class A-1) (709-05.06) | TON | 132 | $200.00 | $78.00 | $376.50 |
| 29 | Traffic control (712-01) | LS | 1 | $190,000 | $240,000 | $192,812 |
| 30 | Interconnected portable barrier rail (712-02.02) | LF | 500 | $60.00 | $60.00 | $137.37 |
| 31 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 3,520 | $70.00 | $100.00 | $86.07 |
| 32 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $12,000 | $12,000 | $9,266.00 |
| 33 | Flexible drums (channelizing) (712-04.01) | EACH | 310 | $45.00 | $45.00 | $45.20 |
| 34 | Barrier rail delineator (712-04.50) | EACH | 69 | $40.00 | $25.00 | $16.39 |
| 35 | Signs (construction) (712-06) | SF | 1,424 | $15.00 | $11.50 | $7.91 |
| 36 | Arrow board (type C) (712-08.03) | EACH | 2 | $3,500.00 | $1,800.00 | $1,130.00 |
| 37 | Queue protection truck (712-08.12) | DAY | 10 | $2,500.00 | $1,450.00 | $1,412.50 |
| 38 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 26,520 | $5.00 | $3.60 | $3.48 |
| 39 | Removable pavement marking (stop line) (712-09.04) | LF | 70 | $25.00 | $25.00 | $22.60 |
| 40 | Removable pavement marking (6" line) (712-09.08) | LF | 1,890 | $4.00 | $3.20 | $3.11 |
| 41 | Removable black-out tape (8IN) (712-09.31) | LF | 6,110 | $5.00 | $3.90 | $3.84 |
| 42 | Changeable message sign unit (713-16.01) | EACH | 2 | $10,000 | $7,500.00 | $6,215.00 |
| 43 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.30 | $15,000 | $19,500 | $19,775 |
| 44 | Mobilization (717-01) | LS | 1 | $140,000 | $180,000 | $165,427 |
| 45 | Temporary traffic signal system (730-40) | EACH | 1 | $55,000 | $72,000 | $93,364 |
| 46 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 173 | $15.00 | $6.50 | $33.77 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.