| 1 | Removal of structures (walk BRG, sta. 60+65 (harrogate crossing) (202-04.01) | LS | 1 | $25,000 |
| 2 | Road & drainage excavation (unclassified) (203-01) | CY | 77 | $80.00 |
| 3 | Borrow excavation (unclassified) (203-03) | CY | 55 | $80.00 |
| 4 | Placing and spreading topsoil (203-04) | CY | 23 | $90.00 |
| 5 | Furnishing & spreading topsoil (203-07) | CY | 7 | $160.00 |
| 6 | Sediment removal (209-05) | CY | 7 | $80.00 |
| 7 | Temporary silt fence (with backing) (209-08.02) | LF | 562 | $8.00 |
| 8 | Temporary silt fence (without backing) (209-08.03) | LF | 402 | $6.00 |
| 9 | Rock check dam (209-08.07) | EACH | 1 | $3,000.00 |
| 10 | Mineral aggregate, type A base, grading D (303-01) | TON | 79 | $90.00 |
| 11 | Mineral aggregate (size 57) (303-10.01) | TON | 7 | $90.00 |
| 12 | Bituminous material for prime coat (PC) (402-01) | TON | 1 | $1,800.00 |
| 13 | Aggregate for cover material (PC) (402-02) | TON | 1 | $2,800.00 |
| 14 | Bituminous material for tack coat (TC) (403-01) | TON | 2 | $900.00 |
| 15 | Saw cutting asphalt pavement (407-20.05) | LF | 228 | $15.00 |
| 16 | Acs mix(PG64-22) grading D (411-01.10) | TON | 303 | $250.00 |
| 17 | Cold planing bituminous pavement (415-01.01) | TON | 289 | $80.00 |
| 18 | Class A concrete (roadway) (604-01.01) | CY | 6 | $1,500.00 |
| 19 | Scarifying (604-10.51) | SY | 92 | $60.00 |
| 20 | 18" pipe culvert (side drain) (607-39.02) | LF | 33 | $125.00 |
| 21 | 18IN endwall (side drain) (611-07.31) | EACH | 2 | $7,500.00 |
| 22 | Concrete curb ramp (701-02.03) | SF | 300 | $35.00 |
| 23 | Concrete curb (702-01) | CY | 9 | $1,600.00 |
| 24 | Concrete combined curb & gutter (702-03) | CY | 7 | $1,000.00 |
| 25 | Metal beam guard fence (705-01.04) | LF | 6 | $125.00 |
| 26 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 82 | $50.00 |
| 27 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $2,300.00 |
| 28 | Thrie beam 38IN vehicle & pedestrian safety rail MASH TL-3 (705-06.27) | LF | 91 | $125.00 |
| 29 | Guardrail removed (706-01) | LF | 174 | $10.00 |
| 30 | Pedestrian construction barrier fence (707-11.01) | LF | 100 | $8.00 |
| 31 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $85.00 |
| 32 | Machined rip-rap (class A-1) (709-05.06) | TON | 85 | $85.00 |
| 33 | Traffic control (712-01) | LS | 1 | $180,000 |
| 34 | Interconnected portable barrier rail (712-02.02) | LF | 540 | $55.00 |
| 35 | Remove and relocate portable barrier rail (712-02.36) | LF | 200 | $35.00 |
| 36 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $9,000.00 |
| 37 | Flexible drums (channelizing) (712-04.01) | EACH | 136 | $65.00 |
| 38 | Barrier rail delineator (712-04.50) | EACH | 27 | $30.00 |
| 39 | Signs (construction) (712-06) | SF | 796 | $35.00 |
| 40 | Temporary barricades (type III) (712-07.03) | LF | 60 | $35.00 |
| 41 | Arrow board (type C) (712-08.03) | EACH | 2 | $5,500.00 |
| 42 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 800 | $4.50 |
| 43 | Removable pavement marking (6" line) (712-09.08) | LF | 4,275 | $4.25 |
| 44 | Removable wet reflective pavement marking tape (712-09.21) | LF | 4,275 | $5.00 |
| 45 | Sign post delineation enhancement (713-02.21) | LF | 12 | $10.00 |
| 46 | "U" section steel posts (713-11.01) | LB | 675 | $8.00 |
| 47 | Perforated/knockout square tube post (713-11.02) | LB | 207 | $8.00 |
| 48 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 72 | $20.00 |
| 49 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 36 | $22.00 |
| 50 | Street name sign (rigid 0.100IN thick (713-14.21) | SF | 108 | $35.00 |
| 51 | Removal of signs, posts and footings (713-15) | LS | 1 | $1,000.00 |
| 52 | Suspended flat sheet aluminum sign (0.080" thick) (713-15.07) | EACH | 2 | $600.00 |
| 53 | Signs (bicycle signs) (713-16.20) | EACH | 6 | $450.00 |
| 54 | Temporary raised pavement marker (716-01.05) | EACH | 109 | $15.00 |
| 55 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 37 | $55.00 |
| 56 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 24 | $55.00 |
| 57 | Removal of snowplowable reflective marker (716-01.30) | EACH | 22 | $25.00 |
| 58 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 206 | $35.00 |
| 59 | Plastic pavement marking (stop line) (716-02.05) | LF | 228 | $20.00 |
| 60 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 7 | $200.00 |
| 61 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 420 | $5.00 |
| 62 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 130 | $35.00 |
| 63 | Plastic word pavement marking (only) (716-03.01) | EACH | 2 | $300.00 |
| 64 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 2 | $250.00 |
| 65 | Plastic pavement marking (bikelane symbol & arrow) (716-04.13) | EACH | 6 | $600.00 |
| 66 | Painted pavement marking (stop line) (716-05.05) | LF | 122 | $7.00 |
| 67 | Painted pavement marking (6" line) (716-05.20) | LM | 2.30 | $1,500.00 |
| 68 | Painted pavement markings(8" line) (716-05.50) | LF | 650 | $2.00 |
| 69 | Removal of pavement marking (line) (716-08.20) | LM | 0.40 | $10,000 |
| 70 | Hydroblast removal of pavement marking (pavement marking) (716-08.32) | LF | 1,825 | $4.00 |
| 71 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1 | $10,000 |
| 72 | Enhanced flat line thermo (8IN line) (716-12.06) | LF | 650 | $4.00 |
| 73 | Enhanced flat line thermo (8IN broken LN) (716-12.07) | LF | 420 | $4.00 |
| 74 | Mobilization (717-01) | LS | 1 | $175,000 |
| 75 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 2 | $2,000.00 |
| 76 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 4 | $2,800.00 |
| 77 | Signal head assembly (140 A with backplate) (730-02.31) | EACH | 2 | $2,200.00 |
| 78 | Install pull box (type A) (730-03.20) | EACH | 3 | $1,500.00 |
| 79 | Install pull box (type B) (730-03.21) | EACH | 11 | $1,600.00 |
| 80 | Electrical service connection (730-05.01) | EACH | 1 | $5,000.00 |
| 81 | Signal cable - 5 conductor (730-08.02) | LF | 932 | $5.00 |
| 82 | Signal cable - 7 conductor (730-08.03) | LF | 2,011 | $6.00 |
| 83 | Signal cable - 9 conductor (730-08.04) | LF | 221 | $7.00 |
| 84 | Conduit 1" diameter (PVC schedule 40) (730-12.01) | LF | 1,665 | $15.00 |
| 85 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 223 | $19.00 |
| 86 | Conduit 3" diameter (PVC schedule 40) (730-12.03) | LF | 203 | $22.00 |
| 87 | Conduit 2" diameter (directional bore) (730-12.23) | LF | 173 | $35.00 |
| 88 | Conduit 3" diameter (directional bore) (730-12.24) | LF | 60 | $46.00 |
| 89 | Vehicle detector (radar - stop line) (730-13.12) | EACH | 4 | $15,000 |
| 90 | Vehicle detector (radar - advance) (730-13.13) | EACH | 2 | $15,500 |
| 91 | Cabinet (eight phase base mounted) (730-15.32) | EACH | 1 | $29,500 |
| 92 | Controller (atc) (730-16.04) | EACH | 1 | $7,000.00 |
| 93 | Pedestal pole (10' pedestrian type A) (730-23.30) | EACH | 3 | $3,500.00 |
| 94 | Cantilever signal support (1 arm @ 40') (730-23.80) | EACH | 1 | $40,000 |
| 95 | Cantilever signal support (1 arm @ 55') (730-25.07) | EACH | 1 | $48,000 |
| 96 | Cantilever signal support (1 arm @ 65') (730-25.13) | EACH | 1 | $52,000 |
| 97 | Cantilever signal support (1 arm @ 75') (730-25.15) | EACH | 1 | $60,000 |
| 98 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 4 | $2,300.00 |
| 99 | Pedestrian pushbutton horizontal extension (730-26.12) | EACH | 3 | $800.00 |
| 100 | Geotextile (type III)(erosion control) (740-10.03) | SY | 146 | $9.00 |
| 101 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 91 | $11.00 |
| 102 | Temporary sediment tube 18IN (740-11.03) | LF | 77 | $35.00 |
| 103 | Seeding (with mulch) (801-01) | UNIT | 2 | $1,000.00 |
| 104 | Temporary seeding (with mulch) (801-01.07) | UNIT | 1.60 | $900.00 |
| 105 | Water (seeding & sodding) (801-03) | MG | 17 | $250.00 |
| 106 | Sodding (new sod) (803-01) | SY | 186 | $30.00 |