TDOT contract CNZ224 bid tabulation
The ada curb ramp upgrades on various state routes. Let by Tennessee DOT on August 15, 2025, Counties Blount, Loudon, Monroe, And Scott. 3 bids received; low bid $1,106,795 by Mid-State Construction Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 13
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mid-State Construction Company, Inc. | $1,106,795 | Low |
| 2 | Southern Constructors, Inc. | $1,116,827 | +1.0% |
| 3 | McKinnon Construction Company LLC | $1,314,575 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mid-State Construction Company, Inc. | 2. Southern Constructors, Inc. | 3. McKinnon Construction Company LLC |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $75,235 | $40,000 | $10,000 |
| 2 | Removal of trash and debris (202-01.03) | LS | 1 | $7,233.47 | $20,000 | $5,000.00 |
| 3 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 311 | $67.66 | $22.00 | $100.00 |
| 4 | Removal of curb and gutter (description) (202-08.15) | LF | 2,305 | $28.26 | $13.00 | $50.00 |
| 5 | Furnishing & spreading topsoil (203-07) | CY | 95 | $87.95 | $68.00 | $85.00 |
| 6 | Concrete sidewalk (4 ") (701-01.01) | SF | 2,796 | $22.39 | $22.00 | $25.00 |
| 7 | Concrete curb ramp (retrofit) (701-02.01) | SF | 12,635 | $37.34 | $38.50 | $55.00 |
| 8 | Detectable warning surface (rehabilitation) (701-02.06) | SF | 362 | $57.25 | $50.00 | $50.00 |
| 9 | Concrete curb (702-01) | CY | 13 | $1,371.38 | $1,650.00 | $1,000.00 |
| 10 | Concrete combined curb & gutter (702-03) | CY | 121 | $909.06 | $1,050.00 | $975.00 |
| 11 | Traffic control (712-01) | LS | 1 | $77,561 | $185,000 | $175,000 |
| 12 | Mobilization (717-01) | LS | 1 | $168,110 | $110,000 | $55,000 |
| 13 | Seeding (with mulch) (801-01) | UNIT | 10 | $117.65 | $400.00 | $125.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.