TDOT contract CNZ125 bid tabulation
The repair of the bridge on s.r. 351 over the nolichucky river (l.m. 16.17). Let by Tennessee DOT on February 7, 2025, Greene County. 4 bids received; low bid $689,371 by Jamison Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 07 FEB 2025
- Pay items
- 18
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Jamison Construction, LLC | $689,371 | Low |
| 2 | Southern Constructors, Inc. | $819,827 | +19% |
| 3 | Summers-Taylor, Inc. | $1,028,588 | +49% |
| 4 | Mid-State Construction Company, Inc. | $1,170,613 | +70% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jamison Construction, LLC | 2. Southern Constructors, Inc. | 3. Summers-Taylor, Inc. | 4. Mid-State Construction Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removal of structures (bridge no. 30-SR351-16.17) (202-04.01) | LS | 1 | $88,500 | $117,000 | $195,000 | $302,776 |
| 2 | Epoxy coated reinforcing steel (604-02.03) | LB | 21,437 | $3.50 | $4.00 | $7.00 | $2.07 |
| 3 | Class D concrete (bridge deck) (604-03.09) | CY | 24 | $2,675.00 | $3,600.00 | $3,450.00 | $6,891.66 |
| 4 | Applied texture finish (existing structures) (604-04.02) | SY | 4,250 | $16.00 | $21.00 | $18.00 | $14.56 |
| 5 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 1,558 | $52.00 | $58.00 | $59.00 | $70.42 |
| 6 | Concrete railing (620-06) | LF | 250 | $260.00 | $220.00 | $575.00 | $325.51 |
| 7 | Guardrail at bridge ends (705-01.01) | LF | 108 | $152.00 | $150.00 | $125.00 | $140.00 |
| 8 | Traffic control (712-01) | LS | 1 | $60,000 | $60,000 | $40,000 | $80,296 |
| 9 | Interconnected portable barrier rail (712-02.02) | LF | 410 | $50.00 | $90.00 | $119.00 | $220.72 |
| 10 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 1 | $8,500.00 | $16,000 | $15,000 | $16,800 |
| 11 | Flexible drums (channelizing) (712-04.01) | EACH | 41 | $38.00 | $50.00 | $33.00 | $38.08 |
| 12 | Barrier rail delineator (712-04.50) | EACH | 68 | $20.00 | $35.00 | $40.00 | $11.20 |
| 13 | Signs (construction) (712-06) | SF | 357 | $11.50 | $15.00 | $13.00 | $8.40 |
| 14 | Removable pavement marking (stop line) (712-09.04) | LF | 60 | $25.00 | $25.00 | $8.70 | $5.32 |
| 15 | Removable pavement marking (6" line) (712-09.08) | LF | 2,000 | $4.50 | $5.00 | $7.80 | $4.76 |
| 16 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.28 | $16,500 | $20,000 | $22,645 | $14,000 |
| 17 | Mobilization (717-01) | LS | 1 | $80,000 | $80,000 | $45,000 | $107,607 |
| 18 | Temporary traffic signal system (730-40.02) | LS | 1 | $40,000 | $60,000 | $95,000 | $75,636 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.