TDOT contract CNZ250 bid tabulation
The construction of a precast concrete box bridge on s.r. 53 near l.m. 17.56. Let by Tennessee DOT on October 3, 2025, Jackson County. 7 bids received; low bid $2,745,400 by Cleary Construction, Inc..
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 66
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cleary Construction, Inc. | $2,745,400 | Low |
| 2 | MasTec Civil, LLC | $2,917,442 | +6.0% |
| 3 | Bell & Associates Construction, LLC | $3,083,540 | +12% |
| 4 | Rogers Group, Inc. | $3,336,667 | +22% |
| 5 | Mack Construction, LLC | $4,349,181 | +58% |
| 6 | Middle Tennessee Infrastructure, Inc. | $8,951,758 | +226% |
| 7 | Precise Concrete Works, LLC | $9,919,069 | +261% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cleary Construction, Inc. | 2. MasTec Civil, LLC | 3. Bell & Associates Construction, LLC | 4. Rogers Group, Inc. | 5. Mack Construction, LLC | 6. Middle Tennessee Infrastructure, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $50,000 | $40,000 | $16,000 | $29,580 | $10,000 | $84,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $50,000 | $90,000 | $80,000 | $20,545 | $18,000 | $685,000 |
| 3 | Removal of pipe (180" CMP, sta. 19+60) (202-01.13) | LF | 172 | $47.00 | $165.00 | $75.00 | $42.00 | $80.00 | $2,439.50 |
| 4 | Removal of pipe (180" CMP, sta. 19+80) (202-01.14) | LF | 157 | $47.00 | $127.00 | $65.00 | $46.00 | $75.00 | $2,673.00 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 17,353 | $17.30 | $17.00 | $4.00 | $18.50 | $10.00 | $77.90 |
| 6 | Borrow excavation (graded solid rock) (203-02.01) | TON | 1,088 | $35.00 | $45.00 | $55.00 | $35.00 | $40.00 | $72.50 |
| 7 | Undercutting (203-05) | CY | 617 | $35.00 | $10.00 | $50.00 | $22.00 | $28.00 | $107.25 |
| 8 | Water (203-06) | MG | 48 | $55.00 | $56.00 | $140.00 | $145.00 | $33.00 | $20.85 |
| 9 | Furnishing & spreading topsoil (203-07) | CY | 195 | $52.00 | $23.00 | $60.00 | $45.00 | $67.00 | $124.40 |
| 10 | Channel excavation (unclassified) (203-08) | CY | 567 | $28.00 | $18.00 | $25.00 | $17.00 | $41.00 | $116.60 |
| 11 | Channel substrate (203-20.01) | CY | 287 | $50.00 | $36.00 | $50.00 | $25.00 | $58.00 | $470.70 |
| 12 | Construction of haul road (203-50) | LS | 1 | $40,000 | $108,000 | $100,000 | $52,480 | $360,000 | $295,000 |
| 13 | Foundation fill material (204-08) | CY | 83 | $75.00 | $139.00 | $80.00 | $69.00 | $90.00 | $1,465.00 |
| 14 | Filter sock (12 inch) (209-03.21) | LF | 250 | $5.00 | $11.00 | $4.00 | $4.40 | $4.25 | $5.10 |
| 15 | Stream mitigation-coconut fiber rolls (209-03.31) | LF | 200 | $30.00 | $45.00 | $18.00 | $26.50 | $27.00 | $18.25 |
| 16 | Sediment removal (209-05) | CY | 61 | $30.00 | $30.00 | $5.00 | $21.00 | $15.00 | $107.20 |
| 17 | Temporary silt fence (with backing) (209-08.02) | LF | 1,198 | $7.00 | $5.70 | $6.00 | $6.05 | $6.00 | $6.20 |
| 18 | Enhanced rock check dam (209-08.08) | EACH | 16 | $1,000.00 | $1,230.00 | $700.00 | $900.00 | $905.00 | $1,260.00 |
| 19 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 2 | $2,000.00 | $560.00 | $400.00 | $635.00 | $2,000.00 | $295.00 |
| 20 | Temporary in stream diversion (209-65.04) | LF | 291 | $105.00 | $187.00 | $75.00 | $58.00 | $112.00 | $480.00 |
| 21 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,612 | $35.00 | $44.00 | $43.00 | $38.00 | $41.00 | $44.70 |
| 22 | Granular backfill (roadway) (303-01.01) | TON | 3,911 | $35.00 | $30.00 | $40.00 | $26.00 | $40.00 | $45.50 |
| 23 | Mineral aggregate (size 57) (303-10.01) | TON | 22 | $48.00 | $84.00 | $130.00 | $53.00 | $51.00 | $70.00 |
| 24 | Mineral aggregate (size 4) (303-10.07) | TON | 72 | $48.00 | $94.00 | $130.00 | $43.00 | $51.00 | $109.25 |
| 25 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 268 | $119.00 | $105.00 | $115.00 | $99.00 | $106.00 | $132.00 |
| 26 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 169 | $156.00 | $135.00 | $150.00 | $130.00 | $140.00 | $175.00 |
| 27 | Bituminous material for prime coat (PC) (402-01) | TON | 4 | $1,500.00 | $1,300.00 | $1,440.00 | $1,250.00 | $1,350.00 | $1,675.00 |
| 28 | Aggregate for cover material (PC) (402-02) | TON | 13 | $144.00 | $135.00 | $138.00 | $120.00 | $130.00 | $160.00 |
| 29 | Bituminous material for tack coat (TC) (403-01) | TON | 1.30 | $1,260.00 | $1,176.00 | $1,200.00 | $1,050.00 | $1,120.00 | $1,400.00 |
| 30 | Acs mix(PG64-22) grading D (411-01.10) | TON | 176 | $174.00 | $162.00 | $170.00 | $145.00 | $160.00 | $194.00 |
| 31 | Longitudinal joint sealant (411-01.21) | LM | 0.74 | $5,000.00 | $4,480.00 | $4,600.00 | $4,150.00 | $5,000.00 | $8,650.00 |
| 32 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 0.19 | $2,400.00 | $35,000 | $2,300.00 | $2,115.00 | $2,200.00 | $2,675.00 |
| 33 | Cold planing bituminous pavement (415-01.01) | TON | 54 | $305.00 | $285.00 | $295.00 | $208.00 | $275.00 | $340.00 |
| 34 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 1 | $210.00 | $224.00 | $200.00 | $185.00 | $185.00 | $267.00 |
| 35 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 1 | $3,300.00 | $2,015.00 | $2,100.00 | $1,955.00 | $2,000.00 | $2,400.00 |
| 36 | Guardrail delineation enhancement (BI-directional) (705-04.22) | EACH | 100 | $10.00 | $6.20 | $9.00 | $8.45 | $8.50 | $740.00 |
| 37 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 313 | $34.00 | $34.00 | $33.00 | $30.00 | $30.50 | $40.00 |
| 38 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 325 | $39.00 | $39.00 | $37.00 | $35.00 | $35.00 | $50.00 |
| 39 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $2,000.00 | $1,800.00 | $1,900.00 | $1,745.00 | $1,760.00 | $2,150.00 |
| 40 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,500.00 | $1,800.00 | $1,450.00 | $1,325.00 | $1,335.00 | $2,150.00 |
| 41 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $4,600.00 | $4,000.00 | $4,425.00 | $4,070.00 | $4,100.00 | $4,800.00 |
| 42 | Guardrail removed (706-01) | LF | 691 | $7.20 | $2.00 | $7.00 | $6.25 | $6.40 | $2.65 |
| 43 | Radius rail (706-06.03) | LF | 47 | $45.00 | $55.00 | $42.50 | $39.00 | $40.00 | $66.50 |
| 44 | High-visibility construction fence (707-08.11) | LF | 300 | $5.00 | $6.50 | $2.00 | $4.25 | $5.00 | $2.65 |
| 45 | Machined rip-rap (class A-3) (709-05.05) | TON | 39 | $55.00 | $123.00 | $130.00 | $49.00 | $56.00 | $65.00 |
| 46 | Machined rip-rap (class C) (709-05.09) | TON | 1,183 | $40.00 | $55.00 | $42.00 | $34.00 | $51.00 | $69.00 |
| 47 | Traffic control (712-01) | LS | 1 | $14,500 | $14,000 | $14,500 | $16,885 | $45,000 | $27,000 |
| 48 | Flexible drums (channelizing) (712-04.01) | EACH | 25 | $30.00 | $28.00 | $30.00 | $27.00 | $26.75 | $33.25 |
| 49 | Warning lights (type A) (712-05.01) | EACH | 18 | $24.00 | $22.00 | $24.00 | $22.00 | $21.50 | $26.75 |
| 50 | Signs (construction) (712-06) | SF | 829 | $9.40 | $8.50 | $9.50 | $8.45 | $8.50 | $10.50 |
| 51 | Temporary barricades (type III) (712-07.03) | LF | 96 | $17.80 | $16.00 | $18.00 | $21.00 | $15.80 | $19.75 |
| 52 | Changeable message sign unit (713-16.01) | EACH | 2 | $6,000.00 | $5,600.00 | $12,000 | $4,500.00 | $5,325.00 | $6,700.00 |
| 53 | Remove and replace sign (corp of eng sign) (713-16.50) | EACH | 1 | $400.00 | $336.00 | $360.00 | $1,057.00 | $320.00 | $400.00 |
| 54 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 8 | $600.00 | $44.00 | $800.00 | $530.00 | $535.00 | $680.00 |
| 55 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.38 | $19,200 | $13,400 | $26,000 | $16,905 | $17,030 | $21,300 |
| 56 | Mobilization (717-01) | LS | 1 | $135,000 | $291,000 | $267,000 | $59,925 | $150,000 | $647,825 |
| 57 | Geotextile (type III)(erosion control) (740-10.03) | SY | 262 | $6.65 | $4.50 | $2.10 | $3.70 | $3.75 | $4.60 |
| 58 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 1,233 | $6.65 | $11.00 | $4.50 | $2.75 | $4.75 | $1.95 |
| 59 | Temporary sediment tube 18IN (740-11.03) | LF | 560 | $6.75 | $6.05 | $5.00 | $6.00 | $6.00 | $3.70 |
| 60 | Seeding (with mulch) (801-01) | UNIT | 10 | $102.00 | $105.00 | $115.00 | $90.00 | $91.00 | $67.00 |
| 61 | Temporary seeding (with mulch) (801-01.07) | UNIT | 22 | $60.00 | $56.00 | $58.00 | $53.00 | $55.00 | $67.00 |
| 62 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 10.30 | $180.00 | $168.00 | $175.00 | $159.00 | $200.00 | $680.00 |
| 63 | Water (seeding & sodding) (801-03) | MG | 107 | $96.00 | $56.00 | $58.00 | $85.00 | $85.00 | $67.00 |
| 64 | Sodding (new sod) (803-01) | SY | 292 | $9.00 | $11.00 | $10.00 | $8.00 | $8.00 | $7.75 |
| 65 | Erosion control blanket (type II) (805-12.02) | SY | 877 | $2.50 | $10.00 | $3.00 | $2.15 | $2.15 | $1.60 |
| 66 | Precast concrete box bridge (dual 18' X 17') (607-50.30) | LF | 96 | $15,425 | $14,073 | $18,700 | $23,765 | $30,000 | $38,348 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.