TDOT contract CNZ290 bid tabulation
The widening and repair of the bridges on i-40 over u.s. 70n (s.r. 24) (l.m. 0.24), including grading, drainage, and paving. Let by Tennessee DOT on December 5, 2025, Cumberland County. 4 bids received; low bid $15,995,774 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 162
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $15,995,774 | Low |
| 2 | Bell & Associates Construction, LLC | $16,161,241 | +1.0% |
| 3 | Mid-State Construction Company, Inc. | $16,305,054 | +2.0% |
| 4 | Jones Bros. Contractors, LLC | $16,790,724 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Bell & Associates Construction, LLC | 3. Mid-State Construction Company, Inc. | 4. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $140,000 | $92,000 | $115,360 | $250,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $41,440 | $28,424 | $46,413 | $25,000 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $19,230 | $19,364 | $21,538 | $30,000 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 5,928 | $27.00 | $59.00 | $30.24 | $52.00 |
| 5 | Borrow excavation (unclassified) (203-03) | CY | 3,165 | $43.50 | $51.00 | $69.44 | $19.00 |
| 6 | Placing and spreading topsoil (203-04) | CY | 308 | $43.00 | $19.00 | $48.16 | $35.00 |
| 7 | Water (203-06) | MG | 178 | $76.00 | $2.00 | $85.12 | $1.00 |
| 8 | Backfill material (flowable fill) (204-08.01) | CY | 10 | $400.00 | $655.00 | $369.60 | $500.00 |
| 9 | Filter sock (24 inch) (209-03.23) | LF | 604 | $11.00 | $10.00 | $12.32 | $8.40 |
| 10 | Sediment removal (209-05) | CY | 122 | $40.00 | $20.00 | $44.80 | $52.00 |
| 11 | Temporary silt fence (with backing) (209-08.02) | LF | 10,263 | $5.00 | $4.00 | $5.60 | $4.75 |
| 12 | Temporary silt fence (without backing) (209-08.03) | LF | 475 | $2.95 | $2.00 | $3.30 | $3.05 |
| 13 | Enhanced rock check dam (209-08.08) | EACH | 15 | $986.00 | $690.00 | $1,104.32 | $1,100.00 |
| 14 | Filter sock check dam (209-08.09) | EACH | 144 | $305.00 | $345.00 | $341.60 | $270.00 |
| 15 | Sandbags (209-09.01) | BAG | 176 | $31.00 | $49.00 | $34.72 | $15.00 |
| 16 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 6 | $3.60 | $86.00 | $34.03 | $20.00 |
| 17 | Catch basin protection (type A) (209-40.30) | EACH | 5 | $1,000.00 | $864.00 | $1,120.00 | $525.00 |
| 18 | Catch basin protection (type D) (209-40.33) | EACH | 7 | $290.00 | $288.00 | $324.80 | $325.00 |
| 19 | Catch basin filter assembly(type 1) (209-40.41) | EACH | 16 | $680.00 | $691.00 | $761.60 | $680.00 |
| 20 | Catch basin filter assembly(type 2) (209-40.42) | EACH | 2 | $850.00 | $1,152.00 | $952.00 | $680.00 |
| 21 | Temporary diversion channel (209-65.03) | LF | 40 | $290.00 | $323.00 | $324.80 | $100.00 |
| 22 | Mineral aggregate, type A base, grading D (303-01) | TON | 41,749 | $29.00 | $32.00 | $32.48 | $30.64 |
| 23 | Mineral aggregate (size 57) (303-10.01) | TON | 4,146 | $52.00 | $54.00 | $58.24 | $52.00 |
| 24 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 77 | $166.00 | $306.00 | $185.92 | $266.00 |
| 25 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 79 | $177.00 | $306.00 | $198.24 | $266.00 |
| 26 | Asp. conc. mix(PG76-22) (BPMB-HM) GR. A-S (307-01.22) | TON | 4,949 | $102.00 | $114.00 | $114.24 | $99.00 |
| 27 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01) | TON | 12,008 | $95.00 | $103.00 | $106.40 | $90.00 |
| 28 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 1,969 | $110.00 | $119.00 | $123.20 | $103.50 |
| 29 | Bituminous material for prime coat (PC) (402-01) | TON | 57 | $1,120.00 | $1,152.00 | $1,254.40 | $1,000.00 |
| 30 | Aggregate for cover material (PC) (402-02) | TON | 197 | $45.00 | $53.00 | $50.40 | $46.00 |
| 31 | Bituminous material for tack coat (TC) (403-01) | TON | 62 | $1,200.00 | $1,152.00 | $1,344.00 | $1,000.00 |
| 32 | Saw cutting asphalt pavement (407-20.05) | LF | 9,670 | $3.15 | $4.00 | $3.53 | $3.00 |
| 33 | Acs mix(PG64-22) grading D (411-01.10) | TON | 209 | $175.00 | $218.00 | $196.00 | $190.00 |
| 34 | Acs mix(PG76-22) grading D (411-03.10) | TON | 7,041 | $132.00 | $149.00 | $147.84 | $142.00 |
| 35 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 5.50 | $1,020.00 | $2,304.00 | $1,108.80 | $2,000.00 |
| 36 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 0.30 | $1,020.00 | $2,304.00 | $1,108.80 | $2,000.00 |
| 37 | Cold planing bituminous pavement (415-01.01) | TON | 9,383 | $34.50 | $32.00 | $39.76 | $28.50 |
| 38 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 2,174 | $96.00 | $121.00 | $107.52 | $95.00 |
| 39 | 18" concrete pipe culvert(class IV)jacked-in-place (607-03.05) | LF | 64 | $1,625.00 | $2,190.00 | $1,820.00 | $1,850.00 |
| 40 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 776 | $116.00 | $156.00 | $129.92 | $120.00 |
| 41 | 24" concrete pipe culvert(class IV)jacked-in-place (607-05.05) | LF | 68 | $2,090.00 | $2,589.00 | $2,340.80 | $2,400.00 |
| 42 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 129 | $160.00 | $259.00 | $179.20 | $187.00 |
| 43 | 30"X 19" horizontal oval concrete pipe culvert (607-16.02) | LF | 168 | $155.00 | $226.00 | $173.60 | $167.00 |
| 44 | 15" corrugated metal pipe culvert (607-37.01) | LF | 8 | $190.00 | $685.00 | $212.80 | $175.00 |
| 45 | 18" corrugated metal pipe culvert (607-37.02) | LF | 8 | $195.00 | $750.00 | $218.40 | $190.00 |
| 46 | 30" corrugated metal pipe culvert (607-37.04) | LF | 20 | $176.85 | $392.00 | $151.20 | $195.00 |
| 47 | Junction box, type 1 (611-02.10) | EACH | 1 | $4,000.00 | $11,328 | $4,480.00 | $5,900.00 |
| 48 | Class A concrete (pipe endwalls) (611-07.01) | CY | 4.10 | $2,200.00 | $2,210.00 | $2,464.00 | $3,000.00 |
| 49 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 122 | $4.00 | $3.50 | $4.48 | $4.00 |
| 50 | 30IN endwall (side drain) (611-07.33) | EACH | 1 | $12,000 | $12,151 | $13,440 | $12,000 |
| 51 | 30IN endwall (cross drain) 4:1 (611-07.61) | EACH | 1 | $6,500.00 | $11,126 | $7,280.00 | $7,500.00 |
| 52 | 30IN endwall (cross drain) 6:1 (611-07.62) | EACH | 1 | $8,500.00 | $13,278 | $9,520.00 | $10,000 |
| 53 | Catch basins, type 38, 0' - 4' depth (611-38.01) | EACH | 13 | $4,500.00 | $9,481.00 | $5,040.00 | $6,900.00 |
| 54 | Catch basins, type 38, > 4' - 8' depth (611-38.02) | EACH | 3 | $5,500.00 | $10,854 | $6,160.00 | $7,800.00 |
| 55 | Catch basins, type 39, 0' - 4' depth (611-39.01) | EACH | 1 | $5,500.00 | $11,873 | $6,160.00 | $8,000.00 |
| 56 | Catch basins, type 42, > 4' - 8' depth (611-42.02) | EACH | 5 | $5,500.00 | $12,313 | $6,160.00 | $8,400.00 |
| 57 | 18" temporary drainage pipe (621-03.02) | LF | 104 | $60.00 | $85.00 | $67.20 | $60.00 |
| 58 | Portland cement concrete ditch paving (703-01) | CY | 236 | $617.00 | $777.00 | $683.20 | $640.00 |
| 59 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 4 | $333.00 | $345.00 | $336.00 | $300.00 |
| 60 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 4,850 | $28.00 | $28.00 | $27.44 | $24.50 |
| 61 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,695.00 | $1,757.00 | $1,708.00 | $1,525.00 |
| 62 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 5 | $3,885.00 | $4,033.00 | $3,920.00 | $3,500.00 |
| 63 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 11 | $3,220.00 | $3,342.00 | $3,248.00 | $2,900.00 |
| 64 | Thrie beam agt (long span) MASH TL-3 (705-06.28) | EACH | 1 | $3,440.00 | $3,572.00 | $3,472.00 | $3,100.00 |
| 65 | Cable barrier (MASH TL-4) (705-06.50) | LF | 809 | $33.50 | $34.00 | $33.60 | $30.00 |
| 66 | Cable barrier anchor (MASH TL-4) (705-06.51) | EACH | 1 | $4,440.00 | $4,609.00 | $4,480.00 | $4,000.00 |
| 67 | Low maint crash cushn narrow (MASH TL-3) (705-20.20) | EACH | 1 | $28,260 | $44,639 | $35,840 | $32,000 |
| 68 | Guardrail removed (706-01) | LF | 1,052 | $2.80 | $2.50 | $2.80 | $2.50 |
| 69 | Cable barrier terminal (removal) (706-80.18) | EACH | 1 | $1,110.00 | $1,152.00 | $1,120.00 | $1,000.00 |
| 70 | Cable barrier (removal) (706-80.19) | LF | 784 | $4.50 | $4.00 | $4.48 | $4.00 |
| 71 | High-visibility construction fence (707-08.11) | LF | 2,906 | $2.50 | $2.00 | $2.80 | $2.95 |
| 72 | Machined rip-rap (class A-3) (709-05.05) | TON | 200 | $49.00 | $124.00 | $54.88 | $64.00 |
| 73 | Machined rip-rap (class A-1) (709-05.06) | TON | 217 | $48.00 | $125.00 | $53.76 | $72.00 |
| 74 | Machined rip-rap (class B) (709-05.08) | TON | 153 | $53.00 | $128.00 | $59.36 | $70.00 |
| 75 | Lateral underdrain (710-05) | LF | 300 | $51.00 | $43.00 | $44.80 | $25.00 |
| 76 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 6 | $1,910.00 | $1,593.00 | $1,680.00 | $1,100.00 |
| 77 | 36IN single slope concrete barrier wall (711-05.69) | LF | 58 | $500.00 | $691.00 | $486.00 | $500.00 |
| 78 | Traffic control (712-01) | LS | 1 | $67,170 | $138,257 | $201,817 | $255,000 |
| 79 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 13,350 | $47.00 | $44.33 | $71.76 | $43.00 |
| 80 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 960 | $102.00 | $87.00 | $81.74 | $92.00 |
| 81 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 8 | $12,480 | $12,682 | $9,520.00 | $12,000 |
| 82 | Flexible drums (channelizing) (712-04.01) | EACH | 453 | $68.00 | $42.00 | $69.44 | $62.00 |
| 83 | Barrier rail delineator (712-04.50) | EACH | 632 | $15.00 | $13.00 | $15.68 | $14.00 |
| 84 | Warning lights (type A) (712-05.01) | EACH | 457 | $27.00 | $23.00 | $28.00 | $25.00 |
| 85 | Signs (construction) (712-06) | SF | 1,275 | $6.50 | $9.00 | $6.72 | $6.00 |
| 86 | Temporary barricades (type III) (712-07.03) | LF | 48 | $22.00 | $32.00 | $22.40 | $20.00 |
| 87 | Arrow board (type C) (712-08.03) | EACH | 2 | $2,395.00 | $1,728.00 | $2,464.00 | $2,200.00 |
| 88 | Speed feedback sign assembly (712-08.08) | EACH | 2 | $6,525.00 | $6,799.00 | $6,720.00 | $6,000.00 |
| 89 | Digital speed limit sign assembly (712-08.09) | EACH | 4 | $6,145.00 | $6,799.00 | $6,328.00 | $5,650.00 |
| 90 | Queue protection truck (712-08.12) | DAY | 40 | $1,305.00 | $1,440.00 | $1,344.00 | $1,650.00 |
| 91 | Removable pavement marking (stop line) (712-09.04) | LF | 36 | $33.00 | $22.00 | $22.40 | $30.00 |
| 92 | Temporary transverse rumble strips (712-10.02) | LF | 960 | $53.00 | $17.00 | $56.00 | $48.00 |
| 93 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 0.24 | $710.00 | $720.00 | $728.00 | $650.00 |
| 94 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 50 | $3.80 | $4.00 | $3.92 | $3.50 |
| 95 | Delineator (mile marker) & steel post (713-02.04) | EACH | 4 | $280.00 | $288.00 | $285.60 | $255.00 |
| 96 | Flexible delineator (white) (713-02.14) | EACH | 422 | $55.00 | $61.00 | $56.00 | $50.00 |
| 97 | Perforated/knockout square tube post (713-11.02) | LB | 243.50 | $5.50 | $6.00 | $5.60 | $5.00 |
| 98 | P post slip base (713-11.21) | EACH | 2 | $655.00 | $600.00 | $672.00 | $600.00 |
| 99 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 15 | $16.00 | $18.00 | $16.24 | $14.50 |
| 100 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 32 | $17.00 | $18.00 | $17.92 | $16.00 |
| 101 | Removal of signs, posts and footings (713-15) | LS | 1 | $545.00 | $28.00 | $560.00 | $500.00 |
| 102 | Changeable message sign unit (713-16.01) | EACH | 6 | $9,240.00 | $7,750.00 | $9,520.00 | $8,500.00 |
| 103 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 11 | $50.00 | $41.00 | $42.00 | $45.00 |
| 104 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 735 | $50.00 | $41.00 | $42.00 | $45.00 |
| 105 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 226 | $50.00 | $41.00 | $42.00 | $45.00 |
| 106 | Removal of snowplowable reflective marker (716-01.30) | EACH | 972 | $13.00 | $12.00 | $12.32 | $12.00 |
| 107 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 2,325 | $13.00 | $11.00 | $11.76 | $12.00 |
| 108 | Painted pavement marking (6" line) (716-05.20) | LM | 1.20 | $1,630.00 | $1,663.00 | $1,680.00 | $1,500.00 |
| 109 | Painted pavement markings(8" line) (716-05.49) | LM | 6 | $1,960.00 | $1,330.00 | $1,344.00 | $1,800.00 |
| 110 | Removal of pavement marking (line) (716-08.20) | LM | 17.80 | $6,525.00 | $4,075.00 | $4,116.00 | $6,000.00 |
| 111 | Contrast pavement shadow marking 6" (716-09.94) | LM | 0.10 | $48,915 | $44,360 | $44,800 | $45,000 |
| 112 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 8 | $9,565.00 | $6,931.00 | $7,000.00 | $8,800.00 |
| 113 | Spray thermo PVMT MRKNG (60 mil) (8IN barrier line) (716-13.03) | LF | 56,070 | $2.20 | $0.85 | $0.90 | $2.00 |
| 114 | Mobilization (717-01) | LS | 1 | $1,045,195 | $1,131,287 | $768,728 | $1,670,000 |
| 115 | Portable smart work zone system (725-21.07) | DAY | 365 | $155.00 | $91.00 | $168.00 | $150.00 |
| 116 | Temporary traffic signal system (730-40) | EACH | 1 | $97,830 | $44,778 | $90,000 | $110,000 |
| 117 | Rectangular rapid flashing beacon assembly (solar powered) (730-50.20) | EACH | 2 | $10,870 | $6,341.00 | $11,200 | $10,000 |
| 118 | Geogrid reinforcement type 2 (740-07.04) | SY | 8,323 | $4.00 | $5.00 | $4.48 | $4.00 |
| 119 | Geotextile (type III)(erosion control) (740-10.03) | SY | 449 | $2.20 | $5.00 | $2.46 | $4.00 |
| 120 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 2,406 | $6.00 | $6.00 | $6.72 | $3.00 |
| 121 | Temporary sediment tube 20IN (740-11.04) | LF | 2,560 | $3.90 | $7.00 | $4.37 | $4.10 |
| 122 | Seeding (with mulch) (801-01) | UNIT | 74 | $49.00 | $66.00 | $54.88 | $60.00 |
| 123 | Temporary seeding (with mulch) (801-01.07) | UNIT | 80 | $39.00 | $50.00 | $43.68 | $45.00 |
| 124 | Special wetland seed mixture (801-01.36) | UNIT | 1 | $1,000.00 | $333.00 | $1,120.00 | $300.00 |
| 125 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 5 | $250.00 | $222.00 | $280.00 | $200.00 |
| 126 | Water (seeding & sodding) (801-03) | MG | 71 | $125.00 | $72.00 | $140.00 | $75.00 |
| 127 | Seed (supplemental application) (801-07) | LB | 128 | $4.75 | $22.00 | $5.32 | $20.00 |
| 128 | Fertilizer (supplemental application) (801-08) | TON | 1 | $1,950.00 | $556.00 | $2,184.00 | $500.00 |
| 129 | Sodding (new sod) (803-01) | SY | 4,409 | $6.00 | $6.00 | $6.72 | $5.50 |
| 130 | Project mowing (806-02.03) | CYCL | 4 | $1,450.00 | $2,600.00 | $1,624.00 | $2,500.00 |
| 131 | Removal of structures (BR-18-I0040-00.24 LT) (202-04.01) | LS | 1 | $402,000 | $427,513 | $386,400 | $495,000 |
| 132 | Removal of structures (BR-18-I0040-00.24 RT) (202-04.02) | LS | 1 | $402,000 | $428,934 | $388,800 | $495,000 |
| 133 | Dry excavation (bridges) (204-02.01) | CY | 4,468 | $29.00 | $27.00 | $26.11 | $45.00 |
| 134 | Rock excavation (bridges) (204-04.01) | CY | 30 | $215.00 | $147.00 | $198.64 | $325.00 |
| 135 | Rock drilling (bridges) (204-05) | LF | 96 | $60.00 | $56.00 | $53.59 | $40.00 |
| 136 | Granular backfill (bridges) (303-01.02) | TON | 160 | $60.00 | $85.00 | $51.74 | $70.00 |
| 137 | Epoxy coated reinforcing steel (604-02.03) | LB | 345,790 | $2.15 | $1.76 | $1.94 | $1.90 |
| 138 | Class A concrete (bridges) (604-03.01) | CY | 388 | $1,830.00 | $2,037.00 | $1,680.00 | $1,600.00 |
| 139 | Steel bar reinforcement (bridges) (604-03.02) | LB | 106,171 | $1.70 | $1.40 | $1.55 | $1.40 |
| 140 | Pavement @ bridge ends (604-03.04) | SY | 948 | $550.00 | $513.00 | $503.22 | $350.00 |
| 141 | Class DS concrete (604-03.32) | CY | 1,054 | $1,390.00 | $1,216.00 | $1,279.20 | $1,400.00 |
| 142 | Applied texture finish (new structures) (604-04.01) | SY | 3,435 | $21.00 | $10.50 | $19.20 | $16.00 |
| 143 | Applied texture finish (existing structures) (604-04.02) | SY | 3,412 | $21.00 | $11.60 | $19.20 | $16.00 |
| 144 | Bridge deck grooving (mechanical) (604-05.31) | SY | 5,195 | $7.20 | $3.00 | $6.60 | $2.72 |
| 145 | Concrete (604-10.05) | SF | 59 | $565.00 | $395.00 | $516.00 | $500.00 |
| 146 | Remove existing wearing surface (604-10.14) | LS | 1 | $27,725 | $22,250 | $22,400 | $20,000 |
| 147 | Concrete parapet repair (604-10.22) | LF | 160 | $220.00 | $401.00 | $200.45 | $500.00 |
| 148 | Concrete repairs (604-10.42) | CF | 34 | $715.00 | $1,104.00 | $656.18 | $1,100.00 |
| 149 | Concrete repairs (604-10.54) | SF | 59 | $565.00 | $387.00 | $516.00 | $350.00 |
| 150 | Concrete (foundation repairs) (604-10.55) | CY | 2 | $1,695.00 | $3,782.00 | $1,560.00 | $5,000.00 |
| 151 | Epoxy injection (injection) (604-10.58) | GAL | 14 | $92.00 | $77.00 | $84.00 | $350.00 |
| 152 | Epoxy injection repair (complete and in place) (604-10.62) | LF | 133 | $160.00 | $119.00 | $144.00 | $110.00 |
| 153 | Steel piles (12 inch) (606-03.03) | LF | 418 | $160.00 | $174.00 | $145.20 | $120.00 |
| 154 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 16 | $330.00 | $220.00 | $300.00 | $100.00 |
| 155 | Prestressed concrete I-beam (type III) (615-01.03) | LF | 922 | $425.00 | $340.00 | $389.19 | $525.00 |
| 156 | Prestressed concrete I-beam (type IV) (615-01.04) | LF | 849 | $500.00 | $390.00 | $455.62 | $610.00 |
| 157 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 1,320 | $155.00 | $116.00 | $140.56 | $80.00 |
| 158 | Temporary shoring (621-05.02) | LS | 1 | $172,920 | $53,418 | $159,086 | $100,000 |
| 159 | Rubble stone rip-rap (709-01.01) | CY | 4 | $1,200.00 | $1,260.00 | $1,102.80 | $750.00 |
| 160 | Reinforced concrete slope pavement (709-04) | CY | 65 | $1,350.00 | $921.00 | $1,239.61 | $1,800.00 |
| 161 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 433 | $50.00 | $81.00 | $43.88 | $30.00 |
| 162 | 6" pipe underdrain (710-09.02) | LF | 90 | $35.00 | $31.00 | $32.40 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.