TDOT contract CNZ192 bid tabulation
The interchange modifications on i-40 at s.r. 13, including grading, drainage, lighting, and paving (l.m. 7.64 to l.m. 8.64). Let by Tennessee DOT on June 27, 2025, Humphreys County. 3 bids received; low bid $5,182,241 by Delta Contracting Company, LLC.
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 92
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Delta Contracting Company, LLC | $5,182,241 | Low |
| 2 | Bell & Associates Construction, LLC | $5,891,802 | +14% |
| 3 | Jones Bros. Contractors, LLC | $7,101,645 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delta Contracting Company, LLC | 2. Bell & Associates Construction, LLC | 3. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $44,180 | $35,000 | $40,000 |
| 2 | Trainee (109-10.01) | HR | 1,160 | $0.80 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $139,210 | $140,000 | $310,000 |
| 4 | Removal of structures and obstructions (202-01) | LS | 1 | $5,400.00 | $33,000 | $87,000 |
| 5 | Removal of asphalt pavement (202-03.01) | SY | 2,465 | $12.00 | $15.00 | $52.00 |
| 6 | Road & drainage excavation (unclassified) (203-01) | CY | 16,457 | $22.00 | $42.00 | $59.00 |
| 7 | Borrow excavation (unclassified) (203-03) | CY | 4,195 | $3.00 | $52.00 | $60.00 |
| 8 | Placing and spreading topsoil (203-04) | CY | 2,335 | $17.00 | $18.00 | $25.00 |
| 9 | Water (203-06) | MG | 280 | $32.00 | $60.00 | $10.00 |
| 10 | Backfill material (flowable fill) (204-08.01) | CY | 35 | $400.00 | $430.00 | $500.00 |
| 11 | Brooming & degrassing shoulders (208-01.05) | LM | 2 | $1,425.00 | $5,000.00 | $4,336.00 |
| 12 | Filter sock (12 inch) (209-03.21) | LF | 5,572 | $3.00 | $4.20 | $3.90 |
| 13 | Sediment removal (209-05) | CY | 101 | $28.00 | $80.00 | $38.00 |
| 14 | Temporary silt fence (with backing) (209-08.02) | LF | 2,308 | $4.80 | $5.00 | $4.80 |
| 15 | Rock check dam (209-08.07) | EACH | 4 | $750.00 | $1,100.00 | $1,000.00 |
| 16 | Enhanced rock check dam (209-08.08) | EACH | 6 | $1,150.00 | $1,300.00 | $1,200.00 |
| 17 | Sandbags (209-09.01) | BAG | 126 | $9.25 | $25.00 | $11.00 |
| 18 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 525 | $5.00 | $14.00 | $5.00 |
| 19 | Catch basin protection (type B) (209-40.31) | EACH | 2 | $1,200.00 | $664.00 | $600.00 |
| 20 | Mineral aggregate, type A base, grading D (303-01) | TON | 11,507 | $37.00 | $55.50 | $50.00 |
| 21 | Mineral aggregate (size 57) (303-10.01) | TON | 26 | $50.00 | $130.00 | $50.00 |
| 22 | Asp. conc. mix(PG76-22) (BPMB-HM) GR. A-S (307-01.22) | TON | 989 | $168.00 | $118.00 | $178.00 |
| 23 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01) | TON | 1,349 | $172.00 | $120.00 | $181.00 |
| 24 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 1,019 | $188.00 | $125.00 | $193.00 |
| 25 | Bituminous material for tack coat (TC) (403-01) | TON | 126 | $300.00 | $1,000.00 | $1,018.00 |
| 26 | Saw cutting asphalt pavement (407-20.05) | LF | 16,110 | $2.82 | $2.60 | $4.75 |
| 27 | Acs mix(PG76-22) grading D (411-03.10) | TON | 3,494 | $195.00 | $138.00 | $174.00 |
| 28 | Cold planing bituminous pavement (415-01.01) | TON | 2,809 | $57.00 | $55.00 | $53.00 |
| 29 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 35 | $145.00 | $271.00 | $130.00 |
| 30 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 23 | $205.00 | $350.00 | $160.00 |
| 31 | Class A concrete (pipe endwalls) (611-07.01) | CY | 9.15 | $1,600.00 | $3,000.00 | $2,300.00 |
| 32 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 305 | $3.50 | $7.00 | $5.00 |
| 33 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 3,855 | $32.50 | $26.00 | $32.50 |
| 34 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $1,425.00 | $1,600.00 | $1,425.00 |
| 35 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $3,850.00 | $3,800.00 | $3,850.00 |
| 36 | Portable impact attenuator NCHRP350 TL-3 (705-08.11) | EACH | 1 | $12,000 | $9,500.00 | $9,200.00 |
| 37 | Guardrail removed (706-01) | LF | 1,310 | $5.00 | $2.50 | $5.00 |
| 38 | Removal and reset fence (R.O.W.) (707-06.03) | LF | 1,700 | $15.06 | $17.00 | $8.00 |
| 39 | High-visibility construction fence (707-08.11) | LF | 835 | $3.90 | $4.00 | $3.90 |
| 40 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $50.00 | $100.00 | $75.00 |
| 41 | Machined rip-rap (class A-1) (709-05.06) | TON | 193 | $50.00 | $100.00 | $75.00 |
| 42 | Aggregate underdrains (with pipe) (710-02) | LF | 4,790 | $12.50 | $13.00 | $15.00 |
| 43 | Lateral underdrain (710-05) | LF | 754 | $11.75 | $13.00 | $11.75 |
| 44 | Lateral underdrain endwall (2:1) (710-06.11) | EACH | 6 | $1,200.00 | $1,250.00 | $1,200.00 |
| 45 | Lateral underdrain endwall (3:1) (710-06.12) | EACH | 16 | $1,200.00 | $1,300.00 | $1,200.00 |
| 46 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 6 | $1,200.00 | $1,350.00 | $1,200.00 |
| 47 | Traffic control (712-01) | LS | 1 | $121,200 | $172,000 | $300,000 |
| 48 | Interconnected portable barrier rail (712-02.02) | LF | 13,870 | $45.00 | $47.00 | $48.00 |
| 49 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $7,800.00 | $7,900.00 | $9,200.00 |
| 50 | Flexible drums (channelizing) (712-04.01) | EACH | 140 | $45.00 | $36.00 | $43.00 |
| 51 | Barrier rail delineator (712-04.50) | EACH | 694 | $10.00 | $10.50 | $12.20 |
| 52 | Warning lights (type A) (712-05.01) | EACH | 22 | $25.00 | $15.00 | $32.50 |
| 53 | Signs (construction) (712-06) | SF | 1,523 | $7.35 | $8.00 | $7.65 |
| 54 | Arrow board (type C) (712-08.03) | EACH | 3 | $1,250.00 | $1,150.00 | $2,150.00 |
| 55 | Queue protection truck (712-08.12) | DAY | 40 | $1,000.00 | $1,250.00 | $1,425.00 |
| 56 | Removable black-out tape (8IN) (712-09.31) | LF | 1,000 | $5.00 | $5.00 | $5.00 |
| 57 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 2 | $750.00 | $760.00 | $750.00 |
| 58 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 150 | $3.50 | $3.50 | $3.50 |
| 59 | Perforated/knockout square tube post (713-11.02) | LB | 250 | $5.25 | $7.50 | $7.20 |
| 60 | P post slip base (713-11.21) | EACH | 6 | $500.00 | $550.00 | $510.00 |
| 61 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 72 | $25.00 | $17.00 | $16.80 |
| 62 | Removal & relocation of sign & support (713-15.02) | EACH | 4 | $1,000.00 | $550.00 | $500.00 |
| 63 | Changeable message sign unit (713-16.01) | EACH | 6 | $5,900.00 | $6,100.00 | $10,200 |
| 64 | Jacked or bored conduit (714-03) | LF | 909 | $24.00 | $3.60 | $3.56 |
| 65 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 7,657 | $10.00 | $10.00 | $9.53 |
| 66 | Pull boxes (type C) (714-05.04) | EACH | 18 | $1,100.00 | $1,250.00 | $1,222.00 |
| 67 | Cable (1/C # 4 AWG) (714-06.06) | LF | 25,698 | $3.00 | $2.40 | $2.17 |
| 68 | Light standards (40FT offset) (714-08.09) | EACH | 19 | $5,300.00 | $2,400.00 | $2,360.00 |
| 69 | Light standards (100FT high mast) (714-08.10) | EACH | 4 | $45,000 | $80,000 | $78,165 |
| 70 | Removal of light standard & foundation (714-08.32) | EACH | 7 | $2,500.00 | $2,500.00 | $2,494.00 |
| 71 | Foundation for light standards - high mast (100FT) (714-08.40) | EACH | 4 | $16,000 | $10,500 | $10,000 |
| 72 | LED luminaires (180W offset) (714-09.47) | EACH | 19 | $1,355.00 | $750.00 | $700.00 |
| 73 | LED luminaires-high mast (295W) (714-09.64) | EACH | 32 | $2,200.00 | $1,050.00 | $1,000.00 |
| 74 | Control center (no. 1) (714-12.01) | LS | 1 | $22,000 | $12,500 | $12,000 |
| 75 | Control center (no. 2) (714-12.02) | LS | 1 | $22,000 | $12,500 | $12,000 |
| 76 | Removal of existing control center (CC1 & CC2) (714-12.30) | EACH | 2 | $2,000.00 | $2,500.00 | $2,441.00 |
| 77 | Electrical connection (CC1) (714-25.01) | LS | 1 | $5,000.00 | $9,800.00 | $2,100.00 |
| 78 | Electrical connection (CC2) (714-25.02) | LS | 1 | $5,000.00 | $9,800.00 | $9,000.00 |
| 79 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 191 | $75.00 | $80.00 | $75.00 |
| 80 | Removal of snowplowable reflective marker (716-01.30) | EACH | 136 | $15.00 | $15.00 | $9.00 |
| 81 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 405 | $12.00 | $12.00 | $12.00 |
| 82 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 49,800 | $0.75 | $0.80 | $0.75 |
| 83 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 2 | $9,500.00 | $10,500 | $9,500.00 |
| 84 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 1,745 | $3.00 | $3.10 | $3.00 |
| 85 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 3,470 | $2.00 | $2.10 | $2.00 |
| 86 | Mobilization (717-01) | LS | 1 | $452,137 | $559,645 | $710,000 |
| 87 | Geotextile (type III)(erosion control) (740-10.03) | SY | 557 | $1.50 | $10.00 | $5.00 |
| 88 | Temporary sediment tube 8IN (740-11.01) | LF | 510 | $3.60 | $4.00 | $3.60 |
| 89 | Seeding (with mulch) (801-01) | UNIT | 299 | $45.00 | $46.00 | $45.00 |
| 90 | Temporary seeding (with mulch) (801-01.07) | UNIT | 967 | $32.00 | $33.00 | $32.00 |
| 91 | Fertilizer (801-02.15) | TON | 3 | $1,360.00 | $1,500.00 | $1,360.00 |
| 92 | Water (seeding & sodding) (801-03) | MG | 128 | $80.00 | $80.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way