TDOT contract CN264054 bid tabulation
The construction of a concrete box beam bridge on s.r. 205 over overflow (l.m. 2.34) and a concrete bulb-tee beam bridge on s.r. 205 over the wolf river (l.m. 2.51), including grading, drainage, and paving. Let by Tennessee DOT on August 14, 2026, Shelby County. 2 bids received; low bid $16,844,000 by Dement Construction Group, LLC.
- Owner
- Tennessee DOT
- Letting
- 14 AUG 2026
- Pay items
- 113
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dement Construction Group, LLC | $16,844,000 | Low |
| 2 | Bell & Associates Construction, LLC | $18,110,402 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dement Construction Group, LLC | 2. Bell & Associates Construction, LLC |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $150,000 | $180,000 |
| 2 | Trainee (109-10.01) | HR | 2,740 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $369,400 | $345,000 |
| 4 | Removal of structures and obstructions (202-01.50) | EACH | 2 | $5,000.00 | $5,000.00 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 334 | $25.00 | $49.50 |
| 6 | Borrow excavation (graded solid rock) (203-02.01) | TON | 26,398 | $71.35 | $85.00 |
| 7 | Placing and spreading topsoil (203-04) | CY | 1,365 | $13.75 | $25.75 |
| 8 | Undercutting (203-05) | CY | 14,968 | $16.50 | $19.80 |
| 9 | Embankment (compacted in place) (203-10) | CY | 32,214 | $24.20 | $22.00 |
| 10 | Protected area marker (white with decal) (209-03.99) | EACH | 38 | $275.00 | $302.57 |
| 11 | Sediment removal (209-05) | CY | 157 | $25.00 | $102.93 |
| 12 | Temporary silt fence (with backing) (209-08.02) | LF | 10,040 | $5.50 | $6.05 |
| 13 | Rock check dam (209-08.07) | EACH | 4 | $2,200.00 | $1,650.00 |
| 14 | Enhanced rock check dam (209-08.08) | EACH | 1 | $4,300.00 | $2,250.00 |
| 15 | Mineral aggregate, type A base,grading D limestone (303-01.09) | TON | 7,989 | $52.70 | $70.00 |
| 16 | Mineral aggregate (size 57) (303-10.01) | TON | 174 | $72.20 | $80.00 |
| 17 | Mineral aggregate (size 57) (303-10.04) | TON | 4,500 | $50.00 | $75.00 |
| 18 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 1,170 | $161.00 | $175.00 |
| 19 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 1,343 | $163.00 | $180.00 |
| 20 | Bituminous material for tack coat (TC) (403-01) | TON | 5.90 | $1,250.00 | $1,350.00 |
| 21 | Saw cutting asphalt pavement (407-20.05) | LF | 60 | $30.00 | $3.50 |
| 22 | Acs mix(PG64-22) grading D (411-01.10) | TON | 914 | $178.00 | $200.00 |
| 23 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 1 | $9,600.00 | $10,200 |
| 24 | Cold planing bituminous pavement (415-01.02) | SY | 1,596 | $12.00 | $13.00 |
| 25 | 30" pipe culvert (side drain) (607-39.04) | LF | 50 | $152.00 | $155.00 |
| 26 | Class A concrete (pipe endwalls) (611-07.01) | CY | 2 | $4,880.00 | $3,000.00 |
| 27 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 93 | $2.00 | $2.00 |
| 28 | 30IN endwall (side drain) (611-07.33) | EACH | 1 | $15,320 | $4,000.00 |
| 29 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 86 | $38.00 | $33.00 |
| 30 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,075.00 | $1,350.00 |
| 31 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 10 | $3,400.00 | $3,650.00 |
| 32 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 8 | $2,800.00 | $3,000.00 |
| 33 | Guardrail removed (706-01) | LF | 754 | $4.00 | $1.00 |
| 34 | Radius rail (706-06.03) | LF | 50 | $57.00 | $47.50 |
| 35 | Rounded end element (706-10.26) | EACH | 2 | $150.00 | $215.00 |
| 36 | Removal of fence (barbed wire) (707-06.01) | LF | 1,044 | $10.00 | $3.50 |
| 37 | High-visibility construction fence (707-08.11) | LF | 12,933 | $2.50 | $2.75 |
| 38 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 13 | $560.00 | $500.00 |
| 39 | Machined rip-rap (class A-3) (709-05.05) | TON | 400 | $84.25 | $80.00 |
| 40 | Machined rip-rap (class A-1) (709-05.06) | TON | 1,068 | $75.00 | $90.00 |
| 41 | Machined rip-rap (class B) (709-05.08) | TON | 1,522 | $75.00 | $90.00 |
| 42 | Traffic control (712-01) | LS | 1 | $26,000 | $40,000 |
| 43 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 480 | $50.00 | $40.00 |
| 44 | Warning lights (type A) (712-05.01) | EACH | 10 | $18.00 | $20.00 |
| 45 | Signs (construction) (712-06) | SF | 633 | $6.00 | $7.00 |
| 46 | Temporary barricades (type III) (712-07.03) | LF | 56 | $20.00 | $22.00 |
| 47 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 37 | $1.00 | $1.10 |
| 48 | Perforated/knockout square tube post (713-11.02) | LB | 399 | $3.65 | $4.00 |
| 49 | P post slip base (713-11.21) | EACH | 13 | $500.00 | $550.00 |
| 50 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 52 | $12.00 | $13.00 |
| 51 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 10 | $13.50 | $14.00 |
| 52 | Removal & relocation of sign & support (713-15.02) | EACH | 3 | $100.00 | $110.00 |
| 53 | Remove sign, support & footing (713-15.36) | EACH | 20 | $30.00 | $32.00 |
| 54 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 47 | $100.00 | $105.00 |
| 55 | Contrast pavement marking 6" (716-09.83) | LF | 3,408 | $9.40 | $10.00 |
| 56 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 2.20 | $15,000 | $15,500 |
| 57 | Mobilization (717-01) | LS | 1 | $649,500 | $1,650,000 |
| 58 | Geogrid reinforcement type 2 (740-07.04) | SY | 5,600 | $4.00 | $2.00 |
| 59 | Geotextile (type III)(erosion control) (740-10.03) | SY | 2,220 | $4.70 | $3.00 |
| 60 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 16,468 | $4.10 | $5.50 |
| 61 | Temporary sediment tube 20IN (740-11.04) | LF | 1,840 | $6.00 | $7.00 |
| 62 | Seeding (with mulch) (801-01) | UNIT | 13 | $100.00 | $110.00 |
| 63 | Special wetland seed mixture (801-01.36) | UNIT | 211 | $100.00 | $110.00 |
| 64 | Water (seeding & sodding) (801-03) | MG | 142 | $10.00 | $11.00 |
| 65 | Fraxinus pennsylvanica (green ash seedlng B.R.) (802-12.16) | EACH | 338 | $7.50 | $8.00 |
| 66 | Nyssa aquatica (swamp tupelo seedlng B.R.) (802-12.20) | EACH | 338 | $7.50 | $8.00 |
| 67 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 337 | $7.50 | $8.00 |
| 68 | Quercus phellos (willow oak seedlng B.R.) (802-12.38) | EACH | 337 | $7.50 | $8.00 |
| 69 | Taxodium distichum (bald cypress seedlng B.R.) (802-12.42) | EACH | 337 | $7.50 | $8.00 |
| 70 | Sodding (new sod) (803-01) | SY | 14,091 | $5.00 | $5.50 |
| 71 | Removal of asbestos (EX. BR. no. 79-05757-2.33) (202-01.05) | LS | 1 | $8,000.00 | $4,000.00 |
| 72 | Removal of structures (EX. BR. no. 79-05757-2.33) (202-04.01) | LS | 1 | $50,000 | $35,000 |
| 73 | Removal of structures (EX. BR. no. 79-05757-2.51) (202-04.02) | LS | 1 | $150,000 | $150,000 |
| 74 | Dry excavation (bridges) (204-02.01) | CY | 372 | $20.00 | $38.00 |
| 75 | Granular backfill (bridges) (303-01.02) | TON | 92 | $100.00 | $60.00 |
| 76 | Epoxy coated reinforcing steel (604-02.03) | LB | 427,543 | $1.78 | $1.25 |
| 77 | Class A concrete (bridges) (604-03.01) | CY | 877 | $1,250.00 | $997.50 |
| 78 | Steel bar reinforcement (bridges) (604-03.02) | LB | 60,674 | $1.63 | $1.00 |
| 79 | Pavement @ bridge ends (604-03.04) | SY | 522 | $400.00 | $350.00 |
| 80 | Class DS concrete (604-03.32) | CY | 1,379 | $1,250.00 | $850.00 |
| 81 | Applied texture finish (new structures) (604-04.01) | SY | 4,153 | $18.00 | $14.00 |
| 82 | Bridge deck grooving (mechanical) (604-05.31) | SY | 3,682 | $3.42 | $3.50 |
| 83 | Test piles (precast concrete, size 1) (606-09.01) | LF | 120 | $150.00 | $135.00 |
| 84 | Loading test (precast concrete, size 1) (606-09.02) | EACH | 1 | $5,000.00 | $17,500 |
| 85 | Precast concrete piles (size 1) (606-09.03) | LF | 700 | $90.00 | $130.00 |
| 86 | Pile anchorage system (seismic) (606-12.01) | EACH | 12 | $300.00 | $300.00 |
| 87 | Test piles (steel pipe piles, 14-inch) (606-18.01) | LF | 350 | $250.00 | $200.00 |
| 88 | Loading test (steel pipe piles, 14-inch) (606-18.02) | EACH | 1 | $5,000.00 | $17,500 |
| 89 | Steel pipe piles (14-inch) (606-18.03) | LF | 3,150 | $175.00 | $135.00 |
| 90 | Steel pipe piles (24 in) (606-22.13) | LF | 4,050 | $275.00 | $240.00 |
| 91 | Test piles (steel pipe piles 24 in) (606-22.15) | LF | 450 | $300.00 | $250.00 |
| 92 | Deck drains (grate type 2) (610-10.45) | EACH | 15 | $3,000.00 | $2,750.00 |
| 93 | Prestressed concrete wide bulb tee beam (WBT-54) (615-01.31) | LF | 5,175 | $550.00 | $675.00 |
| 94 | Prestressed concrete box beam (17" X 36") (615-02.02) | LF | 594 | $400.00 | $425.00 |
| 95 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 1,857 | $135.00 | $120.00 |
| 96 | Bike/pedestrian box tube safety rail (707-16.01) | LF | 906 | $155.00 | $275.00 |
| 97 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 276 | $75.00 | $95.00 |
| 98 | 6" pipe underdrain (710-09.02) | LF | 90 | $20.00 | $22.50 |
| 99 | Pda testing (930-01.01) | EACH | 7 | $5,000.00 | $10,000 |
| 100 | Pda RE-strike (930-01.02) | EACH | 7 | $2,500.00 | $8,500.00 |
| 101 | Remove air release valve (795-12.33) | EACH | 4 | $4,155.00 | $4,500.00 |
| 102 | 8IN PVC force main (797-03.07) | LF | 2,305 | $94.00 | $100.00 |
| 103 | 60IN manhole 12FT-14FT depth (797-07.17) | EACH | 3 | $16,825 | $18,000 |
| 104 | 60IN manhole 16FT-20FT depth (797-07.19) | EACH | 1 | $18,000 | $19,000 |
| 105 | DI fittings (797-08.01) | LB | 3,490 | $10.00 | $11.00 |
| 106 | 2IN combo air release valve assembly (797-09.20) | EACH | 4 | $15,575 | $16,500 |
| 107 | Cut and cap 8IN force main (797-09.47) | EACH | 2 | $2,335.00 | $2,750.00 |
| 108 | Connect 8IN sewer to exist. manhole (797-10.02) | EACH | 1 | $5,865.00 | $6,250.00 |
| 109 | Connect to 8IN force main (797-10.18) | EACH | 1 | $4,950.00 | $5,250.00 |
| 110 | Locator wire (see plans) (797-10.51) | LF | 3,500 | $1.00 | $1.10 |
| 111 | Retirein place existing sewer 8IN-14IN (797-11.31) | LF | 3,500 | $10.50 | $11.00 |
| 112 | By-pass pumping (797-11.38) | LS | 1 | $89,500 | $100,000 |
| 113 | HDD 10IN HDPE carrier pipe-uncon (797-15.03) | LF | 1,196 | $270.00 | $275.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.