TDOT contract CN262059 bid tabulation

The repair of the bridges on s.r. 127 over bradley creek at l.m. 6.21 and l.m. 9.76, including grading, drainage, and paving. Let by Tennessee DOT on August 14, 2026, Coffee County. 5 bids received; low bid $5,131,459 by Jones Bros. Contractors, LLC.

Owner
Tennessee DOT
Letting
14 AUG 2026
Pay items
191
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Jones Bros. Contractors, LLC$5,131,459Low
2Mid-State Construction Company, Inc.$5,809,350+13%
3Dement Construction Group, LLC$6,079,095+18%
4Capital City Construction Services, LLC$6,271,027+22%
5Bell & Associates Construction, LLC$7,247,661+41%
TDOT contract CN262059: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Jones Bros. Contractors, LLC2. Mid-State Construction Company, Inc.3. Dement Construction Group, LLC4. Capital City Construction Services, LLC5. Bell & Associates Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$50,000$98,362$75,000$77,314$75,000
2Clearing and grubbing (201-01)LS1$40,000$123,001$245,000$52,041$85,000
3Removal of pipe (15" RCP, sta. 103+82.63 22.96 LT.) (202-02.01)LF27$15.00$30.75$28.00$41.30$45.00
4Removal of pipe (18" RCP, sta. 103+97.88 22.57 RT.) (202-02.02)LF42$15.00$30.75$28.00$41.30$40.00
5Removal of pipe (18" RCP, sta. 9+92.74 33.41 RT.) (202-02.03)LF29$15.00$30.75$30.00$41.30$45.00
6Removal of pipe (6" PVC, sta. 10+50 RT.) (202-02.04)LF104$5.00$30.75$28.00$41.30$35.00
7Road & drainage excavation (unclassified) (203-01)CY1,604$40.00$34.20$45.00$59.98$70.00
8Road & drainage excavation (stream mitigation) (203-01.13)CY3,500$30.00$34.20$50.00$57.07$40.00
9Borrow excavation (unclassified) (203-03)CY611$40.00$36.48$45.00$52.69$90.00
10Placing and spreading topsoil (203-04)CY692$35.00$30.78$25.00$38.46$50.00
11Water (203-06)MG27$10.00$114.00$10.00$15.00$50.00
12Natural streambed material(removal-storage-placement) (203-20.02)CY1,600$28.00$13.68$50.00$60.13$44.00
13Construction of haul road (203-50)LS1$1,000.00$151,379$135,000$145,470$115,300
1418" temporary slope drain (209-02.07)LF183$25.00$27.93$25.00$66.92$80.00
15Stream mitigation-coconut fiber rolls (209-03.31)LF145$55.00$28.50$125.00$20.73$60.00
16Stream mitigation - live brush layering (209-03.42)LF145$272.00$171.00$155.00$65.66$300.00
17Placing native stone in new channel (209-03.66)SY200$100.00$57.00$92.00$61.23$110.00
18Stream mitigation – wood toe W/reinforced earth (209-03.67)LF145$220.00$228.00$165.00$84.46$240.00
19Protected area marker (white with decal) (209-03.99)EACH16$180.00$285.00$255.00$183.67$300.00
20Sediment removal (209-05)CY44$20.00$24.60$25.00$139.16$10.00
21Temporary silt fence (with backing) (209-08.02)LF7,318$4.00$5.68$4.98$4.08$5.00
22Rock check dam (209-08.07)EACH4$800.00$792.87$695.50$714.29$750.00
23Enhanced rock check dam (209-08.08)EACH11$1,000.00$969.00$850.00$714.29$900.00
24Sandbags (209-09.01)BAG2,113$5.00$0.10$16.00$6.12$3.00
25Sediment filter bag(15' X 10') (209-09.04)EACH10$600.00$423.12$775.00$326.53$450.00
26Polyethylene sheeting (6 mil. minimum) (209-20.03)SY24$8.00$11.40$20.00$4.00$12.00
27Temporary in stream diversion (209-65.04)LF1,087$30.00$54.87$60.00$56.33$100.00
28Mineral aggregate, type A base, grading D (303-01)TON2,321$47.00$35.91$31.48$47.59$45.00
29Mineral aggregate (size 57) (303-10.01)TON28$75.00$54.12$80.00$136.99$95.00
30Mineral aggregate (size 57) (303-10.04)TON1,200$55.00$44.64$50.00$67.01$55.00
31Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON56$186.00$427.50$375.00$663.27$450.00
32Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON163$188.00$250.80$220.00$239.80$250.00
33Bituminous material for tack coat (TC) (403-01)TON3$1,050.00$1,197.00$1,050.00$2,040.82$1,100.00
34Saw cutting asphalt pavement (407-20.05)LF1,822$8.00$9.12$10.00$3.57$3.75
35Acs mix(PG64-22) grading D (411-01.10)TON431$203.00$250.80$230.00$255.10$230.00
36Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM0.70$12,700$1,711.14$1,500.00$5,102.04$1,500.00
37Cold planing bituminous pavement (415-01.02)SY5,133$7.45$6.84$6.00$5.10$6.50
3818" pipe culvert (side drain) (607-39.02)LF24$80.00$85.50$57.00$140.74$70.00
3924" pipe culvert (side drain) (607-39.03)LF89$100.00$108.30$71.00$158.07$125.00
40Class A concrete (pipe endwalls) (611-07.01)CY1.50$3,000.00$2,850.00$2,000.00$3,468.70$6,500.00
41Steel bar reinforcement (pipe endwalls) (611-07.02)LB70$1.40$3.42$10.00$0.99$3.00
4218IN endwall (side drain) (611-07.31)EACH2$5,000.00$5,130.00$8,000.00$8,859.75$7,100.00
4324IN endwall (side drain) (611-07.32)EACH3$6,400.00$6,270.00$8,000.00$10,274$10,000
4418" temporary drainage pipe (621-03.02)LF428$25.00$54.72$30.00$47.36$100.00
4524" temporary drainage pipe (621-03.03)LF184$45.00$71.82$30.00$58.28$100.00
4636" temporary drainage pipe (621-03.05)LF138$60.00$117.42$30.00$75.62$130.00
47Earth pad for type 38 GR end treatment (705-04.09)EACH8$1,000.00$1,140.00$1,000.00$1,020.41$1,050.00
48W beam GR (type 2) MASH TL-3 (705-06.01)LF856.25$25.00$31.35$27.50$28.06$30.00
49GR terminal (in-inline) MASH TL-3 (705-06.11)EACH2$1,000.00$1,710.00$1,500.00$1,530.61$1,600.00
50Tangent energy absorbing term MASH TL-3 (705-06.20)EACH8$3,200.00$3,705.00$3,250.00$3,316.33$3,350.00
51Thrie beam bridge transition MASH TL-3 (705-06.25)EACH8$2,900.00$3,420.00$3,000.00$3,061.22$3,200.00
52Guardrail removed (706-01)LF840$2.00$1.14$1.00$1.02$1.00
53Radius rail (706-06.03)LF45$27.00$33.63$29.50$30.10$32.00
54Rounded end element (706-10.26)EACH2$100.00$114.00$100.00$102.04$105.00
55Removal of fence (combination of woven wire and wooded) (707-06.01)LF1,250$4.00$15.54$6.00$9.80$8.00
56High-visibility construction fence (707-08.11)LF2,894$2.50$2.85$2.50$2.55$2.75
57Markers (concrete R.O.W. posts) (708-02.01)EACH32$300.00$292.17$320.00$500.00$800.00
58Machined rip-rap (class A-3) (709-05.05)TON200$56.00$43.45$55.00$109.31$80.00
59Machined rip-rap (class A-1) (709-05.06)TON207$56.00$50.12$55.00$107.23$80.00
60Machined rip-rap (class B) (709-05.08)TON1,226$50.00$45.67$55.00$98.02$75.00
61Machined rip-rap (class C) (709-05.09)TON1,419$50.00$45.65$55.00$91.22$75.00
62Rock riffles (709-05.81)LS1$34,600$31,350$50,000$37,924$36,000
63Traffic control (712-01)LS1$50,000$54,580$75,000$21,429$30,000
64Portable barrier rail (MASH TL-3) (712-02.10)LF380$55.00$68.40$60.00$57.61$95.00
65Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12)LF440$70.00$68.40$100.00$57.61$145.00
66Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH2$6,105.00$6,959.70$6,105.00$6,229.59$6,700.00
67Flexible drums (channelizing) (712-04.01)EACH60$24.00$27.36$24.00$24.49$25.00
68Barrier rail delineator (712-04.50)EACH25$13.00$14.82$13.00$13.27$14.00
69Warning lights (type A) (712-05.01)EACH8$22.00$25.08$22.00$22.45$22.00
70Signs (construction) (712-06)SF1,321$6.98$7.96$6.98$7.12$7.75
71Temporary barricades (type III) (712-07.03)LF72$24.00$27.36$24.00$24.49$26.00
72Removable pavement marking (8" barrier line) (712-09.02)LF3,270$3.05$4.56$4.00$5.10$4.00
73Removable pavement marking (stop line) (712-09.04)LF24$9.00$28.50$25.00$30.61$26.00
74Removable pavement marking (6" line) (712-09.08)LF4,000$2.58$3.99$3.50$4.08$3.75
75"U" section steel posts (713-11.01)LB46$3.32$3.78$3.32$3.39$3.50
76Flat sheet aluminum signs (0.100" thick) (713-13.03)SF10$16.32$18.61$16.32$16.65$18.00
77Removal of signs, posts and footings (713-15)LS1$100.00$114.00$100.00$102.04$110.00
78Changeable message sign unit (713-16.01)EACH4$5,495.00$6,264.30$5,495.00$5,607.14$6,000.00
79Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH40$37.00$68.40$60.00$102.04$65.00
80Removal of snowplowable reflective marker (716-01.30)EACH13$10.00$28.50$25.00$51.02$25.00
81Removal of pavement marking (line) (716-08.20)LM2$5,280.00$3,420.00$3,000.00$5,102.04$3,200.00
82Wet reflective pavement marking(6" line) (716-09.03)LM0.20$18,000$39,330$34,500$61,224$36,000
83Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM2$6,700.00$10,830$9,500.00$8,163.27$10,500
84Mobilization (717-01)LS1$500,000$576,307$607,161$184,200$717,500
85Temporary traffic signal system (730-40.02)LS1$95,000$117,042$84,500$111,225$65,000
86Geogrid reinforcement type 2 (740-07.04)SY1,836$4.00$6.37$5.50$6.00$5.00
87Geotextile (type III)(erosion control) (740-10.03)SY713$4.00$3.42$4.00$3.47$5.00
88Geotextile (type IV)(stabilization) (740-10.04)SY924$5.00$7.04$5.50$3.83$5.00
89Temporary sediment tube 20IN (740-11.04)LF1,966$4.15$4.56$4.00$4.23$4.50
906IN dia PVC pipe (790-42.11)LF127$20.00$44.46$50.00$35.00$72.00
91Seeding (with mulch) (801-01)UNIT39$58.00$142.50$50.00$59.18$110.00
92Temporary seeding (with mulch) (801-01.07)UNIT133$30.00$45.60$33.50$30.61$34.00
93Grass seed mix (ripzn/FLPL) W/mulch (801-01.35)UNIT17$99.00$456.00$100.00$101.02$138.00
94Special wetland seed mixture (801-01.36)UNIT2$400.00$256.50$225.00$408.16$250.00
95Natve seed MX final stablizatn of slopes (801-01.38)UNIT6$140.00$228.00$200.00$142.86$220.00
96Seeding (without mulch) (801-02)UNIT30$32.00$35.91$31.50$32.65$35.00
97Water (seeding & sodding) (801-03)MG22$100.00$114.00$100.00$102.04$110.00
98Cuttings: salix nigra (18IN-24IN length) (802-02.30)EACH35$8.90$12.35$10.83$9.08$11.00
99Cuttings: salix sericea (18IN-24IN) (802-02.31)EACH35$8.90$12.35$10.83$9.08$11.00
100Cuttings: cornus amomum (18IN-24IN) (802-02.32)EACH35$8.90$21.95$19.25$9.08$11.00
101Cuttings: sambucus canadensis (18IN-24IN) (802-02.33)EACH35$8.90$12.35$10.83$9.08$11.00
102Acer negundo (box elder seedlng B.R.) (802-12.01)EACH50$12.00$12.35$10.83$12.24$13.00
103Acer rubrum (red maple seedlng B.R.) (802-12.02)EACH4$12.00$12.35$10.83$12.24$12.00
104Acer saccharinum (silver maple seedlng B.R.) (802-12.03)EACH4$12.00$12.35$10.83$12.24$12.00
105Betula nigra (river birch seedlng B.R.) (802-12.07)EACH46$12.00$12.35$10.83$12.24$13.00
106Diospyros virginiana (persimmon seedlng B.R.) (802-12.14)EACH46$12.00$12.35$10.83$12.24$13.00
107Fraxinus pennsylvanica (green ash seedlng B.R.) (802-12.16)EACH30$12.00$12.35$10.83$12.24$13.00
108Juglans nigra (black walnut seedlng B.R.) (802-12.17)EACH46$12.00$12.35$10.83$12.24$13.00
109Liquidamber styraciflua (sweetgum seedlng B.R.) (802-12.18)EACH4$12.00$12.35$10.83$12.24$12.00
110Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19)EACH46$12.00$12.35$10.83$12.24$13.00
111Nyssa aquatica (swamp tupelo seedlng B.R.) (802-12.20)EACH4$12.00$12.35$10.83$12.24$12.00
112Platanus occidentalis (sycamore seedlng B.R.) (802-12.26)EACH46$12.00$12.35$10.83$12.24$17.00
113Quercus bicolor (swamp white oak seedlng B.R.) (802-12.30)EACH4$12.00$12.35$10.83$12.24$12.00
114Quercus phellos (willow oak seedlng B.R.) (802-12.38)EACH46$12.00$12.35$10.83$12.24$13.00
115Carpinus caroliniana (american hornbeam seedling B.R.) (802-12.45)EACH30$12.00$12.35$10.83$12.24$14.00
116Cornus amomum (silky dogwood SDLNG bare root) (802-13.54)EACH30$12.00$12.35$10.83$12.24$14.00
117Hamamelis virginiana (witch hazel SDLNG bare root) (802-13.55)EACH30$12.00$12.35$10.83$12.24$14.00
118Lindera benzoin (spicebush SDLNG bare root) (802-13.59)EACH30$12.00$12.35$10.83$12.24$14.00
119Sodding (new sod) (803-01)SY1,720$7.10$6.84$6.00$7.24$6.50
120Turf reinforcement mat (class III) (805-01.03)SY214.20$9.40$5.69$4.99$9.59$5.50
121Erosion control blanket (type II) (805-12.02)SY2,029$1.00$1.25$1.10$1.02$1.25
122700 gram coir fiber erosion blanket (805-12.08)SY970$4.70$11.40$7.50$4.80$12.00
123Removal of structures (bridge no. 16-SR127-06.21) (202-04.01)LS1$85,000$93,388$50,000$170,250$125,000
124Removal of structures (bridge no. 16-SR127-09.76) (202-04.02)LS1$85,000$130,643$125,000$160,875$110,000
125Dry excavation (bridges) (204-02.01)CY2,095$35.00$53.36$38.00$42.45$70.00
126Core drilling for piles(rock) (204-14)LF70$850.00$342.00$300.00$361.22$425.00
127Core drilling for piles(soil) (204-15)LF92$790.00$342.00$300.00$271.43$420.00
128Granular backfill (bridges) (303-01.02)TON72$75.00$47.21$100.00$150.68$60.00
129Epoxy coated reinforcing steel (604-02.03)LB64,606$2.00$2.41$1.90$1.52$2.25
130Class A concrete (bridges) (604-03.01)CY143$1,300.00$1,321.03$1,100.00$1,655.44$1,850.00
131Pavement @ bridge ends (604-03.04)SY434$430.00$421.16$425.00$495.81$550.00
132Class DS concrete (604-03.32)CY186$1,500.00$1,417.92$1,500.00$1,365.89$1,900.00
133Applied texture finish (new structures) (604-04.01)SY780$20.00$18.24$16.00$15.00$17.00
134Bridge deck grooving (mechanical) (604-05.31)SY1,110$10.00$8.41$7.38$7.53$9.00
135Remove existing wearing surface (604-10.14)LS1$57,500$43,320$45,000$18,750$50,000
136Steel piles (12 inch) (606-03.03)LF857$100.00$139.42$70.00$177.55$150.00
137Pile tips (steel piles, 12 inch) (606-03.06)EACH14$165.00$388.11$225.00$240.63$240.00
138Prestressed concrete box beam (33" X 36") (615-02.05)LF700$502.00$509.91$475.00$491.13$450.00
139Concrete railing (620-06)LF374$200.00$166.55$350.00$310.19$575.00
140Temporary shoring (bridge no. 16-SR127-06.21) (621-05.10)LS1$25,000$30,750$100,000$50,000$125,000
1416" perforated pipe with vertical drain system (710-09.01)LF230$50.00$45.39$45.00$60.00$60.00
1426" pipe underdrain (710-09.02)LF136$18.00$31.92$25.00$30.00$30.00
1432IN steel gas main (791-01.02)LF10$729.00$831.06$650.00$663.27$720.00
1446IN steel gas main (791-01.05)LF600$98.00$111.72$290.00$295.92$320.00
145HDD 6IN steel pipe - unconsolidated (791-04.23)LF1,005$260.00$296.40$435.00$443.88$480.00
146Connect to 6IN EX. STL main W/ stopple (791-06.33)EACH6$21,200$24,168$27,000$27,551$28,000
1472IN steel gas valve assembly (791-07.09)EACH2$5,250.00$5,985.00$4,500.00$4,591.84$4,750.00
1486IN steel gas valve assembly (791-07.11)EACH3$36,750$41,895$43,000$43,878$47,750
149Pole 35FT class 4 wood (793-01.07)EACH2$975.00$1,111.50$3,500.00$4,122.45$3,800.00
150Anchor 3/4IN (793-01.40)EACH6$487.50$555.75$800.00$942.86$875.00
151Install pole number (793-01.99)EACH1$63.00$71.82$120.00$201.02$130.00
152Guy wire 10M or 3/8IN (793-02.08)EACH10$142.50$162.45$275.00$387.76$305.00
153Install guy guard (793-02.99)EACH8$28.20$32.15$90.00$95.41$100.00
15410M strand (793-03.03)LF2,868$3.45$3.93$3.95$5.82$4.50
155Install strand bond (793-03.40)EACH6$34.80$39.67$50.00$189.80$55.00
156Relash/delash cable (793-04.01)LF1,400$2.03$2.31$3.26$4.69$3.50
157Aerial splice closure (793-04.07)EACH7$900.00$1,026.00$850.00$1,076.53$943.00
158Aerial splice closure (3M) (793-04.13)EACH7$1,702.50$1,940.85$1,000.00$1,306.12$1,100.00
15996 fiber(material only) (793-07.05)LF1,100$2.61$2.98$2.23$2.81$2.50
160144 fiber(material only) (793-07.07)LF2,734$3.19$3.64$3.01$3.83$3.50
161192 fiber(material only) (793-07.08)LF2,734$4.43$5.05$2.89$4.08$3.20
162288 fiber(material only) (793-07.10)LF2,200$5.25$5.99$3.39$4.85$3.75
163108-144 fiber(installation only) (793-07.17)LF3,268$2.33$2.66$3.12$4.08$3.50
164192-216 fiber(installation only) (793-07.18)LF1,734$2.63$3.00$3.12$4.08$3.50
165Single fiber optic cable splice (793-07.25)EACH6$52.50$59.85$50.00$98.98$55.50
166120 fiber(material only) (793-07.26)LF1,634$3.19$3.64$3.01$3.47$3.50
167Hot splice existing fiber cables (793-07.41)EACH2,424$37.65$42.92$46.60$72.45$50.00
168Install fiber storage bracket (793-07.90)EACH22$142.50$162.45$235.00$322.45$260.00
169Rearrange existing fiber storage bracket (793-07.91)EACH2$96.75$110.30$100.00$126.53$111.00
170Buried cable @ 36IN depth (793-10.02)LF4,400$5.63$6.42$5.90$17.35$6.50
171Buried riser guard (793-11.13)EACH20$236.25$269.33$300.00$408.16$333.00
1722 pair buried drop (793-11.14)LF950$8.10$9.23$5.09$7.35$5.00
173Rearrange existing splice case (793-11.50)EACH2$525.00$598.50$250.00$318.37$277.00
174Transfer cable attachment (793-15.01)EACH22$139.80$159.37$325.00$254.08$360.00
175Transfer drop attachment (793-15.02)EACH1$46.50$53.01$215.00$282.65$238.00
176HDD 2IN PVC casing in rock (793-15.21)LF200$209.50$238.83$115.00$135.71$128.00
177Directional bore 2IN/flex sleeve (793-16.02)LF400$33.30$37.96$37.00$69.90$41.00
178Remove aerial cable and wire (793-98.01)LF5,356$1.20$1.37$1.41$2.04$1.50
179Remove poles all sizes (793-98.04)EACH10$120.00$136.80$360.00$556.12$400.00
180Remove anchor (any size) (793-98.08)EACH3$48.00$54.72$95.00$126.53$106.00
181Remove down guy (793-98.09)EACH10$36.00$41.04$95.00$126.53$106.00
182Trim utility right-of-way (793-98.21)LF200$6.00$6.84$9.94$14.29$11.00
1834IN dip slip joint water line (795-01.02)LF700$140.00$159.60$84.00$160.20$200.00
1846IN dip slip joint water line (795-01.04)LF620$140.00$159.60$72.00$153.06$184.00
185Bore/jack 12IN steel casing pipe-rock. (795-05.77)LF120$600.00$684.00$822.00$1,035.71$1,620.00
1864IN gate valve assembly (795-08.03)EACH2$3,100.00$3,534.00$1,843.00$1,887.76$4,196.00
1876IN gate valve assembly (795-08.04)EACH2$3,700.00$4,218.00$2,378.00$2,489.80$4,830.00
1883/4IN service pipe (795-09.37)LF150$40.00$45.60$41.00$63.27$160.00
189DI fittings (795-13.01)LB1,500$12.00$13.68$12.00$15.31$15.31
190Class B concrete (795-14.02)CY25$350.00$399.00$413.00$306.12$550.00
191Relocate/reconnect 3/4IN water meter assembly (795-16.16)EACH3$3,000.00$3,420.00$1,293.00$1,387.76$1,430.00
TDOT contract CN262059: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy