TDOT contract CN263055 bid tabulation
The grading, drainage, construction of concrete box beam bridges, retaining wall, and paving on u.s. 31 (s.r. 6, east main street) over the harpeth river (l.m. 12.51). Let by Tennessee DOT on June 26, 2026, Williamson County. 5 bids received; low bid $11,957,571 by Bell & Associates Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 189
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bell & Associates Construction, LLC | $11,957,571 | Low |
| 2 | Capital City Construction Services, LLC | $11,999,908 | 0.0% |
| 3 | MasTec Civil, LLC | $12,211,920 | +2.0% |
| 4 | Dement Construction Group, LLC | $13,662,194 | +14% |
| 5 | Jones Bros. Contractors, LLC | $19,471,519 | +63% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bell & Associates Construction, LLC | 2. Capital City Construction Services, LLC | 3. MasTec Civil, LLC | 4. Dement Construction Group, LLC | 5. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $69,388 | $75,000 | $255,000 | $80,000 | $40,750 |
| 2 | CPM project schedule (108-03) | LS | 1 | $39,898 | $45,000 | $20,000 | $75,000 | $36,225 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $72,089 | $154,737 | $200,000 | $725,000 | $50,000 |
| 4 | Removal of pipe (18 inch) (202-02.21) | LF | 69 | $88.00 | $84.21 | $100.00 | $45.00 | $100.00 |
| 5 | Removal of pipe (48 inch) (202-02.22) | LF | 65 | $397.00 | $105.26 | $95.00 | $80.00 | $500.00 |
| 6 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 328 | $68.00 | $26.00 | $33.00 | $11.00 | $75.00 |
| 7 | Removal of rigid pavement (202-03.02) | CY | 104 | $33.00 | $68.00 | $135.00 | $16.00 | $170.00 |
| 8 | Removal of structures (existing endwalls sta. 106+24.62) (202-04.02) | LS | 1 | $897.00 | $857.89 | $5,000.00 | $2,500.00 | $7,500.00 |
| 9 | Removal of structures (existing endwalls sta. 106+29.79) (202-04.03) | LS | 1 | $897.00 | $857.89 | $5,000.00 | $2,500.00 | $7,500.00 |
| 10 | Removal of structures (existing catch basins) (202-04.04) | LS | 1 | $1,101.00 | $1,052.63 | $5,000.00 | $2,500.00 | $7,500.00 |
| 11 | Removal of structures (existing retaining walls) (202-04.05) | LS | 1 | $8,924.00 | $2,631.58 | $5,000.00 | $25,000 | $9,000.00 |
| 12 | Removal of structures (existing endwalls sta. 103+64.27) (202-04.06) | LS | 1 | $10,937 | $1,052.63 | $5,000.00 | $2,500.00 | $7,000.00 |
| 13 | Removal of curb and gutter (station 102+46.51 to 107+40.01) (202-08.15) | LF | 388 | $24.00 | $14.74 | $31.00 | $8.00 | $20.00 |
| 14 | Road & drainage excavation (unclassified) (203-01) | CY | 773 | $86.00 | $92.89 | $40.00 | $40.00 | $125.00 |
| 15 | Borrow excavation (unclassified) (203-03) | CY | 1,059 | $53.00 | $102.30 | $29.00 | $35.00 | $55.00 |
| 16 | Placing and spreading topsoil (203-04) | CY | 174 | $40.00 | $137.55 | $28.00 | $30.00 | $130.00 |
| 17 | Water (203-06) | MG | 2 | $50.00 | $14.29 | $118.00 | $25.00 | $500.00 |
| 18 | Channel substrate (203-20.01) | CY | 383 | $56.00 | $45.00 | $30.00 | $40.00 | $150.00 |
| 19 | Construction of haul road (203-50) | LS | 1 | $406,827 | $325,000 | $150,000 | $875,000 | $900,000 |
| 20 | Sediment removal (209-05) | CY | 28 | $30.00 | $106.85 | $57.00 | $10.00 | $70.00 |
| 21 | Temporary silt fence (with backing) (209-08.02) | LF | 2,313 | $5.20 | $5.89 | $6.00 | $5.60 | $4.75 |
| 22 | Enhanced rock check dam (209-08.08) | EACH | 5 | $826.00 | $747.37 | $781.00 | $710.00 | $4,000.00 |
| 23 | Sediment filter bag(15' X 10') (209-09.04) | EACH | 3 | $4,630.00 | $436.84 | $500.00 | $415.00 | $1,300.00 |
| 24 | Curb inlet protection (type 4) (209-09.43) | EACH | 15 | $242.00 | $168.42 | $176.00 | $160.00 | $220.00 |
| 25 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 1,226 | $3.86 | $4.29 | $5.00 | $5.00 | $6.00 |
| 26 | Catch basin protection (type D) (209-40.33) | EACH | 3 | $495.00 | $142.11 | $150.00 | $135.00 | $450.00 |
| 27 | Catch basin filter assembly(type 7) (209-40.47) | EACH | 3 | $1,652.00 | $1,284.21 | $1,345.00 | $1,220.00 | $1,500.00 |
| 28 | Temporary diversion channel (209-65.03) | LF | 315 | $118.00 | $37.99 | $8.75 | $25.00 | $80.00 |
| 29 | Temporary in stream diversion (209-65.04) | LF | 509 | $316.00 | $194.81 | $100.00 | $75.00 | $180.00 |
| 30 | Mineral aggregate, type A base, grading D (303-01) | TON | 442 | $96.00 | $87.07 | $92.00 | $52.00 | $80.00 |
| 31 | Mineral aggregate (size 57) (303-10.01) | TON | 975 | $101.00 | $80.99 | $65.00 | $55.00 | $90.00 |
| 32 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 56 | $451.00 | $654.58 | $451.00 | $410.00 | $550.00 |
| 33 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 37 | $710.00 | $968.98 | $709.00 | $645.00 | $750.00 |
| 34 | Bituminous material for prime coat (PC) (402-01) | TON | 3 | $1,938.00 | $5,058.73 | $1,936.00 | $1,760.00 | $1,075.00 |
| 35 | Aggregate for cover material (PC) (402-02) | TON | 2 | $269.00 | $2,514.40 | $270.00 | $245.00 | $50.00 |
| 36 | Bituminous material for tack coat (TC) (403-01) | TON | 1 | $1,431.00 | $1,367.48 | $1,430.00 | $1,300.00 | $950.00 |
| 37 | Saw cutting asphalt pavement (407-20.05) | LF | 179 | $4.40 | $21.05 | $8.00 | $7.00 | $25.00 |
| 38 | Acs mix(PG70-22) grading D (411-02.10) | TON | 125 | $297.00 | $626.19 | $297.00 | $270.00 | $440.00 |
| 39 | Cold planing bituminous pavement (415-01.01) | TON | 102 | $154.00 | $213.79 | $154.00 | $140.00 | $275.00 |
| 40 | Retaining wall (R1, S.R. 6 sta. 103+52.45 - sta. 103+54.04) (604-07.01) | SF | 10 | $1,340.00 | $142.86 | $586.00 | $2,750.00 | $2,500.00 |
| 41 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 45 | $484.00 | $463.16 | $232.00 | $150.00 | $200.00 |
| 42 | 48" concrete pipe culvert (class III) (607-09.02) | LF | 69 | $1,371.00 | $1,310.53 | $365.00 | $325.00 | $400.00 |
| 43 | Class A concrete (pipe endwalls) (611-07.01) | CY | 8 | $3,458.00 | $3,305.26 | $2,700.00 | $1,750.00 | $3,600.00 |
| 44 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 273 | $11.00 | $10.53 | $1.10 | $5.75 | $8.00 |
| 45 | Adjustment of existing catchbasin (611-09.01) | EACH | 1 | $3,535.00 | $3,378.95 | $1,950.00 | $5,000.00 | $4,000.00 |
| 46 | Catchbasin retrofit (611-09.04) | EACH | 1 | $7,621.00 | $7,284.21 | $730.00 | $8,500.00 | $4,500.00 |
| 47 | Catch basin, 96IN round,> 4FT-8FT depth (611-60.40) | EACH | 2 | $20,426 | $19,522 | $14,000 | $25,000 | $25,000 |
| 48 | Temporary shoring (621-05.03) | LS | 1 | $53,563 | $56,968 | $11,000 | $350,000 | $200,000 |
| 49 | Concrete sidewalk (4 ") (701-01.01) | SF | 1,459 | $9.00 | $10.53 | $9.00 | $8.25 | $8.25 |
| 50 | Concrete combined curb & gutter (702-03) | CY | 17 | $647.00 | $842.11 | $647.00 | $588.00 | $588.00 |
| 51 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 69 | $38.00 | $36.84 | $39.00 | $33.80 | $35.00 |
| 52 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 1 | $3,083.00 | $2,947.37 | $3,100.00 | $2,300.00 | $2,800.00 |
| 53 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 1 | $3,524.00 | $3,368.42 | $3,520.00 | $3,145.00 | $3,200.00 |
| 54 | Removal of fence (wood fence) (707-06.01) | LF | 433 | $5.50 | $14.29 | $6.00 | $5.00 | $5.00 |
| 55 | Removal and reset fence (sta. 103+34.16 - 103+49.94) (707-06.03) | LF | 66 | $94.00 | $85.71 | $33.00 | $35.00 | $150.00 |
| 56 | Fence (wood) (707-08.01) | LF | 433 | $49.00 | $62.11 | $31.00 | $45.00 | $45.00 |
| 57 | High-visibility construction fence (707-08.11) | LF | 708 | $4.30 | $2.84 | $3.30 | $2.70 | $3.90 |
| 58 | Pedestrian construction barrier fence (707-11.01) | LF | 123 | $30.80 | $40.00 | $50.00 | $28.00 | $28.00 |
| 59 | Machined rip-rap (class A-3) (709-05.05) | TON | 150 | $47.00 | $78.95 | $94.00 | $50.00 | $80.00 |
| 60 | Machined rip-rap (class A-1) (709-05.06) | TON | 846 | $69.00 | $84.21 | $83.00 | $50.00 | $80.00 |
| 61 | Machined rip-rap (class B) (709-05.08) | TON | 2,505 | $61.00 | $78.95 | $83.00 | $60.00 | $85.00 |
| 62 | Machined rip-rap (class C) (709-05.09) | TON | 190 | $82.00 | $131.58 | $93.00 | $60.00 | $90.00 |
| 63 | Traffic control (712-01) | LS | 1 | $126,512 | $24,737 | $90,000 | $100,000 | $365,000 |
| 64 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 652 | $24.00 | $63.16 | $93.00 | $35.00 | $91.21 |
| 65 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 324 | $149.00 | $94.74 | $93.00 | $100.00 | $235.31 |
| 66 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $6,481.00 | $7,894.74 | $6,500.00 | $5,885.00 | $10,000 |
| 67 | Flexible drums (channelizing) (712-04.01) | EACH | 78 | $31.00 | $48.42 | $32.00 | $29.00 | $46.00 |
| 68 | Barrier rail delineator (712-04.50) | EACH | 33 | $16.00 | $10.53 | $16.50 | $15.00 | $10.00 |
| 69 | Warning lights (type A) (712-05.01) | EACH | 23 | $22.00 | $26.32 | $22.00 | $20.00 | $25.00 |
| 70 | Signs (construction) (712-06) | SF | 634 | $7.50 | $7.89 | $8.00 | $6.85 | $7.50 |
| 71 | Temporary barricades (type II) (712-07.02) | LF | 40 | $24.00 | $25.26 | $24.00 | $22.00 | $24.00 |
| 72 | Temporary barricades (type III) (712-07.03) | LF | 40 | $27.00 | $21.05 | $28.00 | $25.00 | $20.00 |
| 73 | Square tube sign support (713-11.05) | LB | 268 | $16.00 | $15.79 | $8.80 | $15.00 | $15.00 |
| 74 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 48 | $22.00 | $21.05 | $18.00 | $20.00 | $20.00 |
| 75 | Removal of signs, posts and footings (713-15) | LS | 1 | $275.00 | $263.16 | $3,300.00 | $250.00 | $250.00 |
| 76 | Changeable message sign unit (713-16.01) | EACH | 4 | $6,553.00 | $10,000 | $6,545.00 | $5,950.00 | $9,500.00 |
| 77 | Encased conduit (2" PVC, schedule 80) (714-02.01) | LF | 585 | $24.00 | $23.16 | $13.00 | $22.00 | $12.00 |
| 78 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 100 | $24.00 | $23.16 | $27.00 | $22.00 | $24.00 |
| 79 | Pull boxes (type C) (714-05.04) | EACH | 2 | $1,321.00 | $1,263.16 | $2,185.00 | $1,200.00 | $2.00 |
| 80 | Cable (1/C # 8 AWG) (714-06.04) | LF | 1,370 | $2.75 | $2.63 | $3.40 | $2.50 | $3.00 |
| 81 | Cable (1/C # 2 AWG) (714-06.07) | LF | 2,055 | $4.50 | $4.32 | $7.80 | $4.10 | $6.90 |
| 82 | Cable (#8 copper soft drawn bare) (714-06.08) | LF | 685 | $2.75 | $2.63 | $3.00 | $2.50 | $2.50 |
| 83 | Cable (#2 copper soft drawn bare) (714-06.09) | LF | 685 | $4.50 | $4.32 | $6.50 | $4.10 | $5.70 |
| 84 | Removal of light standard (714-08.34) | EACH | 3 | $1,101.00 | $1,052.63 | $510.00 | $1,000.00 | $456.00 |
| 85 | Modify exist control center(no. 1) (714-12.11) | EACH | 1 | $2,907.00 | $2,778.95 | $4,000.00 | $2,640.00 | $3,565.00 |
| 86 | Electrical connection (to control center no. 1) (714-25.01) | LS | 1 | $11,718 | $11,200 | $4,500.00 | $10,640 | $3,995.00 |
| 87 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 44 | $55.00 | $52.63 | $40.00 | $50.00 | $40.00 |
| 88 | Plastic pavement marking (stop line) (716-02.05) | LF | 49 | $27.00 | $26.32 | $20.00 | $25.00 | $30.00 |
| 89 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 5 | $275.00 | $263.16 | $186.00 | $250.00 | $300.00 |
| 90 | Plastic word pavement marking (only) (716-03.01) | EACH | 4 | $495.00 | $473.68 | $462.00 | $450.00 | $650.00 |
| 91 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 1 | $385.00 | $368.42 | $339.00 | $350.00 | $550.00 |
| 92 | Painted pavement markings(8" line) (716-05.49) | LM | 1.90 | $2,753.00 | $2,631.58 | $1,693.00 | $2,500.00 | $2,600.00 |
| 93 | Removal of pavement marking (line) (716-08.01) | LF | 14,090 | $1.35 | $1.32 | $1.13 | $1.25 | $1.00 |
| 94 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 88 | $30.00 | $29.47 | $10.15 | $28.00 | $15.00 |
| 95 | Removal of pavement marking (stop line) (716-08.05) | LF | 52 | $11.00 | $10.53 | $8.00 | $10.00 | $15.00 |
| 96 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 4 | $110.00 | $105.26 | $74.00 | $100.00 | $100.00 |
| 97 | Removal of word pavement marking (only) (716-08.11) | EACH | 4 | $132.00 | $126.32 | $74.00 | $120.00 | $200.00 |
| 98 | Contrast pavement marking 6" (716-09.86) | LM | 0.20 | $27,535 | $26,316 | $20,300 | $25,000 | $50,000 |
| 99 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.70 | $9,361.00 | $8,947.37 | $8,500.00 | $8,500.00 | $15,000 |
| 100 | Enhanced flat line thermo (8IN line) (716-12.06) | LF | 491 | $2.20 | $2.11 | $2.25 | $2.00 | $4.00 |
| 101 | Mobilization (717-01) | LS | 1 | $1,076,181 | $951,817 | $1,221,000 | $1,364,091 | $1,900,000 |
| 102 | Install pull box (fiber optic-type A) (730-03.23) | EACH | 6 | $3,854.00 | $3,684.21 | $3,800.00 | $3,500.00 | $3,380.00 |
| 103 | Fiber optic cable (48F) (730-03.50) | LF | 895 | $3.30 | $3.16 | $8.50 | $3.00 | $7.80 |
| 104 | Modify existing electrical service connection (730-05.04) | EACH | 1 | $3,154.00 | $3,014.74 | $6,500.00 | $2,864.00 | $5,770.00 |
| 105 | Conduit 3" diameter (PVC schedule 40) (730-12.03) | LF | 210 | $28.00 | $27.37 | $36.00 | $26.00 | $32.00 |
| 106 | Conduit 3" diameter (directional bore) (730-12.24) | LF | 70 | $88.00 | $84.21 | $132.00 | $80.00 | $118.00 |
| 107 | Encased conduit 3" diameter (730-12.38) | LF | 315 | $13.00 | $12.63 | $21.00 | $12.00 | $19.00 |
| 108 | Geogrid reinforcement type 2 (740-07.04) | SY | 533 | $15.00 | $2.63 | $5.20 | $5.50 | $7.00 |
| 109 | Geotextile (type III)(erosion control) (740-10.03) | SY | 1,668 | $3.80 | $3.37 | $3.52 | $5.50 | $5.00 |
| 110 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 571 | $16.00 | $3.68 | $6.00 | $5.50 | $9.00 |
| 111 | Temporary sediment tube 18IN (740-11.03) | LF | 457 | $4.60 | $4.32 | $4.50 | $4.10 | $4.20 |
| 112 | Seeding (with mulch) (801-01) | UNIT | 31 | $66.00 | $54.74 | $57.00 | $52.00 | $60.00 |
| 113 | Temporary seeding (with mulch) (801-01.07) | UNIT | 40 | $55.00 | $48.42 | $51.00 | $46.00 | $50.00 |
| 114 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 15 | $214.00 | $83.16 | $87.00 | $79.00 | $195.00 |
| 115 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 5 | $214.00 | $90.53 | $95.00 | $86.00 | $195.00 |
| 116 | Seeding (without mulch) (801-02) | UNIT | 1 | $99.00 | $46.32 | $50.00 | $44.00 | $90.00 |
| 117 | Water (seeding & sodding) (801-03) | MG | 17 | $110.00 | $168.42 | $176.00 | $160.00 | $17.00 |
| 118 | Acer negundo (box elder seedlng B.R.) (802-12.01) | EACH | 16 | $38.00 | $18.95 | $20.00 | $18.00 | $35.00 |
| 119 | Acer rubrum (red maple seedlng B.R.) (802-12.02) | EACH | 17 | $38.00 | $15.79 | $17.00 | $15.00 | $35.00 |
| 120 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 17 | $38.00 | $18.95 | $20.00 | $18.00 | $35.00 |
| 121 | Salix nigra (black willow 3FT live stakes) (802-16.01) | EACH | 100 | $16.50 | $16.84 | $18.00 | $16.00 | $15.00 |
| 122 | Sodding (new sod) (803-01) | SY | 286 | $11.00 | $6.42 | $7.00 | $6.10 | $10.00 |
| 123 | Project mowing (806-02.03) | CYCL | 4 | $550.00 | $315.79 | $8,800.00 | $5,000.00 | $3,500.00 |
| 124 | 32IN half size single slope conc barrier sloped end treatmnt (711-05.82) | LF | 75 | $367.00 | $283.52 | $465.00 | $225.00 | $400.00 |
| 125 | Light standards (light pole material only,14' M.H. post top fixture) (714-08.11) | EACH | 10 | $6,493.00 | $6,206.32 | $7,600.00 | $5,896.00 | $6,820.00 |
| 126 | Foundation (only) for light standards (714-08.24) | EACH | 10 | $1,982.00 | $1,894.74 | $250.00 | $1,800.00 | $225.00 |
| 127 | Removal of asbestos (utility piping) (202-01.05) | LS | 1 | $67,354 | $7,142.86 | $160,000 | $100,000 | $33,600 |
| 128 | Removal of structures (bridge no. 94-SR006-12.51) (202-04.01) | LS | 1 | $259,063 | $434,447 | $360,000 | $900,000 | $2,500,000 |
| 129 | Dry excavation (bridges) (204-02.01) | CY | 1,303 | $21.00 | $32.15 | $15.00 | $30.00 | $75.00 |
| 130 | Wet excavation (bridges) (204-03.01) | CY | 1,093 | $37.00 | $54.74 | $16.00 | $45.00 | $120.00 |
| 131 | Rock excavation (bridges) (204-04.01) | CY | 24 | $181.00 | $249.32 | $660.00 | $45.00 | $300.00 |
| 132 | Rock drilling (bridges) (204-05) | LF | 72 | $64.00 | $55.33 | $95.00 | $75.00 | $50.00 |
| 133 | Granular backfill (bridges) (303-01.02) | TON | 89 | $97.00 | $167.39 | $138.00 | $55.00 | $95.00 |
| 134 | Bracing repairs (602-10.05) | LS | 1 | $32,393 | $28,571 | $90,000 | $2,500.00 | $160,000 |
| 135 | Epoxy coated reinforcing steel (604-02.03) | LB | 186,022 | $2.50 | $1.64 | $1.84 | $2.00 | $2.90 |
| 136 | Class A concrete (bridges) (604-03.01) | CY | 430 | $2,996.00 | $2,460.41 | $1,900.00 | $1,600.00 | $2,500.00 |
| 137 | Steel bar reinforcement (bridges) (604-03.02) | LB | 105,571 | $1.70 | $2.41 | $1.50 | $1.65 | $2.20 |
| 138 | Pavement @ bridge ends (604-03.04) | SY | 259 | $534.00 | $655.92 | $410.00 | $425.00 | $500.00 |
| 139 | Class A concrete (sidewalk) (604-03.07) | CY | 118 | $498.00 | $1,238.97 | $460.00 | $575.00 | $700.00 |
| 140 | Class DS concrete (604-03.32) | CY | 460 | $1,136.00 | $1,366.15 | $1,320.00 | $1,600.00 | $2,000.00 |
| 141 | Applied texture finish (new structures) (604-04.01) | SY | 1,798 | $17.00 | $10.00 | $18.15 | $15.50 | $17.38 |
| 142 | Remove existing wearing surface (604-10.14) | LS | 1 | $25,851 | $78,571 | $50,000 | $50,000 | $15,000 |
| 143 | Steel piles (10 inch) (606-02.03) | LF | 923 | $125.00 | $100.98 | $95.00 | $70.00 | $150.00 |
| 144 | Pile tips (steel piles, 10 inch) (606-02.06) | EACH | 30 | $269.00 | $275.00 | $170.00 | $200.00 | $200.00 |
| 145 | Deck drains (grate inlet drain - type 2) (610-10.45) | EACH | 18 | $3,841.00 | $3,793.73 | $2,200.00 | $2,000.00 | $2,600.00 |
| 146 | Prestressed concrete box beam (33" X 36") (615-02.05) | LF | 1,908 | $471.00 | $543.47 | $490.00 | $475.00 | $950.00 |
| 147 | Bridge deck crack sealing (617-02) | LF | 321 | $4.00 | $5.00 | $21.00 | $7.00 | $6.00 |
| 148 | Sealant (HMWM) (617-05) | GAL | 2 | $489.00 | $30.00 | $2,100.00 | $400.00 | $500.00 |
| 149 | Concrete parapet (metal pedestrian handrail with concrete columns) (620-03.12) | LF | 590 | $453.00 | $531.57 | $415.00 | $550.00 | $500.00 |
| 150 | Temporary shoring (621-05.02) | LS | 1 | $49,675 | $142,857 | $60,000 | $750,000 | $424,000 |
| 151 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 142 | $120.00 | $57.14 | $29.00 | $12.00 | $90.00 |
| 152 | 6" pipe underdrain (710-09.02) | LF | 38 | $40.00 | $28.57 | $37.00 | $17.00 | $30.00 |
| 153 | Class A concrete (sidewalk) (604-03.07) | CY | 82 | $498.00 | $1,237.47 | $460.00 | $575.00 | $700.00 |
| 154 | Class DS concrete (604-03.32) | CY | 64 | $1,136.00 | $1,366.15 | $1,320.00 | $1,600.00 | $2,000.00 |
| 155 | Prestressed concrete box beam (33" X 36") (615-02.05) | LF | 545 | $471.00 | $542.12 | $490.00 | $475.00 | $950.00 |
| 156 | Concrete parapet (median traffic barrier) (620-03.11) | LF | 560 | $382.00 | $231.17 | $350.00 | $225.00 | $550.00 |
| 157 | Remove wire (790-98.01) | LF | 515 | $5.80 | $1.43 | $6.00 | $5.32 | $5.50 |
| 158 | Remove poles (790-98.02) | EACH | 2 | $976.00 | $1,428.57 | $1,535.00 | $886.66 | $1,380.00 |
| 159 | Remove framing/associated apparatus (790-98.03) | EACH | 14 | $390.00 | $142.86 | $612.00 | $354.66 | $550.00 |
| 160 | Pole 40FT class 4 wood (793-01.12) | EACH | 2 | $4,956.00 | $4,736.84 | $2,900.00 | $4,500.00 | $2,535.00 |
| 161 | Pole 55FT class 3 wood (793-01.25) | EACH | 1 | $8,150.00 | $7,789.47 | $4,200.00 | $7,400.00 | $3,715.00 |
| 162 | Anchor 1IN (793-01.41) | EACH | 2 | $1,321.00 | $1,263.16 | $1,325.00 | $1,200.00 | $1,190.00 |
| 163 | Composite handhole 5FTX3FTX3FT (793-11.17) | EACH | 1 | $7,930.00 | $7,578.95 | $11,500 | $7,200.00 | $10,350 |
| 164 | 4IN schedule 40 PVC (793-13.07) | LF | 1,868 | $19.00 | $18.95 | $5.50 | $18.00 | $4.80 |
| 165 | 1 duct formation @ 24IN depth (793-13.11) | LF | 44 | $77.00 | $73.68 | $36.00 | $70.00 | $32.50 |
| 166 | 4 duct formation @ 36IN depth (793-13.27) | LF | 176 | $121.00 | $115.79 | $81.00 | $110.00 | $72.50 |
| 167 | MH precast 6-FT W X 12-FT L X 7-FT H (793-14.03) | EACH | 1 | $47,140 | $45,053 | $38,000 | $42,800 | $33,450 |
| 168 | Bridge conduit hanger system (793-14.09) | LS | 1 | $105,999 | $101,305 | $85,000 | $96,240 | $75,700 |
| 169 | Place manhole over existing cable (793-14.20) | EACH | 1 | $2,423.00 | $2,315.79 | $11,000 | $2,200.00 | $9,885.00 |
| 170 | Remove poles all sizes (793-98.04) | EACH | 3 | $550.00 | $526.32 | $575.00 | $500.00 | $517.00 |
| 171 | 12IN dip restrained joint water line (795-01.09) | LF | 986 | $223.00 | $200.00 | $450.00 | $190.00 | $245.00 |
| 172 | Bore/jack 24IN steel casing pipe-uncon. (795-05.68) | LF | 15 | $2,037.00 | $1,947.37 | $2,025.00 | $1,850.00 | $1,500.00 |
| 173 | Connect to 12IN water line (795-06.07) | EACH | 2 | $7,864.00 | $7,515.79 | $1,480.00 | $7,140.00 | $8,000.00 |
| 174 | Cut and cap 12IN water line (795-06.37) | EACH | 2 | $6,002.00 | $5,736.84 | $1,530.00 | $5,450.00 | $14,500 |
| 175 | 12IN X 12IN tapping sleeve and valve (795-07.15) | EACH | 2 | $23,988 | $22,926 | $35,000 | $21,780 | $27,500 |
| 176 | 12IN gate valve assembly (795-08.09) | EACH | 2 | $8,679.00 | $8,294.74 | $7,710.00 | $7,880.00 | $6,000.00 |
| 177 | Retire in place existing water main (795-11.12) | LF | 466 | $31.00 | $29.89 | $79.00 | $28.40 | $30.00 |
| 178 | DI fittings (795-13.01) | LB | 1,320 | $22.00 | $21.35 | $40.00 | $20.28 | $8.00 |
| 179 | Bridge hanger system (795-13.04) | LS | 1 | $332,000 | $317,305 | $48,000 | $301,440 | $1,200,000 |
| 180 | 18IN HDPE force main (797-02.17) | LF | 1,096 | $276.00 | $244.21 | $151.00 | $232.00 | $320.00 |
| 181 | __in dip gravity sewer >18FT depth (797-05.32) | LF | 279 | $4,328.00 | $4,136.84 | $2,150.00 | $3,930.00 | $1,300.00 |
| 182 | __ in tunneling unclassified (797-06.98) | LS | 1 | $36,775 | $35,147 | $500,000 | $33,390 | $1,450,000 |
| 183 | 84IN manhole 24FT-28FT depth (797-07.43) | EACH | 1 | $57,889 | $55,326 | $36,000 | $52,560 | $45,000 |
| 184 | Remove sewer manhole (797-07.80) | EACH | 1 | $8,381.00 | $8,010.53 | $12,000 | $7,610.00 | $20,000 |
| 185 | HDPE fittings (797-08.03) | LB | 450 | $52.21 | $50.65 | $2,250.00 | $48.12 | $10.00 |
| 186 | Connect >18IN sewer to exist. manhole (797-10.04) | EACH | 1 | $11,069 | $10,579 | $200,000 | $10,050 | $40,000 |
| 187 | Connect to 18IN force main (797-10.45) | EACH | 2 | $11,840 | $11,316 | $20,000 | $10,750 | $20,000 |
| 188 | Remove existing sewer >24IN (797-11.37) | LF | 272 | $103.00 | $98.79 | $229.00 | $93.85 | $300.00 |
| 189 | By-pass pumping (797-11.38) | LS | 1 | $579,000 | $567,949 | $500,000 | $539,552 | $225,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.