TDOT contract CN263055 bid tabulation

The grading, drainage, construction of concrete box beam bridges, retaining wall, and paving on u.s. 31 (s.r. 6, east main street) over the harpeth river (l.m. 12.51). Let by Tennessee DOT on June 26, 2026, Williamson County. 5 bids received; low bid $11,957,571 by Bell & Associates Construction, LLC.

Owner
Tennessee DOT
Letting
26 JUN 2026
Pay items
189
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Bell & Associates Construction, LLC$11,957,571Low
2Capital City Construction Services, LLC$11,999,9080.0%
3MasTec Civil, LLC$12,211,920+2.0%
4Dement Construction Group, LLC$13,662,194+14%
5Jones Bros. Contractors, LLC$19,471,519+63%
TDOT contract CN263055: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bell & Associates Construction, LLC2. Capital City Construction Services, LLC3. MasTec Civil, LLC4. Dement Construction Group, LLC5. Jones Bros. Contractors, LLC
1Construction stakes, lines and grades (105-01)LS1$69,388$75,000$255,000$80,000$40,750
2CPM project schedule (108-03)LS1$39,898$45,000$20,000$75,000$36,225
3Clearing and grubbing (201-01)LS1$72,089$154,737$200,000$725,000$50,000
4Removal of pipe (18 inch) (202-02.21)LF69$88.00$84.21$100.00$45.00$100.00
5Removal of pipe (48 inch) (202-02.22)LF65$397.00$105.26$95.00$80.00$500.00
6Removal of rigid pavement, sidewalk, etc. (202-03)SY328$68.00$26.00$33.00$11.00$75.00
7Removal of rigid pavement (202-03.02)CY104$33.00$68.00$135.00$16.00$170.00
8Removal of structures (existing endwalls sta. 106+24.62) (202-04.02)LS1$897.00$857.89$5,000.00$2,500.00$7,500.00
9Removal of structures (existing endwalls sta. 106+29.79) (202-04.03)LS1$897.00$857.89$5,000.00$2,500.00$7,500.00
10Removal of structures (existing catch basins) (202-04.04)LS1$1,101.00$1,052.63$5,000.00$2,500.00$7,500.00
11Removal of structures (existing retaining walls) (202-04.05)LS1$8,924.00$2,631.58$5,000.00$25,000$9,000.00
12Removal of structures (existing endwalls sta. 103+64.27) (202-04.06)LS1$10,937$1,052.63$5,000.00$2,500.00$7,000.00
13Removal of curb and gutter (station 102+46.51 to 107+40.01) (202-08.15)LF388$24.00$14.74$31.00$8.00$20.00
14Road & drainage excavation (unclassified) (203-01)CY773$86.00$92.89$40.00$40.00$125.00
15Borrow excavation (unclassified) (203-03)CY1,059$53.00$102.30$29.00$35.00$55.00
16Placing and spreading topsoil (203-04)CY174$40.00$137.55$28.00$30.00$130.00
17Water (203-06)MG2$50.00$14.29$118.00$25.00$500.00
18Channel substrate (203-20.01)CY383$56.00$45.00$30.00$40.00$150.00
19Construction of haul road (203-50)LS1$406,827$325,000$150,000$875,000$900,000
20Sediment removal (209-05)CY28$30.00$106.85$57.00$10.00$70.00
21Temporary silt fence (with backing) (209-08.02)LF2,313$5.20$5.89$6.00$5.60$4.75
22Enhanced rock check dam (209-08.08)EACH5$826.00$747.37$781.00$710.00$4,000.00
23Sediment filter bag(15' X 10') (209-09.04)EACH3$4,630.00$436.84$500.00$415.00$1,300.00
24Curb inlet protection (type 4) (209-09.43)EACH15$242.00$168.42$176.00$160.00$220.00
25Polyethylene sheeting (6 mil. minimum) (209-20.03)SY1,226$3.86$4.29$5.00$5.00$6.00
26Catch basin protection (type D) (209-40.33)EACH3$495.00$142.11$150.00$135.00$450.00
27Catch basin filter assembly(type 7) (209-40.47)EACH3$1,652.00$1,284.21$1,345.00$1,220.00$1,500.00
28Temporary diversion channel (209-65.03)LF315$118.00$37.99$8.75$25.00$80.00
29Temporary in stream diversion (209-65.04)LF509$316.00$194.81$100.00$75.00$180.00
30Mineral aggregate, type A base, grading D (303-01)TON442$96.00$87.07$92.00$52.00$80.00
31Mineral aggregate (size 57) (303-10.01)TON975$101.00$80.99$65.00$55.00$90.00
32Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON56$451.00$654.58$451.00$410.00$550.00
33Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON37$710.00$968.98$709.00$645.00$750.00
34Bituminous material for prime coat (PC) (402-01)TON3$1,938.00$5,058.73$1,936.00$1,760.00$1,075.00
35Aggregate for cover material (PC) (402-02)TON2$269.00$2,514.40$270.00$245.00$50.00
36Bituminous material for tack coat (TC) (403-01)TON1$1,431.00$1,367.48$1,430.00$1,300.00$950.00
37Saw cutting asphalt pavement (407-20.05)LF179$4.40$21.05$8.00$7.00$25.00
38Acs mix(PG70-22) grading D (411-02.10)TON125$297.00$626.19$297.00$270.00$440.00
39Cold planing bituminous pavement (415-01.01)TON102$154.00$213.79$154.00$140.00$275.00
40Retaining wall (R1, S.R. 6 sta. 103+52.45 - sta. 103+54.04) (604-07.01)SF10$1,340.00$142.86$586.00$2,750.00$2,500.00
4118" concrete pipe culvert (class III) (607-03.02)LF45$484.00$463.16$232.00$150.00$200.00
4248" concrete pipe culvert (class III) (607-09.02)LF69$1,371.00$1,310.53$365.00$325.00$400.00
43Class A concrete (pipe endwalls) (611-07.01)CY8$3,458.00$3,305.26$2,700.00$1,750.00$3,600.00
44Steel bar reinforcement (pipe endwalls) (611-07.02)LB273$11.00$10.53$1.10$5.75$8.00
45Adjustment of existing catchbasin (611-09.01)EACH1$3,535.00$3,378.95$1,950.00$5,000.00$4,000.00
46Catchbasin retrofit (611-09.04)EACH1$7,621.00$7,284.21$730.00$8,500.00$4,500.00
47Catch basin, 96IN round,> 4FT-8FT depth (611-60.40)EACH2$20,426$19,522$14,000$25,000$25,000
48Temporary shoring (621-05.03)LS1$53,563$56,968$11,000$350,000$200,000
49Concrete sidewalk (4 ") (701-01.01)SF1,459$9.00$10.53$9.00$8.25$8.25
50Concrete combined curb & gutter (702-03)CY17$647.00$842.11$647.00$588.00$588.00
51W beam GR (type 2) MASH TL-3 (705-06.01)LF69$38.00$36.84$39.00$33.80$35.00
52Thrie beam bridge transition MASH TL-3 (705-06.25)EACH1$3,083.00$2,947.37$3,100.00$2,300.00$2,800.00
53GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH1$3,524.00$3,368.42$3,520.00$3,145.00$3,200.00
54Removal of fence (wood fence) (707-06.01)LF433$5.50$14.29$6.00$5.00$5.00
55Removal and reset fence (sta. 103+34.16 - 103+49.94) (707-06.03)LF66$94.00$85.71$33.00$35.00$150.00
56Fence (wood) (707-08.01)LF433$49.00$62.11$31.00$45.00$45.00
57High-visibility construction fence (707-08.11)LF708$4.30$2.84$3.30$2.70$3.90
58Pedestrian construction barrier fence (707-11.01)LF123$30.80$40.00$50.00$28.00$28.00
59Machined rip-rap (class A-3) (709-05.05)TON150$47.00$78.95$94.00$50.00$80.00
60Machined rip-rap (class A-1) (709-05.06)TON846$69.00$84.21$83.00$50.00$80.00
61Machined rip-rap (class B) (709-05.08)TON2,505$61.00$78.95$83.00$60.00$85.00
62Machined rip-rap (class C) (709-05.09)TON190$82.00$131.58$93.00$60.00$90.00
63Traffic control (712-01)LS1$126,512$24,737$90,000$100,000$365,000
64Portable barrier rail (MASH TL-3) (712-02.10)LF652$24.00$63.16$93.00$35.00$91.21
65Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12)LF324$149.00$94.74$93.00$100.00$235.31
66Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH4$6,481.00$7,894.74$6,500.00$5,885.00$10,000
67Flexible drums (channelizing) (712-04.01)EACH78$31.00$48.42$32.00$29.00$46.00
68Barrier rail delineator (712-04.50)EACH33$16.00$10.53$16.50$15.00$10.00
69Warning lights (type A) (712-05.01)EACH23$22.00$26.32$22.00$20.00$25.00
70Signs (construction) (712-06)SF634$7.50$7.89$8.00$6.85$7.50
71Temporary barricades (type II) (712-07.02)LF40$24.00$25.26$24.00$22.00$24.00
72Temporary barricades (type III) (712-07.03)LF40$27.00$21.05$28.00$25.00$20.00
73Square tube sign support (713-11.05)LB268$16.00$15.79$8.80$15.00$15.00
74Flat sheet aluminum signs (0.100" thick) (713-13.03)SF48$22.00$21.05$18.00$20.00$20.00
75Removal of signs, posts and footings (713-15)LS1$275.00$263.16$3,300.00$250.00$250.00
76Changeable message sign unit (713-16.01)EACH4$6,553.00$10,000$6,545.00$5,950.00$9,500.00
77Encased conduit (2" PVC, schedule 80) (714-02.01)LF585$24.00$23.16$13.00$22.00$12.00
78Direct burial conduit (2" PVC, schedule 40) (714-03.01)LF100$24.00$23.16$27.00$22.00$24.00
79Pull boxes (type C) (714-05.04)EACH2$1,321.00$1,263.16$2,185.00$1,200.00$2.00
80Cable (1/C # 8 AWG) (714-06.04)LF1,370$2.75$2.63$3.40$2.50$3.00
81Cable (1/C # 2 AWG) (714-06.07)LF2,055$4.50$4.32$7.80$4.10$6.90
82Cable (#8 copper soft drawn bare) (714-06.08)LF685$2.75$2.63$3.00$2.50$2.50
83Cable (#2 copper soft drawn bare) (714-06.09)LF685$4.50$4.32$6.50$4.10$5.70
84Removal of light standard (714-08.34)EACH3$1,101.00$1,052.63$510.00$1,000.00$456.00
85Modify exist control center(no. 1) (714-12.11)EACH1$2,907.00$2,778.95$4,000.00$2,640.00$3,565.00
86Electrical connection (to control center no. 1) (714-25.01)LS1$11,718$11,200$4,500.00$10,640$3,995.00
87Plastic pavement marking(channelization striping) (716-02.04)SY44$55.00$52.63$40.00$50.00$40.00
88Plastic pavement marking (stop line) (716-02.05)LF49$27.00$26.32$20.00$25.00$30.00
89Plastic pavement marking (turn lane arrow) (716-02.06)EACH5$275.00$263.16$186.00$250.00$300.00
90Plastic word pavement marking (only) (716-03.01)EACH4$495.00$473.68$462.00$450.00$650.00
91Plastic pavement marking (straight-turn arrow) (716-04.01)EACH1$385.00$368.42$339.00$350.00$550.00
92Painted pavement markings(8" line) (716-05.49)LM1.90$2,753.00$2,631.58$1,693.00$2,500.00$2,600.00
93Removal of pavement marking (line) (716-08.01)LF14,090$1.35$1.32$1.13$1.25$1.00
94Removal of pavement marking (channelization striping) (716-08.04)SY88$30.00$29.47$10.15$28.00$15.00
95Removal of pavement marking (stop line) (716-08.05)LF52$11.00$10.53$8.00$10.00$15.00
96Removal of pavement marking (turn lane arrow) (716-08.06)EACH4$110.00$105.26$74.00$100.00$100.00
97Removal of word pavement marking (only) (716-08.11)EACH4$132.00$126.32$74.00$120.00$200.00
98Contrast pavement marking 6" (716-09.86)LM0.20$27,535$26,316$20,300$25,000$50,000
99Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM0.70$9,361.00$8,947.37$8,500.00$8,500.00$15,000
100Enhanced flat line thermo (8IN line) (716-12.06)LF491$2.20$2.11$2.25$2.00$4.00
101Mobilization (717-01)LS1$1,076,181$951,817$1,221,000$1,364,091$1,900,000
102Install pull box (fiber optic-type A) (730-03.23)EACH6$3,854.00$3,684.21$3,800.00$3,500.00$3,380.00
103Fiber optic cable (48F) (730-03.50)LF895$3.30$3.16$8.50$3.00$7.80
104Modify existing electrical service connection (730-05.04)EACH1$3,154.00$3,014.74$6,500.00$2,864.00$5,770.00
105Conduit 3" diameter (PVC schedule 40) (730-12.03)LF210$28.00$27.37$36.00$26.00$32.00
106Conduit 3" diameter (directional bore) (730-12.24)LF70$88.00$84.21$132.00$80.00$118.00
107Encased conduit 3" diameter (730-12.38)LF315$13.00$12.63$21.00$12.00$19.00
108Geogrid reinforcement type 2 (740-07.04)SY533$15.00$2.63$5.20$5.50$7.00
109Geotextile (type III)(erosion control) (740-10.03)SY1,668$3.80$3.37$3.52$5.50$5.00
110Geotextile (type IV)(stabilization) (740-10.04)SY571$16.00$3.68$6.00$5.50$9.00
111Temporary sediment tube 18IN (740-11.03)LF457$4.60$4.32$4.50$4.10$4.20
112Seeding (with mulch) (801-01)UNIT31$66.00$54.74$57.00$52.00$60.00
113Temporary seeding (with mulch) (801-01.07)UNIT40$55.00$48.42$51.00$46.00$50.00
114Grass seed mix (ripzn/FLPL) W/mulch (801-01.35)UNIT15$214.00$83.16$87.00$79.00$195.00
115Natve seed MX final stablizatn of slopes (801-01.38)UNIT5$214.00$90.53$95.00$86.00$195.00
116Seeding (without mulch) (801-02)UNIT1$99.00$46.32$50.00$44.00$90.00
117Water (seeding & sodding) (801-03)MG17$110.00$168.42$176.00$160.00$17.00
118Acer negundo (box elder seedlng B.R.) (802-12.01)EACH16$38.00$18.95$20.00$18.00$35.00
119Acer rubrum (red maple seedlng B.R.) (802-12.02)EACH17$38.00$15.79$17.00$15.00$35.00
120Platanus occidentalis (sycamore seedlng B.R.) (802-12.26)EACH17$38.00$18.95$20.00$18.00$35.00
121Salix nigra (black willow 3FT live stakes) (802-16.01)EACH100$16.50$16.84$18.00$16.00$15.00
122Sodding (new sod) (803-01)SY286$11.00$6.42$7.00$6.10$10.00
123Project mowing (806-02.03)CYCL4$550.00$315.79$8,800.00$5,000.00$3,500.00
12432IN half size single slope conc barrier sloped end treatmnt (711-05.82)LF75$367.00$283.52$465.00$225.00$400.00
125Light standards (light pole material only,14' M.H. post top fixture) (714-08.11)EACH10$6,493.00$6,206.32$7,600.00$5,896.00$6,820.00
126Foundation (only) for light standards (714-08.24)EACH10$1,982.00$1,894.74$250.00$1,800.00$225.00
127Removal of asbestos (utility piping) (202-01.05)LS1$67,354$7,142.86$160,000$100,000$33,600
128Removal of structures (bridge no. 94-SR006-12.51) (202-04.01)LS1$259,063$434,447$360,000$900,000$2,500,000
129Dry excavation (bridges) (204-02.01)CY1,303$21.00$32.15$15.00$30.00$75.00
130Wet excavation (bridges) (204-03.01)CY1,093$37.00$54.74$16.00$45.00$120.00
131Rock excavation (bridges) (204-04.01)CY24$181.00$249.32$660.00$45.00$300.00
132Rock drilling (bridges) (204-05)LF72$64.00$55.33$95.00$75.00$50.00
133Granular backfill (bridges) (303-01.02)TON89$97.00$167.39$138.00$55.00$95.00
134Bracing repairs (602-10.05)LS1$32,393$28,571$90,000$2,500.00$160,000
135Epoxy coated reinforcing steel (604-02.03)LB186,022$2.50$1.64$1.84$2.00$2.90
136Class A concrete (bridges) (604-03.01)CY430$2,996.00$2,460.41$1,900.00$1,600.00$2,500.00
137Steel bar reinforcement (bridges) (604-03.02)LB105,571$1.70$2.41$1.50$1.65$2.20
138Pavement @ bridge ends (604-03.04)SY259$534.00$655.92$410.00$425.00$500.00
139Class A concrete (sidewalk) (604-03.07)CY118$498.00$1,238.97$460.00$575.00$700.00
140Class DS concrete (604-03.32)CY460$1,136.00$1,366.15$1,320.00$1,600.00$2,000.00
141Applied texture finish (new structures) (604-04.01)SY1,798$17.00$10.00$18.15$15.50$17.38
142Remove existing wearing surface (604-10.14)LS1$25,851$78,571$50,000$50,000$15,000
143Steel piles (10 inch) (606-02.03)LF923$125.00$100.98$95.00$70.00$150.00
144Pile tips (steel piles, 10 inch) (606-02.06)EACH30$269.00$275.00$170.00$200.00$200.00
145Deck drains (grate inlet drain - type 2) (610-10.45)EACH18$3,841.00$3,793.73$2,200.00$2,000.00$2,600.00
146Prestressed concrete box beam (33" X 36") (615-02.05)LF1,908$471.00$543.47$490.00$475.00$950.00
147Bridge deck crack sealing (617-02)LF321$4.00$5.00$21.00$7.00$6.00
148Sealant (HMWM) (617-05)GAL2$489.00$30.00$2,100.00$400.00$500.00
149Concrete parapet (metal pedestrian handrail with concrete columns) (620-03.12)LF590$453.00$531.57$415.00$550.00$500.00
150Temporary shoring (621-05.02)LS1$49,675$142,857$60,000$750,000$424,000
1516" perforated pipe with vertical drain system (710-09.01)LF142$120.00$57.14$29.00$12.00$90.00
1526" pipe underdrain (710-09.02)LF38$40.00$28.57$37.00$17.00$30.00
153Class A concrete (sidewalk) (604-03.07)CY82$498.00$1,237.47$460.00$575.00$700.00
154Class DS concrete (604-03.32)CY64$1,136.00$1,366.15$1,320.00$1,600.00$2,000.00
155Prestressed concrete box beam (33" X 36") (615-02.05)LF545$471.00$542.12$490.00$475.00$950.00
156Concrete parapet (median traffic barrier) (620-03.11)LF560$382.00$231.17$350.00$225.00$550.00
157Remove wire (790-98.01)LF515$5.80$1.43$6.00$5.32$5.50
158Remove poles (790-98.02)EACH2$976.00$1,428.57$1,535.00$886.66$1,380.00
159Remove framing/associated apparatus (790-98.03)EACH14$390.00$142.86$612.00$354.66$550.00
160Pole 40FT class 4 wood (793-01.12)EACH2$4,956.00$4,736.84$2,900.00$4,500.00$2,535.00
161Pole 55FT class 3 wood (793-01.25)EACH1$8,150.00$7,789.47$4,200.00$7,400.00$3,715.00
162Anchor 1IN (793-01.41)EACH2$1,321.00$1,263.16$1,325.00$1,200.00$1,190.00
163Composite handhole 5FTX3FTX3FT (793-11.17)EACH1$7,930.00$7,578.95$11,500$7,200.00$10,350
1644IN schedule 40 PVC (793-13.07)LF1,868$19.00$18.95$5.50$18.00$4.80
1651 duct formation @ 24IN depth (793-13.11)LF44$77.00$73.68$36.00$70.00$32.50
1664 duct formation @ 36IN depth (793-13.27)LF176$121.00$115.79$81.00$110.00$72.50
167MH precast 6-FT W X 12-FT L X 7-FT H (793-14.03)EACH1$47,140$45,053$38,000$42,800$33,450
168Bridge conduit hanger system (793-14.09)LS1$105,999$101,305$85,000$96,240$75,700
169Place manhole over existing cable (793-14.20)EACH1$2,423.00$2,315.79$11,000$2,200.00$9,885.00
170Remove poles all sizes (793-98.04)EACH3$550.00$526.32$575.00$500.00$517.00
17112IN dip restrained joint water line (795-01.09)LF986$223.00$200.00$450.00$190.00$245.00
172Bore/jack 24IN steel casing pipe-uncon. (795-05.68)LF15$2,037.00$1,947.37$2,025.00$1,850.00$1,500.00
173Connect to 12IN water line (795-06.07)EACH2$7,864.00$7,515.79$1,480.00$7,140.00$8,000.00
174Cut and cap 12IN water line (795-06.37)EACH2$6,002.00$5,736.84$1,530.00$5,450.00$14,500
17512IN X 12IN tapping sleeve and valve (795-07.15)EACH2$23,988$22,926$35,000$21,780$27,500
17612IN gate valve assembly (795-08.09)EACH2$8,679.00$8,294.74$7,710.00$7,880.00$6,000.00
177Retire in place existing water main (795-11.12)LF466$31.00$29.89$79.00$28.40$30.00
178DI fittings (795-13.01)LB1,320$22.00$21.35$40.00$20.28$8.00
179Bridge hanger system (795-13.04)LS1$332,000$317,305$48,000$301,440$1,200,000
18018IN HDPE force main (797-02.17)LF1,096$276.00$244.21$151.00$232.00$320.00
181__in dip gravity sewer >18FT depth (797-05.32)LF279$4,328.00$4,136.84$2,150.00$3,930.00$1,300.00
182__ in tunneling unclassified (797-06.98)LS1$36,775$35,147$500,000$33,390$1,450,000
18384IN manhole 24FT-28FT depth (797-07.43)EACH1$57,889$55,326$36,000$52,560$45,000
184Remove sewer manhole (797-07.80)EACH1$8,381.00$8,010.53$12,000$7,610.00$20,000
185HDPE fittings (797-08.03)LB450$52.21$50.65$2,250.00$48.12$10.00
186Connect >18IN sewer to exist. manhole (797-10.04)EACH1$11,069$10,579$200,000$10,050$40,000
187Connect to 18IN force main (797-10.45)EACH2$11,840$11,316$20,000$10,750$20,000
188Remove existing sewer >24IN (797-11.37)LF272$103.00$98.79$229.00$93.85$300.00
189By-pass pumping (797-11.38)LS1$579,000$567,949$500,000$539,552$225,000
TDOT contract CN263055: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy