TDOT contract CNZ274 bid tabulation
The bridge repairs on the i-40 exit 221 ramp over i-40 (l.m. 29.02) and on s.r. 45 (old hickory boulevard) over i-40 (l.m. 17.92) in hermitage, as well as the elm hill pike bridge over i-40 (l.m. 1.25). Let by Tennessee DOT on October 3, 2025, Davidson County. 2 bids received; low bid $3,483,630 by Capital City Construction Services, LLC.
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 76
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Capital City Construction Services, LLC | $3,483,630 | Low |
| 2 | Bell & Associates Construction, LLC | $3,797,649 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Capital City Construction Services, LLC | 2. Bell & Associates Construction, LLC |
|---|---|---|---|---|---|
| 1 | Vegetation removal (201-05.31) | LS | 1 | $36,885 | $24,400 |
| 2 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 97 | $217.05 | $100.00 |
| 3 | Removal of asphalt pavement (202-03.01) | SY | 123 | $234.59 | $300.00 |
| 4 | Removal of structures (pavement at bridge ends) (202-04.01) | LS | 1 | $160,600 | $342,000 |
| 5 | Removal of curb and gutter (old hickory BLVD) (202-08.15) | LF | 176 | $48.73 | $50.00 |
| 6 | Filter sock (8 inch) (209-03.20) | LF | 180 | $11.76 | $3.00 |
| 7 | Sediment removal (209-05) | CY | 4 | $40.00 | $25.00 |
| 8 | Mineral aggregate, type A base, grading D (303-01) | TON | 225 | $114.94 | $100.00 |
| 9 | Mineral aggregate (size to BE determined by contractor) (303-10.04) | TON | 1,768 | $119.47 | $150.00 |
| 10 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 100 | $535.14 | $340.00 |
| 11 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 71 | $590.34 | $350.00 |
| 12 | Bituminous material for prime coat (PC) (402-01) | TON | 0.40 | $5,882.35 | $2,000.00 |
| 13 | Bituminous material for tack coat (TC) (403-01) | TON | 0.70 | $5,882.35 | $2,000.00 |
| 14 | Saw cutting asphalt pavement (407-20.05) | LF | 282 | $12.94 | $13.50 |
| 15 | Acs mix(PG70-22) grading D (411-02.10) | TON | 55 | $352.94 | $350.00 |
| 16 | Cold planing bituminous pavement (415-01.02) | SY | 559 | $29.41 | $60.00 |
| 17 | Structural steel (repairs) (602-10.32) | LB | 7,473 | $48.21 | $45.00 |
| 18 | Structural steel repair(description) (602-10.51) | EACH | 3 | $39,508 | $12,500 |
| 19 | Structural steel repair(description) (602-10.52) | EACH | 1 | $1,915.40 | $2,500.00 |
| 20 | Structural steel repair(description) (602-10.53) | EACH | 1 | $10,457 | $12,875 |
| 21 | Heat straightening (602-10.81) | LS | 1 | $176,471 | $200,000 |
| 22 | Repainting existing steel structures (bridge no. 19-04167-1.25) (603-02.01) | LS | 1 | $128,524 | $59,000 |
| 23 | Spot painting existing steel structures (603-02.20) | SF | 35 | $296.49 | $150.00 |
| 24 | Epoxy coated reinforcing steel (604-02.03) | LB | 1,114 | $2.82 | $2.00 |
| 25 | Class A concrete (bridges) (604-03.01) | CY | 10 | $1,255.40 | $2,600.00 |
| 26 | Pavement @ bridge ends (604-03.04) | SY | 458 | $406.55 | $1,000.00 |
| 27 | Bridge end drains(4'X8') (604-04.04) | EACH | 2 | $9,177.00 | $7,500.00 |
| 28 | Concrete (604-10.05) | SF | 310 | $417.42 | $200.00 |
| 29 | Remove existing wearing surface (604-10.14) | LS | 1 | $10,177 | $10,000 |
| 30 | Bridge deck repairs (full depth of slab) (604-10.30) | SY | 15 | $3,580.00 | $1,500.00 |
| 31 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 30 | $1,790.00 | $750.00 |
| 32 | Concrete repairs (604-10.54) | SF | 310 | $417.42 | $200.00 |
| 33 | Epoxy injection (injection) (604-10.58) | GAL | 1 | $1,089.00 | $115.00 |
| 34 | Epoxy injection repair (complete and in place) (604-10.62) | LF | 6 | $929.50 | $925.00 |
| 35 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 2,704 | $76.47 | $42.00 |
| 36 | Concrete sidewalk (4 ") (701-01.01) | SF | 1,056 | $23.78 | $45.00 |
| 37 | Concrete combined curb & gutter (702-03) | CY | 14 | $1,793.43 | $2,500.00 |
| 38 | Guardrail adjustment (706-05) | LF | 191 | $65.73 | $85.00 |
| 39 | Traffic control (712-01) | LS | 1 | $200,654 | $175,000 |
| 40 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 2,144 | $70.00 | $100.00 |
| 41 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 1,391 | $70.00 | $100.00 |
| 42 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $8,250.00 | $5,700.00 |
| 43 | Flexible drums (channelizing) (712-04.01) | EACH | 642 | $35.29 | $34.00 |
| 44 | Barrier rail delineator (712-04.50) | EACH | 145 | $8.24 | $8.00 |
| 45 | Warning lights (type A) (712-05.01) | EACH | 8 | $17.65 | $17.00 |
| 46 | Warning lights (type C) (712-05.03) | EACH | 114 | $17.65 | $17.00 |
| 47 | Signs (construction) (712-06) | SF | 3,249 | $8.24 | $8.00 |
| 48 | Temporary barricades (type II) (712-07.02) | LF | 72 | $18.24 | $17.00 |
| 49 | Temporary barricades (type III) (712-07.03) | LF | 176 | $19.71 | $19.00 |
| 50 | Arrow board (type C) (712-08.03) | EACH | 23 | $1,294.12 | $1,250.00 |
| 51 | Digital speed limit sign assembly (712-08.09) | EACH | 4 | $5,000.00 | $4,500.00 |
| 52 | Queue protection truck (712-08.12) | DAY | 72 | $1,352.94 | $1,288.00 |
| 53 | Changeable message sign unit (713-16.01) | EACH | 14 | $5,852.94 | $4,975.00 |
| 54 | Changeable message sign unit (slow traffic on I-40) (713-16.04) | EACH | 8 | $5,852.94 | $4,975.00 |
| 55 | Plastic pavement marking (cross-walk) (716-02.03) | LF | 109 | $23.53 | $23.00 |
| 56 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 39 | $41.18 | $57.00 |
| 57 | Plastic pavement marking (stop line) (716-02.05) | LF | 70 | $35.29 | $28.00 |
| 58 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 6 | $288.24 | $200.00 |
| 59 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 508 | $35.29 | $17.00 |
| 60 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 166 | $47.06 | $50.00 |
| 61 | Plastic word pavement marking (only) (716-03.01) | EACH | 6 | $470.59 | $500.00 |
| 62 | Plastic pavement marking (yield line) (716-04.12) | SF | 15 | $35.29 | $50.00 |
| 63 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 31,064 | $1.00 | $0.35 |
| 64 | Painted pavement marking (stop line) (716-05.05) | LF | 142 | $20.59 | $15.00 |
| 65 | Painted pavement marking (6" line) (716-05.20) | LM | 1.80 | $1,764.71 | $4,500.00 |
| 66 | Contrast pavement marking 6" (716-09.86) | LM | 0.50 | $52,941 | $30,000 |
| 67 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.20 | $14,706 | $4,800.00 |
| 68 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 215 | $3.53 | $3.00 |
| 69 | Mobilization (717-01) | LS | 1 | $175,000 | $375,000 |
| 70 | Roadway sweeping (719-01.02) | LM | 0.08 | $78,463 | $5,000.00 |
| 71 | Clean drain (719-01.08) | EACH | 44 | $285.32 | $50.00 |
| 72 | Geogrid reinforcement type 2 (740-07.04) | SY | 2,764 | $8.00 | $35.00 |
| 73 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 790 | $8.00 | $15.00 |
| 74 | Temporary sediment tube 18IN (740-11.03) | LF | 373 | $8.82 | $5.00 |
| 75 | Temporary sediment tube 20IN (740-11.04) | LF | 568 | $11.76 | $5.00 |
| 76 | Seeding (with mulch) (801-01) | UNIT | 10 | $117.65 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.