The resurfacing on s.r. 254 (old hickory boulevard) from cloverland drive (l.m. 8.24) to blue hole road (l.m. 13.97). Let by Tennessee DOT on May 9, 2025, Davidson County. 4 bids received; low bid $6,312,329 by Volunteer Paving, LLC.

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
34
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Volunteer Paving, LLC$6,312,329Low
2Vulcan Construction Materials, LLC$6,730,613+7.0%
3Wiregrass Construction Company, Inc$7,432,600+18%
4Jones Bros. Contractors, LLC$7,695,714+22%
TDOT contract CNZ158: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Volunteer Paving, LLC2. Vulcan Construction Materials, LLC3. Wiregrass Construction Company, Inc4. Jones Bros. Contractors, LLC
1Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON23,259$111.90$110.00$121.50$125.00
2Asphalt conc mix (PG76-22)(BPMB-HM) GR CS (307-03.10)TON500$172.35$130.00$165.00$125.00
3Bituminous material for tack coat (TC) (403-01)TON193$996.03$900.00$743.39$815.00
4Acs mix(PG70-22) grading D (411-02.10)TON14,536$119.55$125.00$144.00$140.50
5Cold planing bituminous pavement (415-01.01)TON37,439$12.25$27.00$30.00$27.00
6Adjustment of existing manhole (611-01.20)EACH6$237.83$825.00$826.08$825.00
7Adjustment of existing catchbasin (611-09.01)EACH8$422.80$825.00$826.07$825.00
8Concrete sidewalk (4 ") (701-01.01)SF1,850$31.71$17.50$10.56$17.50
9Concrete curb ramp (retrofit) (701-02.01)SF4,792$47.57$32.50$27.29$32.50
10Detectable warning surface (rehabilitation) (701-02.06)SF60$52.85$40.00$51.72$40.00
11Traffic control (712-01)LS1$153,265$125,000$208,724$350,000
12Flexible drums (channelizing) (712-04.01)EACH156$31.71$33.00$30.04$32.00
13Warning lights (type C) (712-05.03)EACH28$22.20$5.00$21.03$1.00
14Signs (construction) (712-06)SF2,211$6.87$9.25$6.51$7.35
15Arrow board (type C) (712-08.03)EACH2$1,094.00$850.00$1,036.35$1,350.00
16Relocate sign (713-16.41)LS1$158.55$350.00$150.20$100.00
17Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH833$45.00$35.00$35.05$35.00
18Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH641$45.00$35.00$35.05$34.00
19Plastic pavement marking (cross-walk) (716-02.03)LF75$20.00$15.00$15.02$30.00
20Plastic pavement marking(channelization striping) (716-02.04)SY49$35.00$40.00$40.05$35.00
21Plastic pavement marking (stop line) (716-02.05)LF4,148$25.00$20.00$20.03$20.00
22Plastic pavement marking (turn lane arrow) (716-02.06)EACH94$225.00$200.00$200.26$200.00
23Plastic pavement marking (8" dotted line) (716-02.08)LF1,248$4.00$4.00$4.01$2.50
24Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF4,101$35.00$40.00$40.05$35.00
25Plastic pavement marking (8IN line) (716-02.12)LM1.20$10,000$12,000$12,016$9,500.00
26Plastic word pavement marking (only) (716-03.01)EACH5$400.00$450.00$450.59$400.00
27Plastic pavement marking (straight-turn arrow) (716-04.01)EACH4$400.00$300.00$300.39$350.00
28Plastic pavement marking (straight arrow) (716-04.05)EACH2$250.00$200.00$200.26$200.00
29Painted pavement marking (6" line) (716-05.20)LM49.40$1,200.00$1,000.00$1,001.30$1,300.00
30Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM24.70$7,000.00$8,000.00$8,010.42$7,500.00
31Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF624$2.50$2.00$2.00$2.00
32Mobilization (717-01)LS1$96,976$65,000$105,830$300,000
33Saw slot (730-14.02)LF12,500$4.23$5.00$4.01$4.00
34Loop wire (730-14.03)LF25,000$0.85$1.25$0.80$0.80
TDOT contract CNZ158: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy