TDOT contract CNZ317 bid tabulation

The resurfacing on i-840 from the rutherford county line (l.m. 0.00) to near stewarts ferry pike (l.m. 4.80). Let by Tennessee DOT on December 5, 2025, Wilson County. 3 bids received; low bid $5,682,854 by Wiregrass Construction Company, Inc.

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
40
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wiregrass Construction Company, Inc$5,682,854Low
2Vulcan Construction Materials, LLC$5,856,700+3.0%
3Jones Bros. Contractors, LLC$6,913,146+22%
TDOT contract CNZ317: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wiregrass Construction Company, Inc2. Vulcan Construction Materials, LLC3. Jones Bros. Contractors, LLC
1Brooming & degrassing shoulders (208-01.05)LM19.20$1,925.00$1,750.00$1,680.00
2Mineral aggregate, type A base, grading D (303-01)TON2,586$46.00$40.00$50.00
3Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08)TON904$115.00$145.00$150.00
4Asphalt concrete mix (PG76-22) grading CM (307-03.12)TON18,587$90.00$95.00$115.00
5Bituminous material for tack coat (TC) (403-01)TON109$860.00$1,000.00$850.00
6Acs mix(PG76-22) grading D (411-03.10)TON1,758$185.00$148.00$250.00
7Acs mix (PG76-22) ogfc (411-03.23)TON11,948$151.00$149.50$180.00
8Scoring shoulders (continuous) (16IN width) (411-12.01)LM16.90$640.82$640.00$1,300.00
9Cold planing bituminous pavement (415-01.01)TON20,385$16.62$23.00$28.00
10Sealing random cracks (silicone sealant) (502-08.07)LF4,000$6.51$4.41$10.00
11Traffic control (712-01)LS1$110,000$130,000$125,000
12Flexible drums (channelizing) (712-04.01)EACH416$30.04$36.00$30.00
13Warning lights (type A) (712-05.01)EACH8$10.01$15.00$10.00
14Warning lights (type C) (712-05.03)EACH58$10.01$15.00$10.00
15Signs (construction) (712-06)SF1,918$7.01$7.00$7.00
16Signs (construction)(reduced speed warning) (712-06.16)EACH4$300.38$550.00$300.00
17Temporary barricades (type III) (712-07.03)LF48$15.02$26.00$15.00
18Arrow board (type C) (712-08.03)EACH4$1,101.41$950.00$1,100.00
19Speed feedback sign assembly (712-08.08)EACH4$4,005.11$5,750.00$4,000.00
20Digital speed limit sign assembly (712-08.09)EACH14$4,005.11$5,500.00$4,000.00
21Queue protection truck (712-08.12)DAY120$1,151.47$1,150.00$1,150.00
22Removal of existing delineators (713-02.11)EACH100$10.01$11.00$12.00
23Flexible delineator (white) (713-02.14)EACH200$57.07$51.00$57.00
24Changeable message sign unit (713-16.01)EACH2$5,256.71$4,500.00$5,250.00
25Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH783$36.05$30.00$30.00
26Removal of snowplowable reflective marker (716-01.30)EACH783$18.02$12.00$12.00
27Plastic pavement marking (stop line) (716-02.05)LF180$20.03$25.00$25.00
28Plastic pavement marking (24" barrier line) (716-02.07)LF1,659$18.02$16.00$16.00
29Plastic pavement marking (6" dotted line) (716-02.11)LF8,392$1.50$3.00$3.00
30Painted pavement marking (8" barrier line) (716-05.02)LF11,202$1.25$0.75$0.75
31Painted pavement marking (6" line) (716-05.20)LM41.20$1,351.73$1,300.00$1,300.00
32Removal of pavement marking (stop line) (716-08.05)LF180$7.51$10.00$10.00
33Removal of pavement marking (line) (716-08.20)LM7.50$5,286.75$5,000.00$5,000.00
34Removal of pavement marking (24IN barrier line) (716-08.21)LF1,659$7.51$13.00$13.00
35Contrast pavement marking 6" (716-09.86)LM6.90$22,028$20,000$20,000
36Contrast pavement shadow marking 6" (716-09.97)LF320$2.50$10.00$10.00
37Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM20.60$7,509.59$7,200.00$7,200.00
38Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF5,601$2.00$4.00$4.00
39Mobilization (717-01)LS1$85,000$30,000$90,000
40Trackless tack coat (403-02.01)TON186$860.00$1,028.47$850.00
TDOT contract CNZ317: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy