TDOT contract CNZ297 bid tabulation
The resurfacing (either microsurface or thin mix overlay) on u.s. 64 (s.r. 15) from west college street (l.m. 9.32) to near five points road (l.m. 18.39). Let by Tennessee DOT on December 5, 2025, Giles County. 5 bids received; low bid $3,718,268 by Wiregrass Construction Company, Inc.
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 42
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc | $3,718,268 | Low |
| 2 | Asphalt Paving Systems, Inc. | $3,846,152 | +3.0% |
| 3 | Rogers Group, Inc. | $4,144,282 | +11% |
| 4 | Volunteer Paving, LLC | $4,394,047 | +18% |
| 5 | Intermountain Slurry Seal, Inc. | $4,905,402 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wiregrass Construction Company, Inc | 2. Asphalt Paving Systems, Inc. | 3. Rogers Group, Inc. | 4. Volunteer Paving, LLC | 5. Intermountain Slurry Seal, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 33.60 | $1,800.00 | $1,260.00 | $1,225.00 | $769.30 | $4,800.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 4,298 | $75.00 | $66.15 | $25.00 | $34.33 | $80.00 |
| 3 | Bituminous material (BSC) (405-01.01) | TON | 498 | $1,025.02 | $1,070.58 | $889.00 | $1,096.07 | $1,500.00 |
| 4 | Mineral aggregate (BSC) (405-01.02) | TON | 4,343 | $63.74 | $66.57 | $49.00 | $68.16 | $65.00 |
| 5 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 17 | $844.47 | $882.00 | $850.00 | $623.50 | $800.00 |
| 6 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 13.60 | $844.47 | $882.00 | $850.00 | $623.50 | $800.00 |
| 7 | Traffic control (712-01) | LS | 1 | $32,572 | $83,300 | $87,188 | $87,075 | $100,000 |
| 8 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $36.19 | $37.80 | $31.00 | $32.25 | $50.00 |
| 9 | Warning lights (type C) (712-05.03) | EACH | 25 | $1.01 | $1.05 | $11.00 | $10.75 | $50.00 |
| 10 | Signs (construction) (712-06) | SF | 856 | $7.24 | $7.56 | $7.25 | $7.53 | $10.00 |
| 11 | Arrow board (type C) (712-08.03) | EACH | 2 | $955.05 | $997.50 | $1,150.00 | $1,182.50 | $1,500.00 |
| 12 | Flexible delineator (white) (713-02.14) | EACH | 34 | $45.24 | $47.25 | $56.00 | $59.13 | $200.00 |
| 13 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 92 | $40.21 | $42.00 | $41.00 | $45.00 | $50.00 |
| 14 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 343 | $40.21 | $42.00 | $41.00 | $45.00 | $50.00 |
| 15 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 1,102 | $40.21 | $42.00 | $41.00 | $45.00 | $50.00 |
| 16 | Removal of snowplowable reflective marker (716-01.30) | EACH | 966 | $20.11 | $5.00 | $16.00 | $10.00 | $15.00 |
| 17 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 910 | $20.11 | $21.00 | $21.00 | $35.00 | $30.00 |
| 18 | Plastic pavement marking (stop line) (716-02.05) | LF | 581 | $25.13 | $26.25 | $26.00 | $25.00 | $12.00 |
| 19 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 36 | $251.33 | $262.50 | $251.00 | $225.00 | $200.00 |
| 20 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 2,854 | $4.02 | $4.20 | $4.50 | $4.00 | $4.00 |
| 21 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.40 | $10,053 | $10,500 | $10,100 | $10,000 | $10,000 |
| 22 | Plastic word pavement marking (only) (716-03.01) | EACH | 2 | $452.40 | $472.50 | $452.00 | $400.00 | $300.00 |
| 23 | Plastic pavement marking (yield line) (716-04.12) | SF | 90 | $40.21 | $42.00 | $41.00 | $30.00 | $20.00 |
| 24 | Painted pavement marking (6" line) (716-05.20) | LM | 76.60 | $1,809.57 | $1,890.00 | $1,805.00 | $1,000.00 | $1,500.00 |
| 25 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 728 | $20.11 | $21.00 | $21.00 | $20.00 | $15.00 |
| 26 | Removal of pavement marking (stop line) (716-08.05) | LF | 569 | $8.04 | $8.40 | $9.00 | $10.00 | $5.00 |
| 27 | Removal of pavement marking (dotted line) (716-08.09) | LF | 2,854 | $0.90 | $0.95 | $1.00 | $1.00 | $1.00 |
| 28 | Removal of pavement marking (yield line) (716-08.19) | SF | 60 | $3.02 | $3.15 | $3.10 | $20.00 | $2.00 |
| 29 | Removal of pavement marking (line) (716-08.20) | LM | 41.70 | $2,010.63 | $2,100.00 | $2,010.00 | $2,500.00 | $5,500.00 |
| 30 | Contrast pavement marking 6" (716-09.86) | LM | 2.40 | $20,106 | $21,000 | $20,100 | $35,000 | $50,000 |
| 31 | Contrast pavement shadow marking 6" (716-09.94) | LM | 0.60 | $20,106 | $21,000 | $20,100 | $35,000 | $28,000 |
| 32 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 38.30 | $8,042.54 | $8,400.00 | $8,050.00 | $7,000.00 | $7,000.00 |
| 33 | Mobilization (717-01) | LS | 1 | $125,000 | $77,450 | $74,143 | $132,743 | $360,000 |
| 34 | Saw slot (730-14.02) | LF | 1,570 | $5.03 | $6.30 | $6.00 | $5.38 | $5.00 |
| 35 | Loop wire (730-14.03) | LF | 3,940 | $1.11 | $1.05 | $1.50 | $1.18 | $1.25 |
| 36 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 57 | $1,445.17 | $853.36 | $1,700.00 | ||
| 37 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 580 | $940.03 | $1,894.10 | $1,000.00 | ||
| 38 | Aggregate for micro surfacing (414-03.02) | TON | 4,819 | $186.51 | $97.70 | $220.00 | ||
| 39 | Cold planing bituminous pavement (415-01.01) | TON | 869 | $65.40 | $102.90 | $225.00 | ||
| 40 | Bituminous material for tack coat (TC) (403-01) | TON | 133 | $837.00 | $1,011.98 | |||
| 41 | Acs mix(PG70-22) thin lift D asphalt (411-03.13) | TON | 17,022 | $125.00 | $127.79 | |||
| 42 | Cold planing bituminous pavement (415-01.01) | TON | 2,314 | $55.00 | $31.19 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.