TDOT contract CNZ304 bid tabulation
The resurfacing on i-24 from the davidson county line (l.m. 0.00) to the baker road underpass (l.m. 7.75), including bridge expansion joint repairs. Let by Tennessee DOT on December 5, 2025, Rutherford County. 3 bids received; low bid $9,924,138 by Wiregrass Construction Company, Inc.
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 55
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc | $9,924,138 | Low |
| 2 | Vulcan Construction Materials, LLC | $10,717,439 | +8.0% |
| 3 | Jones Bros. Contractors, LLC | $12,751,645 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wiregrass Construction Company, Inc | 2. Vulcan Construction Materials, LLC | 3. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 31 | $1,600.00 | $2,500.00 | $1,750.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 3,059 | $38.00 | $35.00 | $45.00 |
| 3 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 500 | $152.00 | $139.00 | $180.00 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 280 | $900.00 | $1,000.00 | $850.00 |
| 5 | Void reducing asphalt membrane (vram) half-width (411-01.51) | LF | 491,040 | $1.95 | $1.85 | $1.95 |
| 6 | Acs mix(PG76-22) grading D (411-03.10) | TON | 44,335 | $124.00 | $128.50 | $155.00 |
| 7 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 28.10 | $565.72 | $565.00 | $1,450.00 |
| 8 | Cold planing bituminous pavement (415-01.01) | TON | 61,437 | $14.50 | $24.00 | $30.60 |
| 9 | Full depth PCC pavement repair high early (502-03.25) | CY | 131 | $854.08 | $810.00 | $3,000.00 |
| 10 | Sawing concrete pavement (full depth) (502-04.01) | LF | 790 | $21.08 | $21.40 | $15.00 |
| 11 | Load transfer dowels (502-04.02) | EACH | 326 | $25.03 | $22.50 | $22.00 |
| 12 | Transverse tie-bars (502-04.03) | EACH | 92 | $17.52 | $18.00 | $22.00 |
| 13 | Spall repair (502-07) | SY | 12 | $815.82 | $120.00 | $1,500.00 |
| 14 | Resealing joints (silicone sealant) (502-08.02) | LF | 1,017 | $6.76 | $5.00 | $20.00 |
| 15 | Sealing random cracks (silicone sealant) (502-08.07) | LF | 1,476 | $6.76 | $6.50 | $15.00 |
| 16 | Traffic control (712-01) | LS | 1 | $175,000 | $255,000 | $225,000 |
| 17 | Flexible drums (channelizing) (712-04.01) | EACH | 448 | $31.04 | $53.00 | $31.00 |
| 18 | Warning lights (type C) (712-05.03) | EACH | 28 | $10.01 | $10.00 | $10.00 |
| 19 | Signs (construction) (712-06) | SF | 2,706 | $6.86 | $6.85 | $6.85 |
| 20 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 8 | $450.57 | $450.00 | $450.00 |
| 21 | Temporary barricades (type III) (712-07.03) | LF | 48 | $15.02 | $19.00 | $15.00 |
| 22 | Arrow board (type C) (712-08.03) | EACH | 4 | $1,101.39 | $1,000.00 | $1,100.00 |
| 23 | Speed feedback sign assembly (712-08.08) | EACH | 2 | $4,205.32 | $1,200.00 | $4,200.00 |
| 24 | Digital speed limit sign assembly (712-08.09) | EACH | 22 | $4,205.32 | $4,800.00 | $4,200.00 |
| 25 | Queue protection truck (712-08.12) | DAY | 120 | $1,151.46 | $1,200.00 | $1,150.00 |
| 26 | Flexible delineator (white) (713-02.14) | EACH | 413 | $55.07 | $45.00 | $55.00 |
| 27 | Flexible delineator (yellow) (713-02.15) | EACH | 147 | $55.07 | $45.00 | $55.00 |
| 28 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,306.71 | $2,100.00 | $5,300.00 |
| 29 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 4,878 | $38.05 | $38.00 | $38.00 |
| 30 | Removal of snowplowable reflective marker (716-01.30) | EACH | 4,703 | $10.01 | $10.00 | $10.00 |
| 31 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 620 | $25.03 | $25.00 | $25.00 |
| 32 | Plastic pavement marking (stop line) (716-02.05) | LF | 138 | $20.03 | $20.00 | $20.00 |
| 33 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 13 | $200.25 | $200.00 | $200.00 |
| 34 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 7,350 | $10.01 | $10.00 | $10.00 |
| 35 | Plastic pavement marking (12IN barrier line) (716-02.23) | LF | 1,052 | $5.01 | $5.00 | $5.00 |
| 36 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 10 | $200.25 | $200.00 | $200.00 |
| 37 | Plastic pavement marking (H.O.V. diamond) (716-04.09) | EACH | 62 | $200.25 | $200.00 | $200.00 |
| 38 | Plastic pavement marking (yield line) (716-04.12) | SF | 96 | $45.06 | $45.00 | $45.00 |
| 39 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 1,395 | $1.00 | $1.00 | $1.00 |
| 40 | Painted pavement marking (6" line) (716-05.20) | LM | 44 | $1,802.28 | $1,800.00 | $1,800.00 |
| 41 | Removal of pavement marking (line) (716-08.01) | LF | 21,026 | $1.00 | $1.00 | $1.00 |
| 42 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 620 | $20.03 | $20.00 | $20.00 |
| 43 | Removal of pavement marking (stop line) (716-08.05) | LF | 138 | $10.01 | $10.00 | $10.00 |
| 44 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 13 | $100.13 | $100.00 | $100.00 |
| 45 | Contrast pavement marking 6" (716-09.86) | LM | 3.60 | $20,025 | $20,000 | $20,000 |
| 46 | Contrast pavement marking 12" (716-09.89) | LF | 490 | $18.02 | $18.00 | $18.00 |
| 47 | Contrast pavement shadow marking 6" (716-09.94) | LM | 0.20 | $15,019 | $15,000 | $15,000 |
| 48 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 44 | $7,008.86 | $7,000.00 | $7,000.00 |
| 49 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 13,081 | $2.00 | $2.00 | $2.00 |
| 50 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 2,677 | $1.50 | $1.50 | $1.50 |
| 51 | Enhanced flat line thermo (12IN line) (716-12.09) | LF | 40,920 | $4.01 | $4.00 | $4.00 |
| 52 | Mobilization (717-01) | LS | 1 | $160,000 | $105,000 | $180,000 |
| 53 | Saw slot (730-14.02) | LF | 1,932 | $5.01 | $5.00 | $5.00 |
| 54 | Loop wire (730-14.03) | LF | 8,141 | $1.10 | $1.10 | $1.10 |
| 55 | Expansion joint repairs (604-10.44) | LF | 558 | $310.59 | $314.00 | $374.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way