TDOT contract CNZ022 bid tabulation
F3-007,06s002-f8-007 microsurfacing on u.s. 11 (u.s. 64, s.r. 2) in bradley county from the hamilton county line to near boss road, plus in booker t. washington state park in hamilton county, and safety improvements on standifer gap road. Let by Tennessee DOT on February 7, 2025, Bradley And Hamilton Counties. 2 bids received; low bid $1,627,646 by Asphalt Paving Systems, Inc..
- Owner
- Tennessee DOT
- Letting
- 07 FEB 2025
- Pay items
- 55
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Asphalt Paving Systems, Inc. | $1,627,646 | Low |
| 2 | Wiregrass Construction Company, Inc | $1,994,887 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Asphalt Paving Systems, Inc. | 2. Wiregrass Construction Company, Inc |
|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 16.20 | $1,000.00 | $3,300.31 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 284 | $63.16 | $97.25 |
| 3 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 19 | $1,268.41 | $2,482.85 |
| 4 | High performance fog seals (403-01.10) | SY | 4,119 | $5.00 | $3.38 |
| 5 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 9.90 | $921.05 | $1,165.15 |
| 6 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 261 | $1,193.54 | $1,086.23 |
| 7 | Aggregate for micro surfacing (414-03.02) | TON | 2,172 | $212.08 | $298.31 |
| 8 | Shop curved guardrail (705-02.50) | LF | 50 | $50.53 | $46.61 |
| 9 | Earth pad for guard rail end treatment (705-04.10) | EACH | 2 | $3,263.16 | $2,396.89 |
| 10 | Guardrail delineation enhancement (705-04.21) | LF | 100 | $15.79 | $6.66 |
| 11 | Guardrail delineation enhancement (BI-directional) (705-04.22) | EACH | 528 | $8.95 | $7.99 |
| 12 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 2 | $4,421.05 | $4,527.46 |
| 13 | Guardrail removed (706-01) | LF | 50 | $10.53 | $5.33 |
| 14 | Traffic control (712-01) | LS | 1 | $52,760 | $58,324 |
| 15 | Flexible drums (channelizing) (712-04.01) | EACH | 20 | $35.79 | $45.27 |
| 16 | Signs (construction) (712-06) | SF | 853 | $8.58 | $10.85 |
| 17 | Flexible delineator (white) (713-02.14) | EACH | 39 | $50.53 | $63.92 |
| 18 | Roadside obstacle delineation (713-02.20) | SF | 12.50 | $23.68 | $29.96 |
| 19 | Sign post delineation enhancement (713-02.21) | LF | 260 | $6.84 | $8.66 |
| 20 | "U" section steel posts (713-11.01) | LB | 495 | $5.68 | $7.19 |
| 21 | Perforated/knockout square tube post (713-11.02) | LB | 2,905 | $5.60 | $7.08 |
| 22 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 186.15 | $17.74 | $22.44 |
| 23 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 569.25 | $18.42 | $23.30 |
| 24 | Remove sign, support & footing (713-15.36) | EACH | 74 | $26.32 | $33.29 |
| 25 | Changeable message sign unit (713-16.01) | EACH | 4 | $9,473.68 | $6,924.34 |
| 26 | Snowplowable reflective marker (716-01.10) | EACH | 250 | $40.00 | $48.27 |
| 27 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 846 | $40.00 | $48.27 |
| 28 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 13 | $40.00 | $48.27 |
| 29 | Removal of snowplowable reflective marker (716-01.30) | EACH | 859 | $8.95 | $82.56 |
| 30 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 104 | $23.16 | $29.96 |
| 31 | Plastic pavement marking (stop line) (716-02.05) | LF | 653 | $10.53 | $15.65 |
| 32 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 8 | $184.21 | $226.37 |
| 33 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 57 | $2.37 | $332.90 |
| 34 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.10 | $13,158 | $19,974 |
| 35 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 2 | $473.68 | $865.55 |
| 36 | Plastic word pavement marking (stop ahead) (716-03.03) | EACH | 2 | $500.00 | $765.67 |
| 37 | Plastic word pavement marking (20 MPH) (716-03.09) | EACH | 2 | $500.00 | $499.35 |
| 38 | Plastic word pavement marking (30 MPH) (716-03.10) | EACH | 1 | $500.00 | $499.35 |
| 39 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 1 | $236.84 | $266.32 |
| 40 | Plastic pavement marking (wrong way arrow) (716-04.06) | EACH | 13 | $236.84 | $326.24 |
| 41 | Plastic pavement marking (handicap symbol) (716-04.10) | EACH | 12 | $263.16 | $233.03 |
| 42 | Plastic pavement marking (noise strip) (716-04.16) | LF | 88 | $10.53 | $7.66 |
| 43 | Painted pavement marking (4" line) (716-05.01) | LM | 42.10 | $1,105.26 | $1,231.73 |
| 44 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 122 | $13.42 | $13.32 |
| 45 | Removal of pavement marking (stop line) (716-08.05) | LF | 100 | $5.26 | $4.66 |
| 46 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 4 | $105.26 | $99.87 |
| 47 | Removal of pavement marking (straight-turn arrow) (716-08.07) | EACH | 1 | $131.58 | $126.50 |
| 48 | Removal of word pavement marking (handicap symbol) (716-08.11) | EACH | 12 | $78.95 | $79.90 |
| 49 | Removal of pavement marking (wrong way arrow) (716-08.18) | EACH | 13 | $157.89 | $99.87 |
| 50 | Removal of pavement marking (line) (716-08.20) | LM | 29.70 | $3,289.47 | $1,386.62 |
| 51 | Enhanced flatline thermo PVMT MRKNG (4IN line) (716-12.01) | LM | 4.30 | $5,105.26 | $4,627.33 |
| 52 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 25.40 | $6,578.95 | $7,956.33 |
| 53 | Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01) | LM | 13 | $3,421.05 | $3,761.78 |
| 54 | Spray thermo PVMT MRKNG (60 mil) (4IN dotted line) (716-13.04) | LF | 1,035 | $0.53 | $0.93 |
| 55 | Mobilization (717-01) | LS | 1 | $146,138 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.