TDOT contract CNZ022 bid tabulation

F3-007,06s002-f8-007 microsurfacing on u.s. 11 (u.s. 64, s.r. 2) in bradley county from the hamilton county line to near boss road, plus in booker t. washington state park in hamilton county, and safety improvements on standifer gap road. Let by Tennessee DOT on February 7, 2025, Bradley And Hamilton Counties. 2 bids received; low bid $1,627,646 by Asphalt Paving Systems, Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
55
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Asphalt Paving Systems, Inc.$1,627,646Low
2Wiregrass Construction Company, Inc$1,994,887+23%
TDOT contract CNZ022: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Asphalt Paving Systems, Inc.2. Wiregrass Construction Company, Inc
1Brooming & degrassing shoulders (208-01.05)LM16.20$1,000.00$3,300.31
2Mineral aggregate, type A base, grading D (303-01)TON284$63.16$97.25
3Bituminous material for tack coat (micro-surfacing) (403-01.01)TON19$1,268.41$2,482.85
4High performance fog seals (403-01.10)SY4,119$5.00$3.38
5Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM9.90$921.05$1,165.15
6Emulsified asphalt for micro-surfacing (414-03.01)TON261$1,193.54$1,086.23
7Aggregate for micro surfacing (414-03.02)TON2,172$212.08$298.31
8Shop curved guardrail (705-02.50)LF50$50.53$46.61
9Earth pad for guard rail end treatment (705-04.10)EACH2$3,263.16$2,396.89
10Guardrail delineation enhancement (705-04.21)LF100$15.79$6.66
11Guardrail delineation enhancement (BI-directional) (705-04.22)EACH528$8.95$7.99
12GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH2$4,421.05$4,527.46
13Guardrail removed (706-01)LF50$10.53$5.33
14Traffic control (712-01)LS1$52,760$58,324
15Flexible drums (channelizing) (712-04.01)EACH20$35.79$45.27
16Signs (construction) (712-06)SF853$8.58$10.85
17Flexible delineator (white) (713-02.14)EACH39$50.53$63.92
18Roadside obstacle delineation (713-02.20)SF12.50$23.68$29.96
19Sign post delineation enhancement (713-02.21)LF260$6.84$8.66
20"U" section steel posts (713-11.01)LB495$5.68$7.19
21Perforated/knockout square tube post (713-11.02)LB2,905$5.60$7.08
22Flat sheet aluminum signs (0.080" thick) (713-13.02)SF186.15$17.74$22.44
23Flat sheet aluminum signs (0.100" thick) (713-13.03)SF569.25$18.42$23.30
24Remove sign, support & footing (713-15.36)EACH74$26.32$33.29
25Changeable message sign unit (713-16.01)EACH4$9,473.68$6,924.34
26Snowplowable reflective marker (716-01.10)EACH250$40.00$48.27
27Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH846$40.00$48.27
28Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH13$40.00$48.27
29Removal of snowplowable reflective marker (716-01.30)EACH859$8.95$82.56
30Plastic pavement marking(channelization striping) (716-02.04)SY104$23.16$29.96
31Plastic pavement marking (stop line) (716-02.05)LF653$10.53$15.65
32Plastic pavement marking (turn lane arrow) (716-02.06)EACH8$184.21$226.37
33Plastic pavement marking (8" dotted line) (716-02.08)LF57$2.37$332.90
34Plastic pavement marking (8IN line) (716-02.12)LM0.10$13,158$19,974
35Plastic word pavement marking (RXR) (716-03.02)EACH2$473.68$865.55
36Plastic word pavement marking (stop ahead) (716-03.03)EACH2$500.00$765.67
37Plastic word pavement marking (20 MPH) (716-03.09)EACH2$500.00$499.35
38Plastic word pavement marking (30 MPH) (716-03.10)EACH1$500.00$499.35
39Plastic pavement marking (straight-turn arrow) (716-04.01)EACH1$236.84$266.32
40Plastic pavement marking (wrong way arrow) (716-04.06)EACH13$236.84$326.24
41Plastic pavement marking (handicap symbol) (716-04.10)EACH12$263.16$233.03
42Plastic pavement marking (noise strip) (716-04.16)LF88$10.53$7.66
43Painted pavement marking (4" line) (716-05.01)LM42.10$1,105.26$1,231.73
44Removal of pavement marking (channelization striping) (716-08.04)SY122$13.42$13.32
45Removal of pavement marking (stop line) (716-08.05)LF100$5.26$4.66
46Removal of pavement marking (turn lane arrow) (716-08.06)EACH4$105.26$99.87
47Removal of pavement marking (straight-turn arrow) (716-08.07)EACH1$131.58$126.50
48Removal of word pavement marking (handicap symbol) (716-08.11)EACH12$78.95$79.90
49Removal of pavement marking (wrong way arrow) (716-08.18)EACH13$157.89$99.87
50Removal of pavement marking (line) (716-08.20)LM29.70$3,289.47$1,386.62
51Enhanced flatline thermo PVMT MRKNG (4IN line) (716-12.01)LM4.30$5,105.26$4,627.33
52Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM25.40$6,578.95$7,956.33
53Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01)LM13$3,421.05$3,761.78
54Spray thermo PVMT MRKNG (60 mil) (4IN dotted line) (716-13.04)LF1,035$0.53$0.93
55Mobilization (717-01)LS1$146,138$200,000
TDOT contract CNZ022: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy