Tennessee Valley Paving Co., Inc.: TDOT bid record
Tennessee Valley Paving Co., Inc. submitted 15 bids on Tennessee DOT contracts in the data, from 23 MAR 2018 to 27 JUN 2025, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $3,043,622
- Latest bid
- 27 JUN 2025
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 0 | 0% |
| 2020 | 1 | 1 | 100% |
| 2024 | 5 | 1 | 20% |
| 2025 | 4 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Dickson County | 3 | 1 | 33% |
| Hickman County | 2 | 0 | 0% |
| Dickson | 2 | 0 | 0% |
| Williamson County | 1 | 0 | 0% |
| Lewis County | 1 | 0 | 0% |
| Humphreys County | 1 | 0 | 0% |
| Cheatham County | 1 | 0 | 0% |
| Lawrence And Lewis | 1 | 1 | 100% |
| Lewis | 1 | 0 | 0% |
| Maury | 1 | 0 | 0% |
| Williamson | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 | 307-01.08 | TON | 12 | 3 (25%) | $99.75 | $163.00 |
| Acs mix(PG64-22) grading D | 411-01.10 | TON | 11 | 3 (27%) | $104.25 | $171.29 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 9 | 3 (33%) | $26.00 | $29.75 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 14 | 2 (14%) | $7,137.50 | $7,425.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 13 | 2 (15%) | $25.00 | $34.50 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 13 | 2 (15%) | $25.00 | $17.30 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 9 | 2 (22%) | $33.00 | $40.48 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 9 | 2 (22%) | $1,000.00 | $1,500.00 |
| Snowplowable raised pavment markers (mono-dir)(1 color) | 716-01.22 | EACH | 6 | 2 (33%) | $32.50 | $40.00 |
| Signs (construction) | 712-06 | SF | 15 | 1 (7%) | $10.00 | $8.00 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 13 | 1 (8%) | $29.00 | $45.00 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 9 | 1 (11%) | $13.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eubank Asphalt Paving & Sealing, LLC | 12 | 11 of 12 |
| Jones Bros. Contractors, LLC | 10 | 5 of 10 |
| Volunteer Paving, LLC | 7 | 4 of 7 |
| Rogers Group, Inc. | 5 | 3 of 5 |
| Vulcan Construction Materials, LLC | 4 | 2 of 4 |
| Wright Paving Contractors, Inc. | 2 | 2 of 2 |
| McIntosh Construction Company, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 JUN 2025 | CNZ167 | Cheatham County | The resurfacing on s.r. 49 from the dickson county line (l.m. 0.00) to the dickson county line (l.m. 1.00) | 2 of 4 | $233,552 | +8.0% |
| 21 MAR 2025 | CNZ094 | Dickson County | F3-003,22s096-f8-003,22s096-m3-004 the resurfacing on s.r. 47 from s.r. 46 (l.m. 0.00) to u.s. 70 (s.r. 1) (l.m. 10.19), and on s.r. 96 from | 3 of 3 | $5,242,860 | +19% |
| 21 MAR 2025 | CNZ093 | Dickson County | The resurfacing on s.r. 47 from s.r. 250 (l.m. 12.47) to s.r. 48 (l.m. 19.75) | 2 of 3 | $1,473,467 | +2.0% |
| 21 MAR 2025 | CNZ117 | Humphreys County | The resurfacing on u.s. 70 (s.r. 1) from west of west main street (l.m. 10.30) to powell avenue (l.m. 15.00) | 4 of 4 | $2,796,327 | +18% |
| 06 DEC 2024 | CNY276 | Hickman County | The resurfacing on s.r. 230 from s.r. 50 (l.m. 0.00) to s.r. 100 (l.m. 9.31) | 2 of 3 | $1,999,999 | +29% |
| 06 DEC 2024 | CNY301 | Hickman County | The resurfacing on s.r. 50 from collins lane (l.m. 25.25) to the maury county line (l.m. 31.66), and miscellaneous safety improvements from | 3 of 5 | $2,000,000 | +37% |
| 21 JUN 2024 | CNY158 | Lewis County | The resurfacing on keg springs road (falls branch road) from near the hickman county line (l.m. 0.20) to cathey's creek road (l.m. 1.82) | 2 of 3 | $378,755 | +13% |
| 22 MAR 2024 | CNY077 | Dickson County | The resurfacing on s.r. 46 from robin hood road (l.m. 4.24) to near s.r. 47 (l.m. 7.98) | 1 of 4 | $1,902,709 | Low, 6.0% under the second |
| 22 MAR 2024 | CNY076 | Williamson County | The resurfacing on s.r. 96 from the dickson county line (l.m. 0.00) to near s.r. 100 (fairview boulevard) (l.m. 5.51), including thin epoxy | 2 of 4 | $1,565,173 | +7.0% |
| 26 JUN 2020 | CNU265 | Lawrence And Lewis | The resurfacing on s.r. 241 from s.r. 240 (l.m. 5.16) in lawrence county to the natchez trace parkway in lewis county (l.m. 1.20) | 1 of 3 | $1,140,913 | Low, 2.0% under the second |
| 23 MAR 2018 | CNS114 | Dickson | The resurfacing on u.s. 70 (s.r. 1) from the humphreys county line (l.m. 0.00) to valley wood drive (l.m. 6.70) | 3 of 3 | $1,675,270 | +71% |
| 23 MAR 2018 | CNS129 | Dickson | The resurfacing on s.r. 49 from the houston county line (l.m. 0.00) to s.r. 48 (l.m. 14.33) | 3 of 3 | $2,214,113 | +62% |
| 23 MAR 2018 | CNS117 | Lewis | The resurfacing on s.r. 20 from napier road (l.m. 14.05) to the lawrence county line (l.m. 21.83) | 4 of 4 | $1,103,605 | +38% |
| 23 MAR 2018 | CNS113 | Maury | 3209-94 the resurfacing on s.r. 247 from s.r. 246 (l.m. 15.04) to west of cleburne road (l.m. 17.24) and on s.r. 247 from s.r. 7 (l.m. 5.73) | 6 of 6 | $1,398,728 | +47% |
| 23 MAR 2018 | CNS115 | Williamson | The resurfacing on s.r. 46 from u.s. 431 (s.r. 106) to s.r. 96 and on s.r. 96 from s.r. 46 to west of carlisle lane / boyd mill avenue | 4 of 4 | $2,042,497 | +42% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.