TDOT contract CNZ117 bid tabulation
The resurfacing on u.s. 70 (s.r. 1) from west of west main street (l.m. 10.30) to powell avenue (l.m. 15.00). Let by Tennessee DOT on March 21, 2025, Humphreys County. 4 bids received; low bid $2,362,526 by Eubank Asphalt Paving & Sealing, LLC.
- Owner
- Tennessee DOT
- Letting
- 21 MAR 2025
- Pay items
- 39
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eubank Asphalt Paving & Sealing, LLC | $2,362,526 | Low |
| 2 | Volunteer Paving, LLC | $2,716,976 | +15% |
| 3 | Jones Bros. Contractors, LLC | $2,767,890 | +17% |
| 4 | Tennessee Valley Paving Co., Inc. | $2,796,327 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eubank Asphalt Paving & Sealing, LLC | 2. Volunteer Paving, LLC | 3. Jones Bros. Contractors, LLC | 4. Tennessee Valley Paving Co., Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 15.40 | $300.00 | $1,281.21 | $840.00 | $1,000.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 889 | $14.00 | $54.00 | $41.00 | $32.00 |
| 3 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 316 | $85.00 | $206.91 | $125.00 | $75.00 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 94 | $300.00 | $988.90 | $795.00 | $1,000.00 |
| 5 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 3,331 | $103.00 | $106.07 | $101.00 | $109.00 |
| 6 | Acs mix(PG64-22) grading D (411-01.10) | TON | 10,996 | $117.75 | $120.18 | $118.00 | $114.00 |
| 7 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 3 | $500.00 | $1,827.00 | $1,740.00 | $2,000.00 |
| 8 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 3 | $500.00 | $1,827.00 | $1,740.00 | $2,000.00 |
| 9 | Cold planing bituminous pavement (415-01.01) | TON | 14,205 | $20.00 | $16.90 | $30.00 | $34.00 |
| 10 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 7 | $184.00 | $105.00 | $100.00 | $300.00 |
| 11 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 7 | $200.00 | $840.00 | $800.00 | $2,100.00 |
| 12 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 7 | $3,564.00 | $2,992.50 | $2,850.00 | $3,800.00 |
| 13 | Guardrail removed (706-01) | LF | 350 | $1.00 | $1.05 | $1.00 | $7.00 |
| 14 | Traffic control (712-01) | LS | 1 | $15,000 | $133,091 | $85,000 | $40,000 |
| 15 | Flexible drums (channelizing) (712-04.01) | EACH | 50 | $5.00 | $32.55 | $32.00 | $35.00 |
| 16 | Signs (construction) (712-06) | SF | 2,075 | $7.00 | $7.50 | $7.60 | $8.00 |
| 17 | Arrow board (type C) (712-08.03) | EACH | 2 | $500.00 | $1,617.00 | $1,500.00 | $1,700.00 |
| 18 | Removal of signs, posts and footings (713-15) | LS | 1 | $614.00 | $1,576.05 | $600.00 | $800.00 |
| 19 | Signs (W10-1 grade crossing adv. warn.) (713-16.20) | EACH | 2 | $376.00 | $211.05 | $350.00 | $400.00 |
| 20 | Signs (W10-2 intersection crossing adv. warn.) (713-16.21) | EACH | 10 | $314.00 | $211.05 | $350.00 | $400.00 |
| 21 | Signs (W10-3 intersection crossing adv. warn.) (713-16.22) | EACH | 2 | $314.00 | $211.05 | $350.00 | $400.00 |
| 22 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 113 | $30.00 | $35.00 | $32.00 | $33.00 |
| 23 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 667 | $30.00 | $35.00 | $32.00 | $33.00 |
| 24 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 141 | $30.00 | $35.00 | $32.00 | $33.00 |
| 25 | Removal of snowplowable reflective marker (716-01.30) | EACH | 921 | $7.00 | $10.00 | $12.00 | $13.00 |
| 26 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 100 | $30.00 | $30.00 | $30.00 | $32.00 |
| 27 | Plastic pavement marking (stop line) (716-02.05) | LF | 615 | $20.00 | $20.00 | $25.00 | $26.00 |
| 28 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 48 | $225.00 | $210.00 | $250.00 | $260.00 |
| 29 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 4,041 | $2.00 | $2.00 | $3.00 | $3.25 |
| 30 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1 | $10,000 | $10,000 | $15,000 | $15,500 |
| 31 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 3 | $300.00 | $300.00 | $500.00 | $550.00 |
| 32 | Plastic pavement marking(double turning arrow) (716-04.02) | EACH | 2 | $300.00 | $300.00 | $600.00 | $650.00 |
| 33 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 200 | $15.00 | $15.00 | $16.00 | $18.00 |
| 34 | Plastic pavement marking (yield line) (716-04.12) | SF | 180 | $30.00 | $30.00 | $20.00 | $22.00 |
| 35 | Painted pavement marking (6" line) (716-05.20) | LM | 23 | $1,200.00 | $1,200.00 | $1,200.00 | $1,225.00 |
| 36 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 23 | $7,000.00 | $7,000.00 | $7,200.00 | $7,250.00 |
| 37 | Mobilization (717-01) | LS | 1 | $15,000 | $60,461 | $62,000 | $48,000 |
| 38 | Saw slot (730-14.02) | LF | 4,662 | $1.00 | $5.25 | $5.00 | $7.00 |
| 39 | Loop wire (730-14.03) | LF | 10,224 | $0.50 | $1.05 | $1.00 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.