TDOT contract CNZ294 bid tabulation
The resurfacing on u.s. 70s (s.r. 1) from 15th avenue north (l.m. 17.00) to near transit avenue (l.m. 20.30). Let by Tennessee DOT on December 5, 2025, Davidson County. 4 bids received; low bid $2,256,458 by Volunteer Paving, LLC.
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 36
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Volunteer Paving, LLC | $2,256,458 | Low |
| 2 | Vulcan Construction Materials, LLC | $2,307,141 | +2.0% |
| 3 | Jones Bros. Contractors, LLC | $2,347,240 | +4.0% |
| 4 | Rogers Group, Inc. | $2,597,764 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Volunteer Paving, LLC | 2. Vulcan Construction Materials, LLC | 3. Jones Bros. Contractors, LLC | 4. Rogers Group, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 2.70 | $890.53 | $6,170.00 | $2,000.00 | $4,250.00 |
| 2 | Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15) | TON | 200 | $219.41 | $175.00 | $175.00 | $190.00 |
| 3 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 300 | $243.74 | $175.00 | $140.00 | $170.00 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 46 | $1,016.30 | $1,000.00 | $785.00 | $1,130.00 |
| 5 | Acs mix(PG70-22) grading D (411-02.10) | TON | 6,913 | $133.56 | $160.00 | $165.00 | $165.00 |
| 6 | Cold planing bituminous pavement (415-01.01) | TON | 7,150 | $32.13 | $45.00 | $44.00 | $50.00 |
| 7 | Adjustment of existing manhole (611-01.20) | EACH | 2 | $1,665.00 | $800.00 | $800.00 | $880.00 |
| 8 | Gray iron castings (catchbasin) (611-03.04) | LB | 661 | $5.55 | $6.00 | $6.00 | $6.65 |
| 9 | Adjustment of existing catchbasin (611-09.01) | EACH | 34 | $1,665.00 | $700.00 | $700.00 | $770.00 |
| 10 | Traffic control (712-01) | LS | 1 | $127,650 | $98,000 | $155,000 | $195,000 |
| 11 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $34.41 | $35.10 | $31.00 | $33.00 |
| 12 | Signs (construction) (712-06) | SF | 2,029 | $7.60 | $9.50 | $6.85 | $7.35 |
| 13 | Delineators (all) (713-02.34) | EACH | 18 | $66.60 | $75.00 | $60.00 | $64.50 |
| 14 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 525 | $45.00 | $30.00 | $36.00 | $33.00 |
| 15 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 715 | $45.00 | $30.00 | $34.00 | $33.00 |
| 16 | Removal of snowplowable reflective marker (716-01.30) | EACH | 150 | $10.00 | $15.00 | $18.00 | $16.50 |
| 17 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 112 | $35.00 | $35.00 | $35.00 | $38.15 |
| 18 | Plastic pavement marking (stop line) (716-02.05) | LF | 1,750 | $25.00 | $22.00 | $20.00 | $27.25 |
| 19 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 60 | $225.00 | $230.00 | $165.00 | $250.00 |
| 20 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 2,000 | $4.00 | $4.00 | $2.00 | $4.40 |
| 21 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 4,200 | $40.00 | $35.00 | $35.00 | $44.00 |
| 22 | Plastic pavement marking (6" dotted line) (716-02.11) | LF | 1,500 | $2.50 | $3.00 | $1.50 | $3.25 |
| 23 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.80 | $10,000 | $15,000 | $8,000.00 | $16,500 |
| 24 | Plastic word pavement marking (only) (716-03.01) | EACH | 9 | $400.00 | $600.00 | $400.00 | $650.00 |
| 25 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 6 | $800.00 | $700.00 | $900.00 | $765.00 |
| 26 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 4 | $400.00 | $450.00 | $300.00 | $490.00 |
| 27 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 300 | $10.00 | $12.00 | $10.00 | $13.00 |
| 28 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 3 | $225.00 | $230.00 | $165.00 | $250.00 |
| 29 | Plastic pavement marking (yield line) (716-04.12) | SF | 120 | $30.00 | $50.00 | $45.00 | $55.00 |
| 30 | Plastic pavement marking (yield symbol) (716-04.17) | EACH | 8 | $325.00 | $200.00 | $500.00 | $218.00 |
| 31 | Plastic pavement marking (fish-hooks with 2 arrows) (716-04.24) | EACH | 6 | $750.00 | $1,000.00 | $750.00 | $1,100.00 |
| 32 | Painted pavement marking (6" line) (716-05.20) | LM | 13.50 | $1,200.00 | $1,300.00 | $1,350.00 | $1,420.00 |
| 33 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 13.50 | $7,500.00 | $7,300.00 | $7,500.00 | $8,000.00 |
| 34 | Mobilization (717-01) | LS | 1 | $150,190 | $50,000 | $54,500 | $93,000 |
| 35 | Saw slot (730-14.02) | LF | 15,557 | $5.55 | $5.00 | $5.00 | $5.50 |
| 36 | Loop wire (730-14.03) | LF | 33,914 | $1.22 | $1.10 | $1.10 | $1.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.