TDOT contract CN263044 bid tabulation
The resurfacing on u.s. 31e (s.r. 6) from near saundersville road (l.m. 6.60) to near greensboro drive (l.m. 11.00). Let by Tennessee DOT on May 8, 2026, Sumner County. 3 bids received; low bid $2,790,743 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 08 MAY 2026
- Pay items
- 53
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $2,790,743 | Low |
| 2 | Volunteer Paving, LLC | $3,039,840 | +9.0% |
| 3 | Jones Bros. Contractors, LLC | $3,724,928 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Volunteer Paving, LLC | 3. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Removal of curb and gutter (for curb ramps) (202-08.15) | LF | 414 | $26.50 | $21.42 | $27.00 |
| 2 | Brooming & degrassing shoulders (208-01.05) | LM | 7.60 | $1,700.00 | $1,066.70 | $3,800.00 |
| 3 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,046 | $36.50 | $40.31 | $80.00 |
| 4 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 2,316 | $90.00 | $143.13 | $140.00 |
| 5 | Bituminous material for tack coat (TC) (403-01) | TON | 87 | $860.00 | $789.21 | $800.00 |
| 6 | Acs mix(PG70-22) grading D (411-02.10) | TON | 11,827 | $110.00 | $115.17 | $145.00 |
| 7 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 6.40 | $915.00 | $1,003.43 | $1,475.00 |
| 8 | Cold planing bituminous pavement (415-01.01) | TON | 13,861 | $17.50 | $18.45 | $39.75 |
| 9 | Concrete sidewalk (4 ") (701-01.01) | SF | 554.01 | $21.75 | $13.26 | $16.30 |
| 10 | Concrete curb ramp (retrofit) (701-02.01) | SF | 2,297 | $36.00 | $13.26 | $30.00 |
| 11 | Detectable warning surface (rehabilitation) (701-02.06) | SF | 95.40 | $85.00 | $78.54 | $55.00 |
| 12 | Concrete combined curb & gutter (702-03) | CY | 23 | $575.00 | $691.56 | $815.00 |
| 13 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 8 | $110.00 | $102.00 | $100.00 |
| 14 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 3 | $880.00 | $816.00 | $800.00 |
| 15 | Earth pad for guard rail end treatment (705-04.10) | EACH | 1 | $880.00 | $816.00 | $800.00 |
| 16 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 2 | $3,600.00 | $3,315.00 | $3,250.00 |
| 17 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 5 | $3,450.00 | $3,213.00 | $3,150.00 |
| 18 | Guardrail removed (706-01) | LF | 50 | $1.10 | $1.02 | $1.00 |
| 19 | Rounded end element (706-10.26) | EACH | 1 | $275.00 | $255.00 | $250.00 |
| 20 | Traffic control (712-01) | LS | 1 | $89,000 | $119,850 | $150,000 |
| 21 | Flexible drums (channelizing) (712-04.01) | EACH | 95 | $16.25 | $35.70 | $26.50 |
| 22 | Signs (construction) (712-06) | SF | 2,040 | $9.25 | $8.16 | $6.75 |
| 23 | Arrow board (type C) (712-08.03) | EACH | 2 | $800.00 | $2,356.20 | $950.00 |
| 24 | Removal of signs, posts and footings (713-15) | LS | 1 | $525.00 | $510.00 | $200.00 |
| 25 | Changeable message sign unit (713-16.01) | EACH | 2 | $2,700.00 | $7,303.20 | $5,000.00 |
| 26 | Signs (R3-17, bike lane, 24" X 18") (713-16.20) | EACH | 18 | $105.00 | $204.00 | $210.00 |
| 27 | Signs (W16-9P, ahead (plaque) (713-16.21) | EACH | 1 | $70.00 | $66.30 | $50.00 |
| 28 | Signs (R4-4, begin right turn lane yield to bikes, 36" X 30") (713-16.22) | EACH | 16 | $200.00 | $255.00 | $260.00 |
| 29 | Signs (R3-7R. right lane must turn right, 36" X 36") (713-16.23) | EACH | 17 | $225.00 | $255.00 | $290.00 |
| 30 | Signs (R3-17BP, ends, 24"X9") (713-16.24) | EACH | 3 | $40.00 | $76.50 | $30.00 |
| 31 | Signs (R3-7BP, except bicycles (plaque) (713-16.25) | EACH | 17 | $45.00 | $76.50 | $40.00 |
| 32 | Signs (R3-17, bike lane, 36" X 27") (713-16.26) | EACH | 2 | $175.00 | $255.00 | $250.00 |
| 33 | Signs (R9-5, bicycles use pedestrian signal, 12' X 18") (713-16.27) | EACH | 2 | $100.00 | $153.00 | $250.00 |
| 34 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 662 | $39.50 | $41.50 | $37.00 |
| 35 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 672 | $39.50 | $41.50 | $37.00 |
| 36 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 120 | $36.50 | $45.00 | $35.00 |
| 37 | Plastic pavement marking (stop line) (716-02.05) | LF | 744 | $21.00 | $28.00 | $18.00 |
| 38 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 59 | $160.00 | $225.00 | $175.00 |
| 39 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 123 | $16.00 | $30.00 | $18.00 |
| 40 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 3,415 | $2.15 | $2.75 | $1.50 |
| 41 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 1,182 | $36.50 | $33.50 | $30.00 |
| 42 | Plastic pavement marking (6" dotted line) (716-02.11) | LF | 6,275 | $1.10 | $1.50 | $1.00 |
| 43 | Plastic word pavement marking (only) (716-03.01) | EACH | 29 | $420.00 | $400.00 | $400.00 |
| 44 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 1,904 | $5.25 | $10.00 | $7.00 |
| 45 | Plastic pavement marking (bikelane symbol & arrow) (716-04.13) | EACH | 33 | $420.00 | $450.00 | $400.00 |
| 46 | Plastic pavement marking-bike symbol/arrow shared (716-04.15) | EACH | 41 | $365.00 | $450.00 | $400.00 |
| 47 | Painted pavement marking (6" line) (716-05.20) | LM | 34.70 | $1,550.00 | $1,200.00 | $1,000.00 |
| 48 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 34.70 | $6,900.00 | $7,125.00 | $7,000.00 |
| 49 | Enhanced flat line thermo (8IN line) (716-12.06) | LF | 4,475 | $1.60 | $3.00 | $1.50 |
| 50 | Mobilization (717-01) | LS | 1 | $50,000 | $90,402 | $60,000 |
| 51 | Saw slot (730-14.02) | LF | 3,542 | $5.90 | $5.61 | $5.50 |
| 52 | Loop wire (730-14.03) | LF | 8,084 | $0.86 | $0.82 | $0.80 |
| 53 | Green textured bike lane (716-04.21) | SY | 565 | $93.25 | $95.00 | $105.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.