TDOT contract CN263054 bid tabulation
The resurfacing on i-65 from south of concord road (l.m. 17.50) to the davidson county line (l.m. 21.38). Let by Tennessee DOT on June 26, 2026, Williamson County. 4 bids received; low bid $4,718,657 by Volunteer Paving, LLC.
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 53
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Volunteer Paving, LLC | $4,718,657 | Low |
| 2 | Rogers Group, Inc. | $4,861,770 | +3.0% |
| 3 | Vulcan Construction Materials, LLC | $5,269,450 | +12% |
| 4 | Jones Bros. Contractors, LLC | $6,039,257 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Volunteer Paving, LLC | 2. Rogers Group, Inc. | 3. Vulcan Construction Materials, LLC | 4. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 7.80 | $1,588.29 | $2,000.00 | $4,400.00 | $2,150.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,027 | $51.69 | $45.00 | $47.00 | $50.00 |
| 3 | Bituminous material for tack coat (TC) (403-01) | TON | 139 | $929.77 | $950.00 | $1,100.00 | $950.00 |
| 4 | Void reducing asphalt membrane (vram) half-width (411-01.51) | LF | 247,316 | $1.70 | $1.60 | $1.40 | $1.40 |
| 5 | Acs mix(PG76-22) grading D (411-03.10) | TON | 20,843 | $120.61 | $134.00 | $145.00 | $175.00 |
| 6 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 14.60 | $764.25 | $640.00 | $605.00 | $1,690.00 |
| 7 | Cold planing bituminous pavement (415-01.01) | TON | 20,647 | $19.85 | $29.00 | $28.00 | $38.50 |
| 8 | Adjustment of existing catchbasin (611-09.01) | EACH | 11 | $2,008.50 | $2,100.00 | $1,950.00 | $1,950.00 |
| 9 | Traffic control (712-01) | LS | 1 | $205,485 | $115,500 | $190,000 | $227,500 |
| 10 | Flexible drums (channelizing) (712-04.01) | EACH | 576 | $29.87 | $27.50 | $58.00 | $26.00 |
| 11 | Warning lights (type C) (712-05.03) | EACH | 64 | $20.60 | $10.75 | $5.00 | $10.00 |
| 12 | Signs (construction) (712-06) | SF | 2,098 | $7.06 | $7.50 | $12.00 | $6.50 |
| 13 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 5 | $257.50 | $320.00 | $650.00 | $300.00 |
| 14 | Temporary barricades (type III) (712-07.03) | LF | 24 | $25.75 | $23.50 | $25.00 | $22.00 |
| 15 | Arrow board (type C) (712-08.03) | EACH | 6 | $1,081.50 | $900.00 | $800.00 | $900.00 |
| 16 | Speed feedback sign assembly (712-08.08) | EACH | 2 | $4,223.00 | $1,700.00 | $3,500.00 | $4,100.00 |
| 17 | Digital speed limit sign assembly (712-08.09) | EACH | 10 | $4,223.00 | $1,700.00 | $3,500.00 | $4,100.00 |
| 18 | Queue protection truck (712-08.12) | DAY | 120 | $1,133.00 | $1,100.00 | $1,275.00 | $1,100.00 |
| 19 | Changeable message sign unit (713-16.01) | EACH | 4 | $4,223.00 | $1,700.00 | $4,500.00 | $4,800.00 |
| 20 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 2,171 | $45.00 | $40.00 | $38.00 | $37.00 |
| 21 | Removal of snowplowable reflective marker (716-01.30) | EACH | 2,171 | $10.00 | $15.75 | $15.00 | $10.00 |
| 22 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 36 | $35.00 | $52.60 | $50.00 | $35.00 |
| 23 | Plastic pavement marking (stop line) (716-02.05) | LF | 52 | $30.00 | $21.00 | $20.00 | $17.00 |
| 24 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 12 | $235.00 | $210.00 | $200.00 | $160.00 |
| 25 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 403 | $30.00 | $12.50 | $12.00 | $16.00 |
| 26 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 736 | $4.00 | $4.25 | $4.00 | $1.50 |
| 27 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.40 | $12,500 | $12,500 | $12,000 | $7,500.00 |
| 28 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 6 | $400.00 | $315.00 | $300.00 | $275.00 |
| 29 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 4 | $225.00 | $210.00 | $200.00 | $160.00 |
| 30 | Plastic pavement marking (H.O.V. diamond) (716-04.09) | EACH | 32 | $400.00 | $420.00 | $400.00 | $160.00 |
| 31 | Plastic pavement marking (yield line) (716-04.12) | SF | 45 | $30.00 | $42.00 | $40.00 | $30.00 |
| 32 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 1,970 | $0.80 | $0.63 | $0.60 | $1.50 |
| 33 | Painted pavement marking (6" line) (716-05.20) | LM | 26.30 | $1,200.00 | $1,475.00 | $1,400.00 | $1,100.00 |
| 34 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 36 | $20.00 | $21.00 | $20.00 | $7.00 |
| 35 | Removal of pavement marking (stop line) (716-08.05) | LF | 52 | $10.00 | $5.25 | $5.00 | $5.00 |
| 36 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 12 | $75.00 | $52.50 | $50.00 | $50.00 |
| 37 | Removal of pavement marking (straight-turn arrow) (716-08.07) | EACH | 6 | $100.00 | $52.50 | $50.00 | $50.00 |
| 38 | Removal of pavement marking (dotted line) (716-08.09) | LF | 736 | $1.00 | $0.63 | $0.60 | $0.90 |
| 39 | Removal of pavement marking (yield line) (716-08.19) | SF | 45 | $20.00 | $10.50 | $10.00 | $1.00 |
| 40 | Removal of pavement marking (line) (716-08.20) | LM | 2.20 | $5,280.00 | $3,100.00 | $3,000.00 | $5,000.00 |
| 41 | Removal of pavement marking (straight arrow) (716-08.23) | EACH | 4 | $75.00 | $52.50 | $50.00 | $50.00 |
| 42 | Contrast pavement marking 6" (716-09.83) | LF | 600 | $9.50 | $10.50 | $10.00 | $2.80 |
| 43 | Contrast pavement marking 12" (716-09.89) | LF | 150 | $18.00 | $31.50 | $30.00 | $5.60 |
| 44 | Contrast pavement shadow marking 6" (716-09.97) | LF | 188 | $15.00 | $6.30 | $6.00 | $1.25 |
| 45 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 22 | $7,200.00 | $7,100.00 | $6,800.00 | $6,750.00 |
| 46 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 1,970 | $4.00 | $1.05 | $1.00 | $1.50 |
| 47 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 4,431 | $3.00 | $2.10 | $2.00 | $1.15 |
| 48 | Enhanced flat line thermo (12IN line) (716-12.09) | LF | 20,486 | $6.00 | $4.15 | $4.00 | $2.50 |
| 49 | Mobilization (717-01) | LS | 1 | $161,316 | $50,000 | $125,000 | $150,000 |
| 50 | Install pull box (type A) (730-03.20) | EACH | 2 | $772.50 | $1,300.00 | $1,200.00 | $750.00 |
| 51 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 40 | $18.80 | $23.50 | $18.00 | $18.25 |
| 52 | Saw slot (730-14.02) | LF | 750 | $5.41 | $5.50 | $5.00 | $5.25 |
| 53 | Loop wire (730-14.03) | LF | 3,000 | $0.82 | $1.10 | $1.00 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.