TDOT contract CN261075 bid tabulation
009,crp-32(108),15s032-f3-005,crp-33(169),62s033-f3-009,crp- 34(144),45s034-f3-004,crp-34(145),90s034-f3-007 the traffic signal modernization improvements at various intersections along various u.s. and state routes. Let by Tennessee DOT on October 2, 2026, Counties Cocke, Hawkins, Jefferson, Monroe, Scott, And Washington. 3 bids received; low bid $715,638 by Stansell Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 42
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stansell Electric Company, Inc. | $715,638 | Low |
| 2 | Davis H. Elliot Construction Company, Inc. | $792,165 | +11% |
| 3 | Progression Electric, LLC | $903,399 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stansell Electric Company, Inc. | 2. Davis H. Elliot Construction Company, Inc. | 3. Progression Electric, LLC |
|---|---|---|---|---|---|---|
| 1 | Traffic control (712-01) | LS | 1 | $41,550 | $20,000 | $26,650 |
| 2 | Street name sign (suspended 0.100IN thick) (713-14.22) | SF | 48 | $181.00 | $60.00 | $23.50 |
| 3 | Suspended flat sheet aluminum sign (0.080" thick) (713-15.07) | EACH | 8 | $608.00 | $650.00 | $422.00 |
| 4 | Signs (R10-11, 24" X 30", ground mounted) (713-16.20) | EACH | 1 | $501.00 | $500.00 | $864.00 |
| 5 | Signs (R10-11, 24" X 30", strain pole mounted) (713-16.21) | EACH | 1 | $446.00 | $500.00 | $519.00 |
| 6 | Remove and reinstall sign (street name) (713-16.70) | EACH | 6 | $409.00 | $350.00 | $259.00 |
| 7 | Remove and reinstall sign (intersection number sign) (713-16.71) | EACH | 2 | $297.00 | $250.00 | $244.00 |
| 8 | Plastic pavement marking (stop line) (716-02.05) | LF | 75 | $15.00 | $25.00 | $21.15 |
| 9 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 1 | $180.00 | $400.00 | $289.00 |
| 10 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 1 | $230.00 | $600.00 | $354.00 |
| 11 | Removal of pavement marking (stop line) (716-08.05) | LF | 75 | $8.00 | $10.00 | $12.00 |
| 12 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 1 | $100.00 | $100.00 | $191.00 |
| 13 | Removal of pavement marking (straight-turn arrow) (716-08.07) | EACH | 1 | $125.00 | $1,500.00 | $285.00 |
| 14 | Mobilization (717-01) | LS | 1 | $70,300 | $39,608 | $60,000 |
| 15 | Signal head assembly (130 A3) (730-02.02) | EACH | 2 | $1,370.00 | $2,350.00 | $1,294.00 |
| 16 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 9 | $1,320.00 | $2,300.00 | $1,507.00 |
| 17 | Signal head assembly (130) (730-02.07) | EACH | 10 | $1,120.00 | $2,150.00 | $1,878.00 |
| 18 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 58 | $1,215.00 | $2,250.00 | $1,489.00 |
| 19 | Signal head assembly (140 A1) (730-02.13) | EACH | 2 | $1,355.00 | $2,350.00 | $2,075.00 |
| 20 | Signal head assembly (150 A2H) (730-02.16) | EACH | 4 | $1,565.00 | $2,450.00 | $2,331.00 |
| 21 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 13 | $1,865.00 | $2,750.00 | $2,621.00 |
| 22 | Signal head assembly (260) (730-02.24) | EACH | 6 | $1,705.00 | $2,500.00 | $3,212.00 |
| 23 | Signal head assembly (260 A3) (730-02.30) | EACH | 1 | $1,740.00 | $2,550.00 | $3,192.00 |
| 24 | Signal head assembly (260 A6) (730-02.31) | EACH | 1 | $1,780.00 | $2,650.00 | $3,192.00 |
| 25 | Modify existing electrical service connection (730-05.04) | EACH | 1 | $980.00 | $3,000.00 | $3,455.00 |
| 26 | Signal cable - 5 conductor (730-08.02) | LF | 2,125 | $3.00 | $4.00 | $2.85 |
| 27 | Signal cable - 7 conductor (730-08.03) | LF | 7,310 | $3.60 | $5.00 | $3.00 |
| 28 | Span wire assembly (730-09.20) | LF | 3,830 | $3.80 | $5.00 | $3.40 |
| 29 | Span wire assembly (location 1) (730-09.21) | LF | 190 | $6.00 | $5.00 | $3.40 |
| 30 | Span wire assembly (location 2) (730-09.22) | LF | 575 | $5.00 | $5.00 | $3.40 |
| 31 | Tether wire assembly - 1/4" diameter (730-10.01) | LF | 4,595 | $3.00 | $5.00 | $2.85 |
| 32 | Vehicle detector (radar - stop line) (730-13.12) | EACH | 8 | $8,115.00 | $8,500.00 | $12,118 |
| 33 | Vehicle detector (radar - advance) (730-13.13) | EACH | 10 | $8,710.00 | $7,500.00 | $11,000 |
| 34 | Vehicle detector (360-degree camera) (730-13.14) | EACH | 1 | $29,150 | $24,802 | $38,759 |
| 35 | Vehicle detector (radar/video) (730-13.16) | EACH | 2 | $7,605.00 | $8,500.00 | $35,797 |
| 36 | Vehicle detector (radar-single unit multi-approach) (730-13.18) | EACH | 4 | $13,300 | $18,000 | $19,220 |
| 37 | Cabinet maintenance (filter) (730-15.16) | EACH | 11 | $115.00 | $1,000.00 | $85.00 |
| 38 | Modify cabinet (controller programming) (730-15.25) | EACH | 1 | $196.00 | $2,250.00 | $306.00 |
| 39 | Modify cabinet (radar installation) (730-15.26) | EACH | 6 | $5,975.00 | $2,250.00 | $306.00 |
| 40 | Modify cabinet (video installation) (730-15.27) | EACH | 1 | $2,955.00 | $2,250.00 | $306.00 |
| 41 | Controller (atc) (730-16.04) | EACH | 11 | $6,115.00 | $6,000.00 | $11,018 |
| 42 | Cabinet monitor unit (730-16.51) | EACH | 11 | $1,590.00 | $2,000.00 | $2,891.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.