TDOT contract CNZ273 bid tabulation
The expansion of the rural smartway intelligent transportation system (its) on i-155 in dyer county, on i-65 in giles and marshall counties, and on i-40 in roane county. Let by Tennessee DOT on October 3, 2025, Counties Dyer, Giles, Marshall, And Roane. 2 bids received; low bid $4,527,341 by Stansell Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 77
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stansell Electric Company, Inc. | $4,527,341 | Low |
| 2 | Lumin8 Transportation Technologies, LLC | $4,971,676 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stansell Electric Company, Inc. | 2. Lumin8 Transportation Technologies, LLC |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $60,000 | $44,160 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $18,500 | $33,422 |
| 3 | Furnishing & spreading topsoil (203-07) | CY | 7 | $123.00 | $463.00 |
| 4 | Sediment removal (209-05) | CY | 70 | $92.50 | $385.00 |
| 5 | Temporary silt fence (with backing) (209-08.02) | LF | 4,220 | $6.50 | $8.10 |
| 6 | Sandbags (209-09.01) | BAG | 60 | $18.00 | $46.70 |
| 7 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 698 | $11.50 | $12.00 |
| 8 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 6 | $2,315.00 | $1,472.00 |
| 9 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 2,325 | $40.00 | $47.85 |
| 10 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 9 | $1,915.00 | $2,870.00 |
| 11 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 6 | $4,280.00 | $4,342.00 |
| 12 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 2 | $2,645.00 | $3,680.00 |
| 13 | High-visibility construction fence (707-08.11) | LF | 4,220 | $2.20 | $6.80 |
| 14 | Traffic control (712-01) | LS | 1 | $113,000 | $306,165 |
| 15 | Interconnected portable barrier rail (712-02.02) | LF | 4,050 | $74.50 | $47.10 |
| 16 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 3 | $11,350 | $13,545 |
| 17 | Flexible drums (channelizing) (712-04.01) | EACH | 370 | $59.50 | $70.65 |
| 18 | Barrier rail delineator (712-04.50) | EACH | 210 | $17.50 | $20.60 |
| 19 | Signs (construction) (712-06) | SF | 848 | $9.70 | $11.55 |
| 20 | Arrow board (type C) (712-08.03) | EACH | 6 | $1,545.00 | $1,840.00 |
| 21 | Queue protection truck (712-08.12) | DAY | 20 | $1,730.00 | $2,060.00 |
| 22 | Changeable message sign unit (713-16.01) | EACH | 10 | $8,025.00 | $8,979.00 |
| 23 | Mobilization (717-01) | LS | 1 | $419,500 | $171,500 |
| 24 | CCTV pole & foundation (80FT pole W/LWRNG dvice) (725-20.02) | EACH | 3 | $50,550 | $54,549 |
| 25 | Maintenance work pad (concrete pad) (725-20.09) | EACH | 3 | $1,580.00 | $783.00 |
| 26 | Steel overhead sign structure (spans 51 to 70 feet) (725-20.22) | EACH | 3 | $166,000 | $151,085 |
| 27 | Steel sign structure (multi-color DMS) (725-20.31) | EACH | 1 | $97,800 | $106,629 |
| 28 | Pull box (type C) (725-20.43) | EACH | 35 | $2,195.00 | $1,488.00 |
| 29 | Pull box (type D) (725-20.44) | EACH | 5 | $4,455.00 | $3,972.00 |
| 30 | Pull box (type E) (725-20.45) | EACH | 7 | $4,980.00 | $4,630.00 |
| 31 | Pull box (structure mounted) (725-20.46) | EACH | 5 | $3,450.00 | $6,992.00 |
| 32 | Cable (1/C #6 AWG.) (725-20.55) | LF | 1,380 | $2.40 | $1.90 |
| 33 | Cable (1/C #2 AWG.) (725-20.57) | LF | 16,090 | $1.30 | $3.05 |
| 34 | Cable (1/C #1/0 AWG.) (725-20.58) | LF | 10,920 | $1.80 | $5.05 |
| 35 | Cable (1/C #3/0 AWG.) (725-20.60) | LF | 14,760 | $2.10 | $5.76 |
| 36 | Electrical connection (725-20.71) | LS | 1 | $8,990.00 | $69,620 |
| 37 | CCTV camera system (pan tilt & zoom) (725-20.91) | EACH | 3 | $6,230.00 | $5,110.00 |
| 38 | CCTV camera system (static) (725-20.92) | EACH | 3 | $4,245.00 | $5,655.00 |
| 39 | Dynamic message sign (multi-color) (725-21.02) | EACH | 4 | $108,000 | $130,656 |
| 40 | Network switch (type A) (725-21.11) | EACH | 7 | $22,750 | $5,930.00 |
| 41 | Demarcation site (overhead power) (725-21.43) | EACH | 5 | $4,285.00 | $27,330 |
| 42 | Uninterruptible power supply (725-21.85) | EACH | 7 | $8,230.00 | $4,656.00 |
| 43 | Environmental sensor comm cable (725-21.87) | LF | 150 | $16.50 | $7.30 |
| 44 | Radar detection system (725-21.91) | EACH | 3 | $14,650 | $14,463 |
| 45 | RDS comm cable (725-21.96) | LF | 150 | $3.60 | $7.35 |
| 46 | Environmental sensor (PVMT temp & precip) (725-22.13) | EACH | 3 | $32,600 | $78,697 |
| 47 | Conduit bank (type 4) (725-22.24) | LF | 1,380 | $11.00 | $21.00 |
| 48 | DMS conduit bank (725-22.50) | LF | 300 | $44.00 | $8.90 |
| 49 | Structure conduit bank (type 4) (725-22.64) | LF | 3,000 | $190.00 | $297.00 |
| 50 | 2IN conduit (725-22.71) | LF | 55 | $24.00 | $41.40 |
| 51 | 2IN conduit bored (725-22.72) | LF | 85 | $73.00 | $31.60 |
| 52 | 2IN structure conduit (725-22.73) | LF | 45 | $76.50 | $51.55 |
| 53 | 2IN conduit structure W/bank (725-22.76) | LF | 3,000 | $35.00 | $51.55 |
| 54 | 3IN conduit (725-22.78) | LF | 4,725 | $31.50 | $7.55 |
| 55 | 3IN conduit bored (725-22.79) | LF | 1,850 | $51.50 | $46.45 |
| 56 | 3IN conduit W/bank (725-22.80) | LF | 1,380 | $7.80 | $3.75 |
| 57 | ITS cable marker (725-23.01) | EACH | 30 | $264.00 | $40.80 |
| 58 | Fiber optic cable (144F) (725-23.16) | LF | 1,830 | $3.40 | $2.45 |
| 59 | Fiber optic drop cable (12 F) (725-23.21) | LF | 150 | $2.20 | $1.70 |
| 60 | Fiber optic closure (12 F) (725-23.26) | EACH | 2 | $1,175.00 | $837.00 |
| 61 | Fiber optic drop panel ( 12 F ) (725-23.31) | EACH | 7 | $1,730.00 | $930.00 |
| 62 | Cabinet (type B) (725-24.02) | EACH | 3 | $5,615.00 | $5,775.00 |
| 63 | Cabinet (type C) (725-24.03) | EACH | 4 | $14,400 | $11,175 |
| 64 | Preventive maintenance for system (725-24.21) | LS | 1 | $1,850.00 | $25,310 |
| 65 | Unscheduled maintenance labor (725-24.25) | HR | 25 | $155.00 | $110.00 |
| 66 | Spare parts (725-24.31) | LS | 1 | $94,250 | $114,985 |
| 67 | Burn-in period (725-24.41) | LS | 1 | $18,650 | $9,255.00 |
| 68 | Software integration (725-24.52) | LS | 1 | $50,000 | $12,338 |
| 69 | Network integration (725-24.54) | LS | 1 | $52,700 | $12,338 |
| 70 | As-built plans (725-24.55) | LS | 1 | $18,900 | $22,200 |
| 71 | Training (725-24.62) | HR | 12 | $221.00 | $103.00 |
| 72 | Road side unit (rsu) (725-28.01) | EACH | 4 | $12,950 | $9,150.00 |
| 73 | Pedestal pole (type B) (730-23.31) | EACH | 3 | $3,160.00 | $2,170.00 |
| 74 | Temporary sediment tube 12IN (740-11.02) | LF | 300 | $4.30 | $15.70 |
| 75 | Seeding (with mulch) (801-01) | UNIT | 18 | $45.50 | $49.65 |
| 76 | Crown vetch mixture (with mulch) (801-01.02) | UNIT | 6 | $154.00 | $496.00 |
| 77 | Water (seeding & sodding) (801-03) | MG | 3 | $247.00 | $1,840.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.