TDOT contract CNZ162 bid tabulation
The installation of vehicle detection and wrong way prevention technology at five (5) interchanges on i-240 and i-40. Let by Tennessee DOT on May 9, 2025, Shelby County. 3 bids received; low bid $2,904,682 by Shelby Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 09 MAY 2025
- Pay items
- 64
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Shelby Electric Company, Inc. | $2,904,682 | Low |
| 2 | Stansell Electric Company, Inc. | $4,879,518 | +68% |
| 3 | Davis H. Elliot Construction Company, Inc. | $5,466,600 | +88% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelby Electric Company, Inc. | 2. Stansell Electric Company, Inc. | 3. Davis H. Elliot Construction Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Sandbags (209-09.01) | BAG | 156 | $6.60 | $8.00 | $5.00 |
| 2 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 650 | $9.35 | $5.00 | $3.10 |
| 3 | Mineral aggregate, type A base, grading D (303-01) | TON | 2 | $1,100.00 | $750.00 | $30.00 |
| 4 | High-visibility construction fence (707-08.11) | LF | 420 | $4.40 | $3.00 | $2.00 |
| 5 | Traffic control (712-01) | LS | 1 | $44,000 | $133,500 | $450,000 |
| 6 | Flexible drums (channelizing) (712-04.01) | EACH | 180 | $37.40 | $50.00 | $34.00 |
| 7 | Signs (construction) (712-06) | SF | 190 | $8.14 | $11.00 | $7.40 |
| 8 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,595.00 | $2,060.00 | $1,450.00 |
| 9 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 700 | $7.70 | $12.00 | $7.00 |
| 10 | Removal of signs, posts and footings (713-15) | LS | 1 | $9,240.00 | $30,650 | $10,000 |
| 11 | Signs (illuminated DO not enter) (713-16.20) | EACH | 22 | $1,062.70 | $2,005.00 | $5,000.00 |
| 12 | Signs (LED wrong way) (713-16.21) | EACH | 34 | $1,724.97 | $2,940.00 | $4,500.00 |
| 13 | Cable (1/C #1 AWG) (714-06.23) | LF | 1,365 | $7.38 | $3.70 | $3.85 |
| 14 | Steel lighting pole 30FT (714-71.21) | EACH | 13 | $6,738.54 | $10,000 | $10,000 |
| 15 | Mobilization (717-01) | LS | 1 | $94,400 | $490,500 | $273,330 |
| 16 | Wrong way driving detection system (725-16.20) | EACH | 30 | $13,515 | $17,600 | $20,000 |
| 17 | CCTV pole & foundation (80FT pole W/LWRNG dvice) (725-20.02) | EACH | 1 | $79,155 | $86,750 | $85,000 |
| 18 | Maintenance work pad (concrete pad) (725-20.09) | EACH | 13 | $2,006.68 | $953.00 | $1,000.00 |
| 19 | Maintenance work pad (wood platform) (725-20.10) | EACH | 1 | $2,473.22 | $2,415.00 | $7,000.00 |
| 20 | Pull box (type C) (725-20.43) | EACH | 77 | $1,858.94 | $4,540.00 | $5,000.00 |
| 21 | Pull box (type D) (725-20.44) | EACH | 29 | $2,996.07 | $7,840.00 | $8,000.00 |
| 22 | Pull box (type E) (725-20.45) | EACH | 2 | $4,360.27 | $7,115.00 | $10,000 |
| 23 | Cable (1/C #10 AWG.) (725-20.53) | LF | 5,370 | $1.18 | $2.50 | $1.51 |
| 24 | Cable (1/C #8 AWG.) (725-20.54) | LF | 23,450 | $1.77 | $3.40 | $1.76 |
| 25 | Cable (1/C #4 AWG.) (725-20.56) | LF | 5,720 | $3.37 | $6.40 | $2.60 |
| 26 | Cable (1/C #2 AWG.) (725-20.57) | LF | 5,680 | $4.70 | $8.10 | $3.45 |
| 27 | Cable (1/C #2/0 AWG) (725-20.59) | LF | 6,015 | $7.73 | $11.00 | $5.00 |
| 28 | Cable (1/C #3/0 AWG.) (725-20.60) | LF | 5,450 | $9.26 | $14.00 | $6.00 |
| 29 | Cable (1/C #4/0 AWG.) (725-20.61) | LF | 8,890 | $11.20 | $17.00 | $7.21 |
| 30 | Electrical connection (725-20.71) | LS | 1 | $23,600 | $186,000 | $15,000 |
| 31 | CCTV camera system (pan tilt & zoom) (725-20.91) | EACH | 1 | $6,490.00 | $12,050 | $8,000.00 |
| 32 | Dynamic message sign (over-shoulder) (725-21.03) | EACH | 4 | $63,683 | $112,500 | $55,000 |
| 33 | Network switch (type A) (725-21.11) | EACH | 13 | $9,746.80 | $15,250 | $40,000 |
| 34 | Cat 6 cable (725-21.32) | LF | 960 | $2.12 | $1.00 | $1.00 |
| 35 | Demarcation site (overhead power) (725-21.43) | EACH | 4 | $8,891.29 | $7,785.00 | $8,000.00 |
| 36 | Uninterruptible power supply (725-21.85) | EACH | 17 | $6,372.00 | $8,200.00 | $5,000.00 |
| 37 | Conduit bank (type 2) (725-22.22) | LF | 185 | $16.53 | $12.00 | $22.33 |
| 38 | Conduit bank (type 3) (725-22.23) | LF | 3,165 | $16.60 | $18.00 | $22.14 |
| 39 | Conduit bank bored (type 2) (725-22.32) | LF | 60 | $34.51 | $35.50 | $153.91 |
| 40 | Conduit bank bored (type 3) (725-22.33) | LF | 1,450 | $35.77 | $44.00 | $154.25 |
| 41 | 2IN conduit (725-22.71) | LF | 7,165 | $14.30 | $13.00 | $12.30 |
| 42 | 2IN conduit bored (725-22.72) | LF | 995 | $28.65 | $30.00 | $1.81 |
| 43 | 2IN conduit W/bank (725-22.74) | LF | 1,855 | $5.43 | $2.80 | $0.66 |
| 44 | 3IN conduit (725-22.78) | LF | 2,245 | $17.02 | $16.00 | $13.34 |
| 45 | 3IN conduit W/bank (725-22.80) | LF | 1,245 | $7.38 | $7.10 | $1.44 |
| 46 | 3IN conduit bored W/bank (725-22.81) | LF | 505 | $17.55 | $40.00 | $1.96 |
| 47 | ITS cable marker (725-23.01) | EACH | 153 | $145.29 | $66.00 | $250.00 |
| 48 | Fiber optic testing (725-23.02) | LS | 1 | $20,423 | $8,935.00 | $20,000 |
| 49 | Fiber optic drop cable (12 F) (725-23.21) | LF | 14,495 | $1.24 | $4.40 | $4.50 |
| 50 | Fiber optic closure (12 F) (725-23.26) | EACH | 7 | $1,296.97 | $1,965.00 | $5,000.00 |
| 51 | Fiber optic splice fusion (725-23.28) | EACH | 64 | $61.38 | $135.00 | $60.00 |
| 52 | Cabinet (type B) (725-24.02) | EACH | 13 | $10,611 | $6,855.00 | $16,000 |
| 53 | Cabinet (type C) (725-24.03) | EACH | 4 | $11,849 | $14,700 | $21,000 |
| 54 | Preventive maintenance for system (725-24.21) | LS | 1 | $25,960 | $32,800 | $5,000.00 |
| 55 | Unscheduled maintenance labor (725-24.25) | HR | 60 | $192.29 | $480.00 | $75.00 |
| 56 | Spare parts (725-24.31) | LS | 1 | $48,042 | $26,650 | $50,000 |
| 57 | Burn-in period (725-24.41) | LS | 1 | $4,720.00 | $24,200 | $100,000 |
| 58 | Software integration (725-24.52) | LS | 1 | $10,030 | $59,400 | $29,765 |
| 59 | Network integration (725-24.54) | LS | 1 | $10,030 | $153,000 | $200,000 |
| 60 | As-built plans (725-24.55) | LS | 1 | $17,700 | $19,500 | $100,000 |
| 61 | Training (725-24.61) | LS | 1 | $17,700 | $30,150 | $50,000 |
| 62 | Pedestal pole (type B) (730-23.29) | EACH | 56 | $4,019.47 | $4,415.00 | $8,000.00 |
| 63 | Temporary sediment tube 12IN (740-11.02) | LF | 2,100 | $6.05 | $6.40 | $4.50 |
| 64 | Sodding (new sod) (803-01) | SY | 28 | $11.00 | $15.00 | $10.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.