TDOT contract CNZ162 bid tabulation

The installation of vehicle detection and wrong way prevention technology at five (5) interchanges on i-240 and i-40. Let by Tennessee DOT on May 9, 2025, Shelby County. 3 bids received; low bid $2,904,682 by Shelby Electric Company, Inc..

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
64
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Shelby Electric Company, Inc.$2,904,682Low
2Stansell Electric Company, Inc.$4,879,518+68%
3Davis H. Elliot Construction Company, Inc.$5,466,600+88%
TDOT contract CNZ162: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Shelby Electric Company, Inc.2. Stansell Electric Company, Inc.3. Davis H. Elliot Construction Company, Inc.
1Sandbags (209-09.01)BAG156$6.60$8.00$5.00
2Polyethylene sheeting (6 mil. minimum) (209-20.03)SY650$9.35$5.00$3.10
3Mineral aggregate, type A base, grading D (303-01)TON2$1,100.00$750.00$30.00
4High-visibility construction fence (707-08.11)LF420$4.40$3.00$2.00
5Traffic control (712-01)LS1$44,000$133,500$450,000
6Flexible drums (channelizing) (712-04.01)EACH180$37.40$50.00$34.00
7Signs (construction) (712-06)SF190$8.14$11.00$7.40
8Arrow board (type C) (712-08.03)EACH2$1,595.00$2,060.00$1,450.00
9Removable pavement marking (8" barrier line) (712-09.02)LF700$7.70$12.00$7.00
10Removal of signs, posts and footings (713-15)LS1$9,240.00$30,650$10,000
11Signs (illuminated DO not enter) (713-16.20)EACH22$1,062.70$2,005.00$5,000.00
12Signs (LED wrong way) (713-16.21)EACH34$1,724.97$2,940.00$4,500.00
13Cable (1/C #1 AWG) (714-06.23)LF1,365$7.38$3.70$3.85
14Steel lighting pole 30FT (714-71.21)EACH13$6,738.54$10,000$10,000
15Mobilization (717-01)LS1$94,400$490,500$273,330
16Wrong way driving detection system (725-16.20)EACH30$13,515$17,600$20,000
17CCTV pole & foundation (80FT pole W/LWRNG dvice) (725-20.02)EACH1$79,155$86,750$85,000
18Maintenance work pad (concrete pad) (725-20.09)EACH13$2,006.68$953.00$1,000.00
19Maintenance work pad (wood platform) (725-20.10)EACH1$2,473.22$2,415.00$7,000.00
20Pull box (type C) (725-20.43)EACH77$1,858.94$4,540.00$5,000.00
21Pull box (type D) (725-20.44)EACH29$2,996.07$7,840.00$8,000.00
22Pull box (type E) (725-20.45)EACH2$4,360.27$7,115.00$10,000
23Cable (1/C #10 AWG.) (725-20.53)LF5,370$1.18$2.50$1.51
24Cable (1/C #8 AWG.) (725-20.54)LF23,450$1.77$3.40$1.76
25Cable (1/C #4 AWG.) (725-20.56)LF5,720$3.37$6.40$2.60
26Cable (1/C #2 AWG.) (725-20.57)LF5,680$4.70$8.10$3.45
27Cable (1/C #2/0 AWG) (725-20.59)LF6,015$7.73$11.00$5.00
28Cable (1/C #3/0 AWG.) (725-20.60)LF5,450$9.26$14.00$6.00
29Cable (1/C #4/0 AWG.) (725-20.61)LF8,890$11.20$17.00$7.21
30Electrical connection (725-20.71)LS1$23,600$186,000$15,000
31CCTV camera system (pan tilt & zoom) (725-20.91)EACH1$6,490.00$12,050$8,000.00
32Dynamic message sign (over-shoulder) (725-21.03)EACH4$63,683$112,500$55,000
33Network switch (type A) (725-21.11)EACH13$9,746.80$15,250$40,000
34Cat 6 cable (725-21.32)LF960$2.12$1.00$1.00
35Demarcation site (overhead power) (725-21.43)EACH4$8,891.29$7,785.00$8,000.00
36Uninterruptible power supply (725-21.85)EACH17$6,372.00$8,200.00$5,000.00
37Conduit bank (type 2) (725-22.22)LF185$16.53$12.00$22.33
38Conduit bank (type 3) (725-22.23)LF3,165$16.60$18.00$22.14
39Conduit bank bored (type 2) (725-22.32)LF60$34.51$35.50$153.91
40Conduit bank bored (type 3) (725-22.33)LF1,450$35.77$44.00$154.25
412IN conduit (725-22.71)LF7,165$14.30$13.00$12.30
422IN conduit bored (725-22.72)LF995$28.65$30.00$1.81
432IN conduit W/bank (725-22.74)LF1,855$5.43$2.80$0.66
443IN conduit (725-22.78)LF2,245$17.02$16.00$13.34
453IN conduit W/bank (725-22.80)LF1,245$7.38$7.10$1.44
463IN conduit bored W/bank (725-22.81)LF505$17.55$40.00$1.96
47ITS cable marker (725-23.01)EACH153$145.29$66.00$250.00
48Fiber optic testing (725-23.02)LS1$20,423$8,935.00$20,000
49Fiber optic drop cable (12 F) (725-23.21)LF14,495$1.24$4.40$4.50
50Fiber optic closure (12 F) (725-23.26)EACH7$1,296.97$1,965.00$5,000.00
51Fiber optic splice fusion (725-23.28)EACH64$61.38$135.00$60.00
52Cabinet (type B) (725-24.02)EACH13$10,611$6,855.00$16,000
53Cabinet (type C) (725-24.03)EACH4$11,849$14,700$21,000
54Preventive maintenance for system (725-24.21)LS1$25,960$32,800$5,000.00
55Unscheduled maintenance labor (725-24.25)HR60$192.29$480.00$75.00
56Spare parts (725-24.31)LS1$48,042$26,650$50,000
57Burn-in period (725-24.41)LS1$4,720.00$24,200$100,000
58Software integration (725-24.52)LS1$10,030$59,400$29,765
59Network integration (725-24.54)LS1$10,030$153,000$200,000
60As-built plans (725-24.55)LS1$17,700$19,500$100,000
61Training (725-24.61)LS1$17,700$30,150$50,000
62Pedestal pole (type B) (730-23.29)EACH56$4,019.47$4,415.00$8,000.00
63Temporary sediment tube 12IN (740-11.02)LF2,100$6.05$6.40$4.50
64Sodding (new sod) (803-01)SY28$11.00$15.00$10.50
TDOT contract CNZ162: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy