TDOT contract CNZ077 bid tabulation

The interchange lighting on i-40 at the junction of u.s. 70 (s.r. 1) (exit 66, l.m. 0.65). Let by Tennessee DOT on February 7, 2025, Haywood County. 4 bids received; low bid $989,715 by Davis H. Elliot Construction Company, Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
27
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Davis H. Elliot Construction Company, Inc.$989,715Low
2Wade Electric Company, Inc.$1,204,665+22%
3Stansell Electric Company, Inc.$1,292,107+31%
4Shelby Electric Company, Inc.$1,450,933+47%
TDOT contract CNZ077: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Davis H. Elliot Construction Company, Inc.2. Wade Electric Company, Inc.3. Stansell Electric Company, Inc.4. Shelby Electric Company, Inc.
1Temporary silt fence (without backing) (209-08.03)LF9,200$2.00$5.75$2.00$7.00
2High-visibility construction fence (707-08.11)LF810$1.75$4.00$3.00$5.00
3Traffic control (712-01)LS1$10,000$5,000.00$34,950$50,000
4Signs (construction) (712-06)SF688$8.10$7.35$15.00$11.00
5Arrow board (type C) (712-08.03)EACH2$200.00$1,250.00$2,500.00$2,925.00
6Jacked or bored conduit (714-03)LF1,225$10.00$24.00$56.00$28.25
7Direct burial conduit (2" PVC, schedule 40) (714-03.01)LF8,872$6.50$10.00$13.50$12.00
8Pull boxes (type C) (714-05.04)EACH23$2,500.00$1,000.00$1,265.00$1,725.75
9Cable (1/C # 10 AWG) (714-06.03)LF4,225$0.63$1.50$1.50$1.30
10Cable (1/C # 8 AWG) (714-06.04)LF3,630$0.88$1.75$1.90$1.65
11Cable (1/C # 6 AWG) (714-06.05)LF23,986$1.17$2.00$2.30$2.25
12Light standards (40' M.H. with metal foundation) (714-08.09)EACH32$4,900.00$6,369.00$6,665.00$6,033.50
13Light standards (high mast - 80' M.H.) (714-08.10)EACH1$50,900$51,924$40,800$60,000
14Light standards (high mast - 100' M.H.) (714-08.11)EACH2$59,000$54,703$44,000$67,500
15Light standards (high mast - 120' M.H.) (714-08.12)EACH3$71,000$71,665$53,950$82,500
16Foundation for light standards - high mast (80' to 120' M.H.) (714-08.27)EACH6$3,500.00$15,000$19,850$15,288
17Foundation for light standards - roadway (40' M.H.) (714-08.28)EACH32$500.00$2,000.00$1,065.00$2,000.00
18Luminaires (180 watt LED for offset poles) (714-09.09)EACH32$1,500.00$1,355.00$1,315.00$1,130.00
19Luminaires (295 watt LED high mast) (714-09.11)EACH32$2,500.00$1,738.00$1,865.00$2,400.00
20Control center (no. 1) (714-12.01)LS1$11,000$15,000$12,700$21,000
21Control center (no. 2) (714-12.02)LS1$11,000$15,000$12,700$21,000
22Electrical connection (control center no. 1) (714-25.01)LS1$5,000.00$5,000.00$4,690.00$35,000
23Electrical connection (control center no. 2) (714-25.02)LS1$5,000.00$6,500.00$4,835.00$35,000
24Mobilization (717-01)LS1$49,491$54,000$131,000$50,000
25Temporary seeding (with mulch) (801-01.07)UNIT9$37.00$55.00$51.00$65.00
26Water (seeding & sodding) (801-03)MG1$200.00$50.00$276.00$60.00
27Sodding (new sod) (803-01)SY915$7.50$5.50$10.50$6.50
TDOT contract CNZ077: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy