TDOT contract CN264058 bid tabulation
F3-008,crp-9408(14),92svar-f3-001 the traffic signal modernization improvements at various intersections along various u.s. and state routes. Let by Tennessee DOT on October 2, 2026, Counties Benton, Gibson, Obion, And Weakley. 3 bids received; low bid $320,227 by Stansell Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 16
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stansell Electric Company, Inc. | $320,227 | Low |
| 2 | Davis H. Elliot Construction Company, Inc. | $366,146 | +14% |
| 3 | Shelby Electric Company, Inc. | $762,650 | +138% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stansell Electric Company, Inc. | 2. Davis H. Elliot Construction Company, Inc. | 3. Shelby Electric Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Traffic control (712-01) | LS | 1 | $33,600 | $10,000 | $60,000 |
| 2 | Mobilization (717-01) | LS | 1 | $24,050 | $18,307 | $36,250 |
| 3 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 2 | $1,290.00 | $2,150.00 | $1,200.00 |
| 4 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 8 | $1,200.00 | $2,200.00 | $1,150.00 |
| 5 | Signal head assembly (140 A4F with backplate) (730-02.59) | EACH | 3 | $1,475.00 | $2,325.00 | $1,750.00 |
| 6 | Signal cable - 5 conductor (730-08.02) | LF | 340 | $3.30 | $3.77 | $4.00 |
| 7 | Signal cable - 7 conductor (730-08.03) | LF | 1,490 | $3.90 | $4.21 | $6.00 |
| 8 | Vehicle detector (radar - advance) (730-13.13) | EACH | 4 | $9,330.00 | $8,000.00 | $13,000 |
| 9 | Vehicle detector (radar-single unit multi-approach) (730-13.18) | EACH | 1 | $31,950 | $19,129 | $27,500 |
| 10 | Vehicle detector (GPS activated priority control) (730-13.30) | EACH | 44 | $1,900.00 | $2,700.00 | $6,500.00 |
| 11 | Cabinet maintenance (filter) (730-15.16) | EACH | 15 | $100.00 | $250.00 | $500.00 |
| 12 | Modify cabinet (controller programming) (730-15.25) | EACH | 13 | $198.00 | $2,355.00 | $1,500.00 |
| 13 | Modify cabinet (radar installation) (730-15.26) | EACH | 1 | $6,605.00 | $2,355.00 | $10,000 |
| 14 | Modify cabinet (emergency preemption) (730-15.28) | EACH | 12 | $1,560.00 | $2,355.00 | $15,500 |
| 15 | Controller (atc) (730-16.04) | EACH | 7 | $6,225.00 | $7,000.00 | $5,250.00 |
| 16 | Cabinet monitor unit (730-16.51) | EACH | 7 | $1,885.00 | $2,500.00 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.