TDOT contract CN261059 bid tabulation
The interchange lighting on i-26 at s.r. 359 (l.m. 1.66 - l.m. 2.22) and at s.r. 173 (l.m. 3.83 - l.m. 4.44). Let by Tennessee DOT on August 14, 2026, Carter And Unicoi Counties. 3 bids received; low bid $1,690,640 by Davis H. Elliot Construction Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 14 AUG 2026
- Pay items
- 33
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Davis H. Elliot Construction Company, Inc. | $1,690,640 | Low |
| 2 | Progression Electric, LLC | $2,044,746 | +21% |
| 3 | Stansell Electric Company, Inc. | $2,091,709 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Davis H. Elliot Construction Company, Inc. | 2. Progression Electric, LLC | 3. Stansell Electric Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $25,000 | $24,000 | $38,300 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $5,000.00 | $13,250 | $13,500 |
| 3 | Traffic control (712-01) | LS | 1 | $49,000 | $44,460 | $43,800 |
| 4 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $33.00 | $60.00 | $42.00 |
| 5 | Signs (construction) (712-06) | SF | 1,544 | $7.25 | $12.34 | $9.00 |
| 6 | Arrow board (type C) (712-08.03) | EACH | 4 | $950.00 | $2,800.00 | $1,300.00 |
| 7 | Jacked or bored conduit (714-03) | LF | 2,080 | $16.47 | $24.53 | $41.00 |
| 8 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 21,000 | $13.67 | $13.29 | $14.00 |
| 9 | Conduit (structures - 1" RGS) (714-04.01) | LF | 490 | $24.75 | $25.48 | $23.00 |
| 10 | Pull boxes (type C) (714-05.04) | EACH | 71 | $1,500.00 | $897.00 | $1,170.00 |
| 11 | Pull boxes (surface mounted junction box - 6" X 6") (714-05.05) | EACH | 14 | $1,000.00 | $458.00 | $375.00 |
| 12 | Cable (1/C # 8 AWG) (714-06.04) | LF | 63,000 | $1.96 | $1.70 | $1.90 |
| 13 | Cable (1/C # 6 AWG) (714-06.05) | LF | 5,500 | $2.40 | $2.02 | $2.50 |
| 14 | Light standards (45' MH., offset) (714-08.09) | EACH | 40 | $3,200.00 | $5,460.00 | $4,270.00 |
| 15 | Light standards (high mast - 135') (714-08.10) | EACH | 8 | $49,000 | $63,827 | $63,550 |
| 16 | Foundation (only) for light standard (714-08.20) | EACH | 40 | $2,361.97 | $2,194.00 | $1,940.00 |
| 17 | Foundation for light standards - high mast (135') (714-08.27) | EACH | 8 | $9,000.00 | $17,886 | $18,950 |
| 18 | LED luminaires (208 watt, offset) (714-09.47) | EACH | 19 | $950.00 | $1,216.00 | $1,135.00 |
| 19 | LED luminaires (180 watt, offset) (714-09.48) | EACH | 21 | $950.00 | $1,217.00 | $1,135.00 |
| 20 | LED luminaires-high mast (295 watt) (714-09.64) | EACH | 48 | $1,200.00 | $1,288.00 | $1,435.00 |
| 21 | LED luminaires-underpass (35 watt) (714-09.83) | EACH | 6 | $850.00 | $950.00 | $773.00 |
| 22 | Control center (no. 1) (714-12.01) | LS | 1 | $10,000 | $13,783 | $10,700 |
| 23 | Control center (no. 2) (714-12.02) | LS | 1 | $10,000 | $13,783 | $10,700 |
| 24 | Control center (no. 3) (714-12.03) | LS | 1 | $10,000 | $13,783 | $10,700 |
| 25 | Control center (no. 4) (714-12.04) | LS | 1 | $10,000 | $13,783 | $10,700 |
| 26 | Electrical connection (control center no. 1) (714-25.01) | LS | 1 | $3,000.00 | $6,305.82 | $5,385.00 |
| 27 | Electrical connection (control center no. 2) (714-25.02) | LS | 1 | $3,000.00 | $9,845.88 | $10,400 |
| 28 | Electrical connection (control center no. 3) (714-25.03) | LS | 1 | $3,000.00 | $10,445 | $10,850 |
| 29 | Electrical connection (control center no. 4) (714-25.04) | LS | 1 | $3,000.00 | $8,138.66 | $5,540.00 |
| 30 | Mobilization (717-01) | LS | 1 | $84,532 | $145,600 | $195,000 |
| 31 | Temporary sediment tube 8IN (740-11.01) | LF | 20,000 | $3.30 | $2.65 | $2.40 |
| 32 | Seeding (with mulch) (801-01) | UNIT | 200 | $55.00 | $72.00 | $55.00 |
| 33 | Water (seeding & sodding) (801-03) | MG | 20 | $100.00 | $848.00 | $210.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.