TDOT contract CN264060 bid tabulation

The repair of the bridge on s.r. 385 over riverdale road (l.m. 3.57). Let by Tennessee DOT on October 2, 2026, Shelby County. 3 bids received; low bid $480,711 by Thomson & Thomson, Inc..

Owner
Tennessee DOT
Letting
02 OCT 2026
Pay items
17
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Thomson & Thomson, Inc.$480,711Low
2Bluff City Construction Company, LLC$729,972+52%
3Dement Construction Group, LLC$797,282+66%
TDOT contract CN264060: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Thomson & Thomson, Inc.2. Bluff City Construction Company, LLC3. Dement Construction Group, LLC
1Vegetation removal (201-05.31)LS1$12,000$24,477$15,000
2Granular backfill (bridges) (303-01.02)TON185$140.00$171.90$170.00
3Resealing joints (silicone sealant) (502-08.02)LF831$6.75$16.65$50.00
4Bridge end drains(12") (604-04.05)EACH4$6,850.00$28,702$20,000
512" pipe drain (bridge drain) (610-07.01)LF403$42.00$86.00$100.00
6Portland cement concrete ditch paving (703-01)CY18.20$1,190.00$3,611.00$2,500.00
7Traffic control (712-01)LS1$17,000$62,454$187,000
8Portable barrier rail (MASH TL-3) (712-02.10)LF1,270$58.00$60.40$40.00
9Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH2$6,000.00$12,210$6,500.00
10Flexible drums (channelizing) (712-04.01)EACH119$35.00$41.20$35.00
11Barrier rail delineator (712-04.50)EACH40$12.00$10.30$12.00
12Signs (construction) (712-06)SF568$7.00$8.25$7.00
13Queue protection truck (712-08.12)DAY4$1,000.00$927.00$1,000.00
14Removable pavement marking (6" line) (712-09.08)LF17,520$5.85$6.00$5.85
15Removable black-out tape (6") (712-09.30)LF11,580$7.95$8.20$7.95
16Raised PVMT markers (BI-directional) (1 color lens) (716-01.11)EACH228$28.00$28.85$28.00
17Mobilization (717-01)LS1$55,000$60,727$79,124
TDOT contract CN264060: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy