TDOT contract CNZ165 bid tabulation

The emergency guardrail repair at various locations on various interstate and state routes. Let by Tennessee DOT on May 9, 2025, Counties Carter, Cocke, Greene, And Johnson. 4 bids received; low bid $156,510 by Reynolds Fence and Guardrail, Inc..

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
15
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Reynolds Fence and Guardrail, Inc.$156,510Low
2Tennessee Guardrail, Inc.$157,293+1.0%
3R.D. Construction, LLC$214,155+37%
4Superior Traffic Control, LLC$228,189+46%
TDOT contract CNZ165: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Reynolds Fence and Guardrail, Inc.2. Tennessee Guardrail, Inc.3. R.D. Construction, LLC4. Superior Traffic Control, LLC
1Guardrail at bridge ends (705-01.01)LF100$100.00$82.00$97.50$20.00
2Guardrail transition 27IN to 31IN (705-02.10)EACH20$200.00$66.00$105.00$250.00
3Earth pad for type 38 GR end treatment (705-04.09)EACH2$1,500.00$1,075.00$2,500.00$1,800.00
4W beam GR (type 2) MASH TL-3 (705-06.01)LF2,627$26.00$25.50$42.50$42.00
5W beam GR (type 2) MASH TL-3 (long post) (705-06.02)LF369$32.00$30.50$48.00$45.00
6GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH3$1,600.00$1,050.00$1,950.00$3,200.00
7GR terminal (in-inline) MASH TL-3 (705-06.11)EACH3$1,200.00$775.00$1,800.00$2,000.00
8Tangent energy absorbing term MASH TL-3 (705-06.20)EACH6$3,200.00$3,035.00$3,750.00$4,000.00
9Guardrail removed (706-01)LF200$3.00$7.40$1.50$5.00
10Reset single guardrail (type 2) (706-02.21)LF100$10.00$4.40$16.70$18.00
11Radius rail (706-06.03)LF150$35.00$34.50$45.00$35.00
12RE-align guardrail (706-10.54)LF100$10.00$3.00$9.75$10.00
13Traffic control (712-01)LS1$5,500.00$15,000$5,000.00$20,000
14Truck mounted attenuator W/mssage board (712-08.20)DAY7$350.00$900.00$2,000.00$1,000.00
15Mobilization (717-01)LS1$16,000$15,000$5,500.00$15,000
TDOT contract CNZ165: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy