TDOT contract CNZ217 bid tabulation
The ada curb ramp upgrades on various state routes. Let by Tennessee DOT on August 15, 2025, Counties Bedford, Lawrence, Lewis, Marshall, Moore, And Rutherford. 2 bids received; low bid $438,843 by SiteWorx Solutions Co..
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 13
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | SiteWorx Solutions Co. | $438,843 | Low |
| 2 | MarCor Construction, Inc. | $537,281 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. SiteWorx Solutions Co. | 2. MarCor Construction, Inc. |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $16,500 | $1,500.00 |
| 2 | Removal of trash and debris (202-01.03) | LS | 1 | $8,250.00 | $2,500.00 |
| 3 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 243 | $24.20 | $90.00 |
| 4 | Removal of curb and gutter (description) (202-08.15) | LF | 1,725 | $16.50 | $40.00 |
| 5 | Furnishing & spreading topsoil (203-07) | CY | 54 | $110.00 | $112.00 |
| 6 | Concrete sidewalk (4 ") (701-01.01) | SF | 2,181 | $18.15 | $15.00 |
| 7 | Concrete curb ramp (retrofit) (701-02.01) | SF | 7,334 | $24.20 | $40.00 |
| 8 | Detectable warning surface (rehabilitation) (701-02.06) | SF | 189 | $40.70 | $42.00 |
| 9 | Concrete curb (702-01) | CY | 21 | $1,210.00 | $950.00 |
| 10 | Concrete combined curb & gutter (702-03) | CY | 32 | $990.00 | $650.00 |
| 11 | Traffic control (712-01) | LS | 1 | $38,500 | $42,350 |
| 12 | Mobilization (717-01) | LS | 1 | $49,500 | $15,650 |
| 13 | Seeding (with mulch) (801-01) | UNIT | 6 | $660.00 | $600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.