TDOT contract CNZ256 bid tabulation
The miscellaneous safety improvements on various local roads. Let by Tennessee DOT on October 3, 2025, Benton And Chester Counties. 3 bids received; low bid $190,577 by Mountain Home Construction LLC.
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 12
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mountain Home Construction LLC | $190,577 | Low |
| 2 | Superior Traffic Control, LLC | $197,055 | +3.0% |
| 3 | Lu, Inc. | $223,267 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Home Construction LLC | 2. Superior Traffic Control, LLC | 3. Lu, Inc. |
|---|---|---|---|---|---|---|
| 1 | Traffic control (712-01) | LS | 1 | $1,000.00 | $11,000 | $33,741 |
| 2 | Sign post delineation enhancement (713-02.21) | LF | 3,048 | $3.75 | $3.75 | $4.05 |
| 3 | "U" section steel posts (713-11.01) | LB | 11,388 | $3.00 | $3.55 | $3.43 |
| 4 | Perforated/knockout square tube post (713-11.02) | LB | 1,010 | $4.00 | $4.15 | $4.13 |
| 5 | P post slip base (713-11.21) | EACH | 34 | $450.00 | $525.00 | $548.41 |
| 6 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 1,657 | $11.00 | $10.50 | $12.36 |
| 7 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 1,014 | $12.00 | $11.50 | $13.41 |
| 8 | Remove sign, support & footing (713-15.36) | EACH | 4 | $10.00 | $15.00 | $10.00 |
| 9 | Plastic pavement marking (stop line) (716-02.05) | LF | 1,106 | $20.00 | $12.25 | $12.12 |
| 10 | Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01) | LM | 38 | $1,650.00 | $1,565.00 | $1,560.45 |
| 11 | Spray thermo PVMT MRKNG (60 mil) (4IN dotted line) (716-13.04) | LF | 3,469 | $0.40 | $0.87 | $0.86 |
| 12 | Mobilization (717-01) | LS | 1 | $8,000.00 | $7,000.00 | $5,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.