TDOT contract CNZ282 bid tabulation
The miscellaneous safety improvements on various local roads. Let by Tennessee DOT on December 5, 2025, Hickman County. 3 bids received; low bid $235,633 by Lu, Inc..
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 15
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lu, Inc. | $235,633 | Low |
| 2 | Mountain Home Construction LLC | $242,731 | +3.0% |
| 3 | Superior Traffic Control, LLC | $271,922 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lu, Inc. | 2. Mountain Home Construction LLC | 3. Superior Traffic Control, LLC |
|---|---|---|---|---|---|---|
| 1 | Traffic control (712-01) | LS | 1 | $1,850.00 | $7,500.00 | $7,500.00 |
| 2 | Sign post delineation enhancement (713-02.21) | LF | 695 | $2.95 | $3.75 | $6.20 |
| 3 | "U" section steel posts (713-11.01) | LB | 1,616 | $2.67 | $3.00 | $5.95 |
| 4 | Perforated/knockout square tube post (713-11.02) | LB | 4,710 | $3.37 | $3.50 | $5.50 |
| 5 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 183.80 | $9.53 | $10.50 | $15.75 |
| 6 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 1,254 | $9.82 | $11.50 | $16.45 |
| 7 | Remove sign, support & footing (713-15.36) | EACH | 90 | $10.00 | $5.00 | $35.00 |
| 8 | Railroad cross-buck sign & support (713-16.05) | EACH | 6 | $381.88 | $500.00 | $475.00 |
| 9 | Railroad advance warning sign and support (713-16.09) | EACH | 3 | $264.38 | $430.00 | $475.00 |
| 10 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 1,843 | $35.00 | $35.00 | $35.00 |
| 11 | Plastic pavement marking (stop line) (716-02.05) | LF | 190 | $20.00 | $20.00 | $20.00 |
| 12 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 3 | $1,000.00 | $1,000.00 | $1,000.00 |
| 13 | Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01) | LM | 60 | $1,800.00 | $1,800.00 | $1,800.00 |
| 14 | Spray thermo PVMT MRKNG (60 mil) (4IN dotted line) (716-13.04) | LF | 6,340 | $1.00 | $0.93 | $1.00 |
| 15 | Mobilization (717-01) | LS | 1 | $7,850.00 | $5,000.00 | $8,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.