TDOT contract CNZ308 bid tabulation
The miscellaneous safety improvements on various local roads. Let by Tennessee DOT on December 5, 2025, Obion County. 3 bids received; low bid $208,685 by Mountain Home Construction LLC.
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 13
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mountain Home Construction LLC | $208,685 | Low |
| 2 | Lu, Inc. | $237,733 | +14% |
| 3 | Superior Traffic Control, LLC | $260,309 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Home Construction LLC | 2. Lu, Inc. | 3. Superior Traffic Control, LLC |
|---|---|---|---|---|---|---|
| 1 | Traffic control (712-01) | LS | 1 | $7,500.00 | $4,920.00 | $13,500 |
| 2 | Sign post delineation enhancement (713-02.21) | LF | 2,010 | $3.75 | $3.09 | $5.50 |
| 3 | "U" section steel posts (713-11.01) | LB | 9,268 | $3.00 | $2.76 | $3.90 |
| 4 | Perforated/knockout square tube post (713-11.02) | LB | 2,483 | $3.50 | $3.45 | $4.00 |
| 5 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 1,118 | $10.50 | $9.58 | $12.85 |
| 6 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 620 | $11.50 | $9.87 | $13.50 |
| 7 | Remove sign, support & footing (713-15.36) | EACH | 25 | $5.00 | $10.00 | $10.00 |
| 8 | Railroad advance warning sign and support (713-16.09) | EACH | 6 | $430.00 | $261.00 | $300.00 |
| 9 | Plastic pavement marking (stop line) (716-02.05) | LF | 388 | $20.00 | $24.00 | $24.00 |
| 10 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 6 | $1,000.00 | $1,100.00 | $1,100.00 |
| 11 | Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01) | LM | 63 | $1,800.00 | $2,200.00 | $2,200.00 |
| 12 | Spray thermo PVMT MRKNG (60 mil) (4IN dotted line) (716-13.04) | LF | 1,919 | $1.00 | $1.50 | $1.50 |
| 13 | Mobilization (717-01) | LS | 1 | $6,500.00 | $16,420 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.