TxDOT contract A00184368 bid tabulation
Traffic Signal Improvements, E COLLINS BLVD (Campbell Road to Alma Road). Let by Texas DOT on August 5, 2026, Dallas, Dallas District. 9 bids received; low bid $2,618,604 by WG Engineering & Construction, LLC, -6.7% against the engineer's estimate of $2,806,538.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 113
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | WG Engineering & Construction, LLC | $2,618,604 | Low | -7.0% |
| 2 | Durable Specialties, Inc. | $2,668,241 | +2.0% | -5.0% |
| 3 | Yunex LLC | $2,681,317 | +2.0% | -4.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $2,687,030 | +3.0% | -4.0% |
| 5 | Ed Bell Construction Company | $2,712,000 | +4.0% | -3.0% |
| 6 | Gibson & Associates, Inc. | $2,777,754 | +6.0% | -1.0% |
| 7 | O. Trevino Construction, LLC | $2,894,332 | +11% | +3.0% |
| 8 | Icos Management, LLC | $2,971,782 | +13% | +6.0% |
| 9 | Select Maintenance, L.L.C. | $3,283,143 | +25% | +17% |
Engineer's estimate: $2,806,538.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. WG Engineering & Construction, LLC | 2. Durable Specialties, Inc. | 3. Yunex LLC | 4. Highway Intelligent Traffic Solutions, Inc. | 5. Ed Bell Construction Company | 6. Gibson & Associates, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 2,590 | $45.00 | $32.00 | $28.00 | $30.00 | $24.78 | $25.50 | $29.70 |
| 2 | Removing concrete (medians) (104-7008) | SY | 415 | $45.00 | $44.00 | $39.00 | $42.23 | $27.14 | $25.00 | $41.80 |
| 3 | Removing concrete (pavers) (104-7010) | SY | 123 | $40.00 | $48.00 | $42.00 | $44.45 | $41.30 | $35.00 | $44.00 |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 2,088 | $45.00 | $33.00 | $29.00 | $31.12 | $43.07 | $22.00 | $30.80 |
| 5 | Concrete pavement (CRCP) (8") (360-7002) | SY | 1,375 | $80.00 | $180.00 | $155.00 | $164.45 | $123.90 | $175.00 | $170.20 |
| 6 | Full - depth repair CPCD (8") (361-7019) | CY | 14 | $1,500.00 | $285.00 | $262.00 | $277.78 | $973.50 | $2,600.00 | $500.00 |
| 7 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 8 | $300.00 | $285.00 | $760.00 | $440.07 | $243.15 | $272.50 | $294.16 |
| 8 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 39 | $450.00 | $525.00 | $790.00 | $481.60 | $301.48 | $414.20 | $338.81 |
| 9 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 22 | $625.00 | $898.00 | $980.00 | $865.85 | $398.39 | $517.75 | $603.82 |
| 10 | Bridge sidewalk (422-7012) | SF | 8,073 | $40.00 | $15.00 | $13.00 | $13.73 | $31.86 | $24.00 | $14.20 |
| 11 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 152 | $30.00 | $130.00 | $115.00 | $122.23 | $61.36 | $43.60 | $40.00 |
| 12 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 552 | $30.00 | $35.00 | $32.00 | $33.73 | $56.64 | $35.00 | $30.00 |
| 13 | Rail (handrail)(type F) (450-7063) | LF | 1,984 | $140.00 | $165.00 | $162.00 | $171.12 | $149.54 | $150.00 | $153.00 |
| 14 | RC pipe (CL III)(24 in) (464-7005) | LF | 12 | $210.00 | $165.00 | $168.00 | $177.78 | $401.20 | $375.00 | $176.00 |
| 15 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 3 | $8,000.00 | $11,252 | $11,340 | $12,000 | $13,570 | $9,775.00 | $11,880 |
| 16 | Removing structure (inlet) (496-7002) | EACH | 3 | $1,150.00 | $895.00 | $840.00 | $888.89 | $3,038.50 | $480.00 | $880.00 |
| 17 | Mobilization (500-7001) | LS | 1 | $225,000 | $239,800 | $115,000 | $300,093 | $242,053 | $224,379 | $388,000 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $13,000 | $6,225.00 | $18,500 | $15,023 | $7,106.26 | $15,000 | $14,200 |
| 19 | Portable changeable message sign (503-7001) | DAY | 40 | $100.00 | $252.00 | $68.00 | $62.00 | $54.49 | $150.00 | $120.00 |
| 20 | TMA (stationary) (505-7001) | DAY | 120 | $200.00 | $300.00 | $367.00 | $213.00 | $240.48 | $200.00 | $325.00 |
| 21 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 60 | $3.00 | $5.00 | $2.00 | $8.00 | $12.35 | $7.00 | $15.00 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 60 | $1.00 | $3.00 | $1.00 | $2.45 | $5.27 | $4.00 | $10.00 |
| 23 | Concrete curb & gutter (type II) (529-7009) | LF | 4,360 | $75.00 | $35.00 | $34.00 | $36.67 | $40.92 | $72.00 | $37.95 |
| 24 | Concrete sidewalks (4") (531-7001) | SY | 2,321 | $60.00 | $75.00 | $77.00 | $81.12 | $97.53 | $103.00 | $83.95 |
| 25 | Curb ramps (type 1) (531-7005) | EACH | 11 | $3,000.00 | $2,568.00 | $2,205.00 | $2,334.00 | $4,059.20 | $2,600.00 | $2,415.00 |
| 26 | Curb ramps (type 2) (531-7006) | EACH | 1 | $3,750.00 | $2,800.00 | $2,520.00 | $2,667.00 | $4,661.00 | $2,600.00 | $2,760.00 |
| 27 | Curb ramps (type 5) (531-7008) | EACH | 3 | $4,000.00 | $4,500.00 | $3,990.00 | $4,223.00 | $5,221.50 | $2,600.00 | $4,370.00 |
| 28 | Curb ramps (type 7) (531-7010) | EACH | 8 | $3,800.00 | $2,500.00 | $2,205.00 | $2,334.00 | $4,218.50 | $2,600.00 | $2,415.00 |
| 29 | Curb ramps (type 22) (531-7014) | EACH | 1 | $4,500.00 | $5,500.00 | $5,040.00 | $5,334.00 | $7,670.00 | $2,600.00 | $5,520.00 |
| 30 | Concrete median (536-7002) | SY | 890 | $100.00 | $230.00 | $200.00 | $211.12 | $155.76 | $128.00 | $218.50 |
| 31 | Concrete directional island (536-7003) | LF | 3,605 | $75.00 | $30.00 | $27.00 | $28.89 | $45.43 | $43.00 | $29.90 |
| 32 | Remove metal beam guard fence (542-7001) | LF | 1,925 | $4.00 | $3.50 | $15.00 | $2.23 | $6.45 | $2.50 | $2.20 |
| 33 | Relocate RD IL asm (shoe-base) (610-7002) | EACH | 1 | $1,900.00 | $2,391.00 | $3,000.00 | $1,956.00 | $1,596.74 | $3,509.80 | $2,067.59 |
| 34 | Remove RD IL asm (shoe-base) (610-7007) | EACH | 1 | $750.00 | $1,238.00 | $750.00 | $978.00 | $670.44 | $430.55 | $209.60 |
| 35 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 1,775 | $16.00 | $23.00 | $32.00 | $26.85 | $19.60 | $16.35 | $23.75 |
| 36 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 455 | $35.00 | $28.00 | $68.00 | $47.45 | $37.29 | $38.15 | $33.89 |
| 37 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 195 | $20.00 | $26.00 | $34.00 | $33.00 | $24.13 | $21.80 | $26.48 |
| 38 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 900 | $35.00 | $32.00 | $70.00 | $44.97 | $42.79 | $32.70 | $36.62 |
| 39 | Electrical conductor (no.10) insulated (620-7006) | LF | 1,230 | $1.50 | $2.35 | $3.00 | $1.96 | $1.97 | $1.42 | $3.23 |
| 40 | Electrical conductor (no.8) bare (620-7007) | LF | 1,775 | $2.00 | $2.45 | $4.00 | $2.08 | $2.10 | $1.74 | $3.46 |
| 41 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,210 | $2.00 | $2.65 | $4.00 | $2.33 | $2.37 | $1.91 | $3.91 |
| 42 | Electrical conductor (no.6) bare (620-7009) | LF | 1,405 | $2.50 | $2.75 | $5.00 | $2.45 | $2.51 | $2.13 | $4.14 |
| 43 | Electrical conductor (no.6) insulated (620-7010) | LF | 2,210 | $2.50 | $3.05 | $5.00 | $2.82 | $2.91 | $2.40 | $4.81 |
| 44 | Ground box type A (122311) (624-7001) | EACH | 3 | $1,250.00 | $1,200.00 | $1,900.00 | $1,050.00 | $1,068.74 | $921.05 | $1,353.85 |
| 45 | Ground box type A (122311)W/apron (624-7002) | EACH | 1 | $1,600.00 | $1,570.00 | $2,600.00 | $2,262.00 | $1,342.38 | $1,051.85 | $1,913.03 |
| 46 | Ground box type B (122322) (624-7003) | EACH | 1 | $1,000.00 | $1,858.00 | $2,000.00 | $1,312.00 | $1,346.04 | $986.45 | $1,451.02 |
| 47 | Ground box type B (122322)W/apron (624-7004) | EACH | 8 | $1,100.00 | $2,235.00 | $2,700.00 | $2,523.00 | $1,631.48 | $1,117.25 | $1,807.51 |
| 48 | Ground box type D (162922) (624-7007) | EACH | 1 | $1,400.00 | $1,985.00 | $2,100.00 | $1,106.00 | $1,127.74 | $1,199.00 | $1,434.82 |
| 49 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $1,700.00 | $2,450.00 | $2,800.00 | $2,806.00 | $1,401.38 | $1,308.00 | $1,994.05 |
| 50 | Remove ground box (624-7013) | EACH | 2 | $350.00 | $350.00 | $50.00 | $489.00 | $756.04 | $267.05 | $405.49 |
| 51 | Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190) | EACH | 2 | $9,000.00 | $8,298.00 | $14,000 | $9,470.00 | $9,418.39 | $7,957.00 | $15,646 |
| 52 | Aluminum signs (type A) (636-7001) | SF | 122.75 | $38.00 | $44.00 | $80.00 | $51.58 | $80.75 | $38.53 | $38.89 |
| 53 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 21 | $900.00 | $765.00 | $1,150.00 | $685.00 | $837.97 | $686.70 | $693.00 |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 2 | $850.00 | $1,200.00 | $1,150.00 | $948.00 | $841.40 | $1,019.15 | $1,028.50 |
| 55 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $900.00 | $950.00 | $1,150.00 | $761.00 | $839.29 | $790.25 | $797.50 |
| 56 | Remove SM RD SN sup&AM (644-7073) | EACH | 24 | $150.00 | $120.00 | $250.00 | $153.00 | $222.32 | $86.11 | $86.90 |
| 57 | Install object marker assembly (OM-2Z)(WFLX)SRFLL (658-7256) | EACH | 13 | $1,000.00 | $182.00 | $10.00 | $77.00 | $86.38 | $75.21 | $75.90 |
| 58 | Reflectorized pavement marking type II (W) 4" (solid) (666-7171) | LF | 8,250 | $0.75 | $1.10 | $0.50 | $0.39 | $0.41 | $0.38 | $0.39 |
| 59 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 739 | $0.75 | $1.60 | $1.00 | $0.84 | $0.89 | $0.82 | $0.83 |
| 60 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 355 | $0.50 | $1.60 | $1.00 | $0.75 | $0.79 | $0.73 | $0.74 |
| 61 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 788 | $1.00 | $2.00 | $2.00 | $0.89 | $0.94 | $0.87 | $0.88 |
| 62 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 1,872 | $5.00 | $12.00 | $10.00 | $3.84 | $4.01 | $3.76 | $3.80 |
| 63 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 18 | $100.00 | $250.00 | $195.00 | $127.78 | $135.70 | $125.35 | $126.50 |
| 64 | Reflectorized pavement marking type II (W) (double arrow) (666-7187) | EACH | 3 | $200.00 | $450.00 | $346.00 | $155.56 | $165.20 | $152.60 | $154.00 |
| 65 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 14 | $125.00 | $250.00 | $200.00 | $138.89 | $147.50 | $136.25 | $137.50 |
| 66 | Reflectorized pavement marking type II (W) (bike arrow) (666-7203) | EACH | 4 | $85.00 | $130.00 | $105.00 | $105.56 | $112.10 | $103.55 | $104.50 |
| 67 | Reflectorized pavement marking type II (W) (bike symbol) (666-7205) | EACH | 30 | $85.00 | $370.00 | $287.00 | $144.45 | $153.40 | $141.70 | $143.00 |
| 68 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 432 | $6.00 | $5.50 | $4.00 | $5.00 | $5.31 | $4.91 | $4.95 |
| 69 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,071 | $6.00 | $5.50 | $4.00 | $5.00 | $5.31 | $4.91 | $4.95 |
| 70 | Traffic button type W (672-7007) | EACH | 1,143 | $4.00 | $5.35 | $4.00 | $4.17 | $4.43 | $4.09 | $4.13 |
| 71 | Traffic button type Y (672-7008) | EACH | 649 | $4.00 | $5.35 | $4.00 | $4.17 | $4.43 | $4.09 | $4.13 |
| 72 | Eliminating existing PM & markers (4") (677-7001) | LF | 630 | $0.70 | $1.00 | $1.00 | $1.12 | $1.18 | $1.09 | $1.10 |
| 73 | Eliminating existing PM & markers (8") (677-7004) | LF | 238 | $1.00 | $2.00 | $0.20 | $2.23 | $2.36 | $2.18 | $2.20 |
| 74 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,546 | $2.00 | $5.50 | $4.00 | $3.34 | $3.54 | $3.27 | $3.30 |
| 75 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 14 | $60.00 | $61.00 | $47.00 | $33.34 | $35.40 | $32.70 | $33.00 |
| 76 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 2 | $60.00 | $61.00 | $47.00 | $27.78 | $29.50 | $27.25 | $27.50 |
| 77 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 5 | $60.00 | $61.00 | $47.00 | $44.45 | $47.20 | $43.60 | $44.00 |
| 78 | Pavement surface preparation for marking (4") (678-7001) | LF | 8,250 | $0.50 | $0.15 | $0.10 | $0.28 | $0.30 | $0.27 | $0.28 |
| 79 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,094 | $0.01 | $0.15 | $0.10 | $0.28 | $0.30 | $0.27 | $0.28 |
| 80 | Pavement surface preparation for marking (8") (678-7004) | LF | 788 | $0.02 | $0.35 | $0.10 | $0.56 | $0.59 | $0.55 | $0.55 |
| 81 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,872 | $0.80 | $1.00 | $1.00 | $1.12 | $1.18 | $1.09 | $1.10 |
| 82 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 18 | $15.00 | $15.00 | $11.00 | $55.56 | $59.00 | $54.50 | $55.00 |
| 83 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 3 | $20.00 | $30.00 | $21.00 | $72.23 | $76.70 | $70.85 | $71.50 |
| 84 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 4 | $35.00 | $20.00 | $11.00 | $66.67 | $70.80 | $65.40 | $66.00 |
| 85 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 30 | $25.00 | $35.00 | $26.00 | $83.34 | $88.50 | $81.75 | $82.50 |
| 86 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 3,295 | $0.25 | $0.20 | $0.10 | $1.12 | $1.18 | $1.09 | $1.10 |
| 87 | Removing traffic signals (680-7004) | EACH | 1 | $10,000 | $9,858.00 | $7,000.00 | $21,200 | $7,244.73 | $7,521.00 | $5,030.47 |
| 88 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 1 | $30,000 | $26,700 | $30,000 | $29,298 | $14,355 | $29,539 | $19,056 |
| 89 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 9 | $325.00 | $398.00 | $950.00 | $317.00 | $347.75 | $332.45 | $449.76 |
| 90 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $325.00 | $398.00 | $950.00 | $317.00 | $347.75 | $332.45 | $470.82 |
| 91 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 9 | $325.00 | $398.00 | $950.00 | $317.00 | $347.75 | $332.45 | $454.62 |
| 92 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 8 | $325.00 | $398.00 | $950.00 | $317.00 | $340.67 | $332.45 | $461.10 |
| 93 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 9 | $325.00 | $398.00 | $950.00 | $317.00 | $340.67 | $332.45 | $449.76 |
| 94 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 8 | $325.00 | $398.00 | $950.00 | $317.00 | $340.67 | $332.45 | $461.10 |
| 95 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $850.00 | $785.00 | $1,600.00 | $600.00 | $780.95 | $719.40 | $1,052.63 |
| 96 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 9 | $225.00 | $240.00 | $205.00 | $312.00 | $195.62 | $179.85 | $286.25 |
| 97 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 4 | $250.00 | $398.00 | $230.00 | $428.00 | $278.59 | $267.05 | $401.26 |
| 98 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 135 | $3.00 | $3.50 | $3.00 | $3.37 | $2.87 | $2.51 | $3.94 |
| 99 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 695 | $3.00 | $4.00 | $3.00 | $4.53 | $4.17 | $3.76 | $6.08 |
| 100 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 575 | $7.00 | $6.50 | $7.00 | $7.52 | $7.48 | $7.41 | $11.64 |
| 101 | Traffic signal CBL (type A)(18 AWG)(4 conductor) (684-7055) | LF | 680 | $4.00 | $3.00 | $3.00 | $3.06 | $2.54 | $2.23 | $3.36 |
| 102 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,820 | $2.50 | $3.25 | $3.00 | $3.24 | $2.74 | $2.23 | $3.71 |
| 103 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 3 | $18,000 | $17,098 | $22,000 | $19,502 | $19,185 | $20,710 | $21,106 |
| 104 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $38,000 | $31,430 | $42,000 | $36,702 | $38,043 | $39,894 | $46,182 |
| 105 | Pedestrian pole assembly (687-7001) | EACH | 4 | $3,000.00 | $3,354.00 | $5,500.00 | $2,812.00 | $3,375.46 | $2,725.00 | $2,749.98 |
| 106 | Pedestrian push button pole (687-7002) | EACH | 3 | $2,500.00 | $3,400.00 | $4,600.00 | $2,943.00 | $3,275.16 | $2,725.00 | $2,494.03 |
| 107 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,100.00 | $1,652.00 | $1,050.00 | $864.00 | $1,025.29 | $1,046.40 | $1,424.11 |
| 108 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,000.00 | $4,125.00 | $6,000.00 | $3,862.00 | $4,712.27 | $4,796.00 | $4,961.06 |
| 109 | VIVDS prosr sys (install only) (6006-7009) | EACH | 1 | $1,500.00 | $1,200.00 | $1,000.00 | $489.00 | $719.02 | $561.35 | $1,257.59 |
| 110 | VIVDS cam assy (install only) (6006-7010) | EACH | 2 | $1,300.00 | $1,000.00 | $1,800.00 | $367.00 | $1,198.36 | $822.95 | $314.41 |
| 111 | VIVDS cabling (install only) (6006-7012) | LF | 430 | $3.25 | $3.00 | $2.00 | $3.06 | $4.58 | $1.20 | $2.10 |
| 112 | RVDS (pres and adv)(install only) (6008-7006) | EACH | 4 | $1,500.00 | $1,500.00 | $1,800.00 | $1,272.00 | $1,438.04 | $904.70 | $419.21 |
| 113 | RRFB (one-way hardwired) (6108-7001) | EACH | 8 | $7,000.00 | $10,228 | $14,000 | $10,239 | $6,988.67 | $7,630.00 | $13,612 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.