TxDOT contract A00186856 bid tabulation
Hazard Elimination & Safety, IH 610 (Evergreen Street to Fournace Place). Let by Texas DOT on January 7, 2025, Harris, Houston District. 9 bids received; low bid $152,861 by The Rolling Group LLC, -0.1% against the engineer's estimate of $152,975.
- Owner
- Texas DOT
- Letting
- 07 JAN 2025
- Pay items
- 13
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Rolling Group LLC | $152,861 | Low | 0.0% |
| 2 | USA Amtech, Inc. | $157,787 | +3.0% | +3.0% |
| 3 | Third Coast Services LLC | $199,256 | +30% | +30% |
| 4 | Florida Traffic Control Devices, Inc. | $318,500 | +108% | +108% |
| 5 | Traf-Tex, Inc. | $321,432 | +110% | +110% |
| 6 | Sice, Inc. | $322,800 | +111% | +111% |
| 7 | Creacom, Inc. | $323,794 | +112% | +112% |
| 8 | Allstate Signal & Construction, LLC | $359,818 | +135% | +135% |
| 9 | Road Solutions L.L.C. | $394,459 | +158% | +158% |
Engineer's estimate: $152,975.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Rolling Group LLC | 2. USA Amtech, Inc. | 3. Third Coast Services LLC | 4. Florida Traffic Control Devices, Inc. | 5. Traf-Tex, Inc. | 6. Sice, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $13,558 | $10,000 | $223.00 | $19,926 | $31,000 | $71,933 | $34,931 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $1,920.00 | $5,000.00 | $1,875.00 | $3,223.11 | $9,170.00 | $3,202.00 | $8,910.96 |
| 3 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 555 | $16.78 | $22.00 | $12.86 | $9.45 | $17.15 | $65.00 | $27.26 |
| 4 | Conduit (PVC) (schedule 80) (2") (concrete encse) (618-7057) | LF | 4,840 | $9.35 | $7.88 | $10.86 | $16.00 | $36.80 | $26.15 | $28.84 |
| 5 | Electrical conductor (no.14) insulated (620-7002) | LF | 5,380 | $1.10 | $3.08 | $1.25 | $0.73 | $1.00 | $0.90 | $1.12 |
| 6 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 11 | $4,518.00 | $333.00 | $4,150.00 | $4,797.69 | $4,282.00 | $4,758.00 | $5,621.45 |
| 7 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 310 | $3.33 | $3.15 | $1.48 | $1.70 | $4.31 | $4.15 | |
| 8 | Fiber optic CBL (single-mode)(36 fiber) (6027-7002) | LF | 5,095 | $2.09 | $3.96 | $1.86 | $2.05 | $2.00 | $4.17 | |
| 9 | FO splice enclosure (type 2) (6027-7003) | EACH | 3 | $700.00 | $2,017.50 | $2,168.60 | $2,175.00 | $1,509.00 | $1,523.58 | |
| 10 | Fiber optic fusion splice (6027-7004) | EACH | 24 | $1,333.00 | $144.96 | $206.06 | $62.00 | $40.21 | $212.29 | |
| 11 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 3 | $777.00 | $2,481.00 | $1,754.26 | $1,835.00 | $724.00 | $2,675.65 | |
| 12 | Fiber optic CBL (single-mode)(6 fiber) (6027-7011) | LF | 540 | $4.35 | $18.89 | $2.10 | $2.16 | $2.20 | $4.20 | $4.05 |
| 13 | Fiber optic patch panel (6 position) (6027-7012) | EACH | 2 | $1,178.00 | $2,000.33 | $1,239.00 | $2,840.97 | $1,685.00 | $908.00 | $2,538.48 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.