TxDOT contract A00187783 bid tabulation

Rehabilitate Existing Roadway, SH 289 (SL 12 to IH 635). Let by Texas DOT on July 2, 2026, Dallas, Dallas District. 6 bids received; low bid $5,963,495 by Foutsco Paving Company, LLC, +6.2% against the engineer's estimate of $5,613,895.

Owner
Texas DOT
Letting
02 JUL 2026
Pay items
56
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Foutsco Paving Company, LLC$5,963,495Low+6.0%
2Jagoe-Public Company$6,417,486+8.0%+14%
3Austin Bridge & Road Services, LP$6,522,985+9.0%+16%
4Texas Materials Group, Inc.$6,557,916+10%+17%
5Peachtree Construction, LTD.$6,673,852+12%+19%
6O. Trevino Construction, LLC$6,972,856+17%+24%
TxDOT contract A00187783: bids by rank

Engineer's estimate: $5,613,895.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Foutsco Paving Company, LLC2. Jagoe-Public Company3. Austin Bridge & Road Services, LP4. Texas Materials Group, Inc.5. Peachtree Construction, LTD.6. O. Trevino Construction, LLC
1Removing concrete (curb) (104-7016)LF1,400$11.00$10.00$19.00$7.00$12.00$12.50$25.00
2Block sodding (162-7002)SY1,575$3.50$4.75$5.50$9.50$7.00$6.00$6.20
3Vegetative watering (168-7001)TGL238$5.75$1.00$50.00$1.00$0.10$90.00$58.30
4Tom-C PG76-22 sac-A (347-7001)TON9,476$200.00$190.00$200.00$186.27$205.20$186.00$197.15
5Tack coat (347-7011)GAL28,465$2.75$0.10$1.00$0.01$3.80$2.30$2.65
6Planing asphalt concrete pavement(0" to 2.25") (354-7075)SY164,295$2.00$1.00$3.50$4.33$3.49$3.80$4.16
7Full-depth repair CPCD (8") (361-7059)SY4,675$180.00$200.00$260.00$243.00$238.00$250.00$280.00
8Adjusting inlets (479-7002)EACH88$3,000.00$9,790.00$1,900.00$6,678.50$8,130.00$8,500.00$7,500.00
9Mobilization (500-7001)LS1$400,000$540,000$711,000$717,528$648,503$450,000$703,000
10Barricades, signs and traffic handling (502-7001)MO11$30,000$37,700$40,000$31,322$4,950.00$40,000$15,000
11Portable changeable message sign (503-7002)EACH2$25,000$5,000.00$30,000$8,580.00$5,953.75$15,000$15,000
12TMA (stationary) (505-7001)DAY175$250.00$1.00$50.00$1.00$445.00$175.00$180.00
13TMA (mobile operation) (505-7003)DAY48$300.00$1.00$50.00$1.00$0.10$400.00$500.00
14Biodegradable erosion control logs (install) (18") (506-7045)LF2,080$7.00$6.25$27.00$6.25$7.75$6.50$6.68
15Biodegradable erosion control logs (remove) (506-7046)LF2,080$1.00$1.25$2.25$1.25$1.50$3.10$3.07
16Concrete curb (type II) (529-7002)LF1,400$25.00$18.00$45.00$20.00$29.00$30.50$41.78
17Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH12,400$1.50$0.10$2.50$0.50$0.50$2.50$2.65
18Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH30$1.00$5.00$5.00$0.50$0.50$2.50$2.65
19Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008)LF236$1.20$0.65$1.25$0.65$0.65$0.78$0.69
20Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF90$1.20$0.65$1.75$0.65$0.65$0.78$0.69
21Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF1,895$1.00$0.80$0.90$0.80$0.80$0.96$0.85
22Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF9,130$1.00$0.80$1.00$0.80$0.80$0.96$0.85
23Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF120$3.00$4.25$4.00$4.25$4.25$5.10$4.50
24Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF463$6.00$6.50$7.00$6.50$6.50$7.80$6.89
25Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF3,348$6.00$6.50$7.00$6.50$6.50$7.80$6.89
26Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041)EACH15$150.00$140.00$140.00$140.00$140.00$165.00$148.39
27Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH44$150.00$140.00$140.00$140.00$140.00$165.00$148.39
28Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065)EACH14$175.00$150.00$170.00$150.00$150.00$180.00$158.99
29Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH42$175.00$150.00$170.00$150.00$150.00$180.00$158.99
30Ref pavement marking type I(W)18"(yld tri)(090MIL) (666-7086)EACH14$45.00$65.00$60.00$65.00$65.00$78.00$68.89
31Reflectorized pavement marking type I (Y)8"(solid)(090MIL) (666-7113)LF150$0.75$0.80$1.00$0.80$0.80$0.96$0.85
32Reflectorized pavement marking type I (Y)24"(solid)(090MIL) (666-7122)LF55$5.50$6.10$7.00$6.10$6.10$7.00$6.47
33Pavement sler 6" (666-7347)LF6,482$0.20$0.15$0.18$0.15$0.15$0.18$0.16
34Pavement sler 8" (666-7348)LF2,045$0.25$0.20$0.30$0.20$0.20$0.24$0.21
35Pavement sler 24" (666-7352)LF463$1.00$2.00$1.50$2.00$2.00$2.40$2.12
36Pavement sler (arrow) (666-7353)EACH15$25.00$40.00$28.00$40.00$40.00$48.00$42.40
37Pavement sler (word) (666-7354)EACH14$25.00$50.00$33.00$50.00$50.00$60.00$53.00
38Pavement sler (yld tri) (666-7365)EACH14$15.00$10.00$12.00$10.00$10.00$12.00$10.60
39Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF855$1.10$0.50$0.70$0.50$0.50$0.60$0.53
40Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF22,205$0.90$0.55$0.70$0.55$0.55$0.67$0.58
41Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF1,705$1.00$0.45$0.60$0.45$0.45$0.55$0.48
42Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF44,410$0.75$0.51$0.60$0.51$0.51$0.62$0.54
43Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF1,780$1.00$0.45$0.60$0.45$0.45$0.55$0.48
44Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF44,410$0.75$0.51$0.60$0.51$0.51$0.62$0.54
45Prefabricated PM type C (W)(bike symbol) (668-7115)EACH6$200.00$175.00$250.00$175.00$175.00$210.00$185.49
46Prefabricated PM type C (W)(bike word) (668-7116)EACH12$190.00$215.00$100.00$215.00$215.00$260.00$227.88
47Reflectorized pavement marker type II-A-A (672-7004)EACH20$5.00$3.50$4.25$3.50$3.50$4.25$3.71
48Reflectorized pavement marker type II-C-R (672-7006)EACH790$4.50$3.50$4.25$3.50$3.50$4.25$3.71
49Eliminating existing PM & markers (6") (677-7002)LF2,098$0.50$0.50$0.40$0.50$0.50$0.60$0.53
50Eliminating existing PM & markers (8") (677-7004)LF290$4.00$1.00$0.70$1.00$1.00$1.20$1.06
51Eliminating existing PM & markers (12") (677-7006)LF2,376$0.80$1.50$1.75$1.50$1.50$1.80$1.59
52Eliminating existing PM & markers (24") (677-7008)LF195$2.50$2.00$3.00$2.00$2.00$2.40$2.12
53Eliminating existing PM & markers (arrow) (677-7009)EACH2$50.00$30.00$41.00$30.00$30.00$36.00$31.80
54Eliminating existing PM & markers (word) (677-7015)EACH1$55.00$40.00$47.00$40.00$40.00$48.00$42.40
55Fiber reinforced polymer patching materials (721-7001)LB10,000$10.00$8.00$3.00$5.25$4.85$3.30$3.50
56Cam PG76-22 sac-B (3000-7001)TON5,206$195.00$185.00$180.00$189.83$200.00$193.25$208.01
TxDOT contract A00187783: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy