Austin Bridge & Road Services, LP: TxDOT bid record
Austin Bridge & Road Services, LP submitted 196 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 41 of them (21%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $2,008,462,241
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 26 | 6 | 23% |
| 2021 | 45 | 8 | 18% |
| 2022 | 24 | 7 | 29% |
| 2023 | 18 | 7 | 39% |
| 2024 | 12 | 4 | 33% |
| 2025 | 33 | 4 | 12% |
| 2026 | 38 | 5 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 73 | 22 | 30% |
| Fort Worth District | 47 | 9 | 19% |
| San Antonio District | 38 | 5 | 13% |
| Wichita Falls District | 17 | 1 | 6% |
| Paris District | 12 | 1 | 8% |
| Austin District | 3 | 2 | 67% |
| Tyler District | 2 | 1 | 50% |
| Yoakum District | 1 | 0 | 0% |
| San Angelo District | 1 | 0 | 0% |
| Lubbock District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Texas Materials Group, Inc. | 104 | 46 of 104 |
| Jagoe-Public Company | 72 | 48 of 72 |
| Peachtree Construction, LTD. | 71 | 16 of 71 |
| Foutsco Paving Company, LLC | 67 | 40 of 67 |
| Eurovia Atlantic Coast LLC | 40 | 18 of 40 |
| Hunter Industries, LTD. | 32 | 14 of 32 |
| Overland Corporation | 27 | 14 of 27 |
| Webber, LLC | 26 | 12 of 26 |
| Grey Sky Construction LLC | 23 | 1 of 23 |
| Ed Bell Construction Company | 22 | 2 of 22 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00196925 | Paris District | Widen Road - Add Shoulders, FM 35 (Creek Dr. to SH 276) | 6 of 9 | $7,794,981 | +15% |
| 04 NOV 2026 | A00221989 | Dallas District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | 1 of 7 | $1,246,988 | Low, 6.0% under the second |
| 03 NOV 2026 | A00184974 | Austin District | Highway Improvement, IH 35 (US 290 E to Martin Luther King Jr Blvd) | 1 of 6 | $412,233,374 | Low, 1.0% under the second |
| 14 OCT 2026 | A00218279 | Dallas District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, SH0183 (VARIOUS MANAGED LANES IN to DALLAS, DENTON & TARRANT COUNTIES) | 4 of 7 | $947,100 | +52% |
| 07 OCT 2026 | A00209263 | Waco District | Rehabilitate Existing Roadway, IH 35W (IH 35E to Johnson Co Line) | 5 of 5 | $13,403,331 | +23% |
| 07 OCT 2026 | A00187431 | Paris District | Preventive Maintenance, FM 273 (SH 78 to FM 1396) | 5 of 6 | $13,580,257 | +39% |
| 06 OCT 2026 | A00207643 | Paris District | Rehabilitate Existing Roadway, US 69 (Spruce Street (Whitewright) to Lovers Lane (Bells)) | 7 of 7 | $11,715,760 | +19% |
| 02 SEP 2026 | A00193937 | Dallas District | Intersection Improvement, SH 34 (At Abner Rd to .) | 1 of 7 | $960,753 | Low, 12% under the second |
| 20 AUG 2026 | A00222913 | Fort Worth District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0020 (Various locations to Parker County) | 7 of 7 | $1,161,605 | +62% |
| 06 AUG 2026 | A00187792 | Dallas District | Rehabilitate Existing Roadway, FM 981 (SH 78 to FM 1562) | 5 of 7 | $22,740,089 | +21% |
| 06 AUG 2026 | A00220224 | Fort Worth District | Rehabilitate Existing Roadway, SH 121 (Hickory Dr. NB to Hickory Dr. SB) | 2 of 5 | $3,256,791 | +2.0% |
| 05 AUG 2026 | A00007222 | Fort Worth District | Reconstruct Existing Roadway, US 81 (NORTH OF HARMON ROAD to NORTH OF IH 35W) | 10 of 11 | $77,613,527 | +17% |
| 05 AUG 2026 | A00133874 | Dallas District | Rehabilitate Existing Roadway, SH 34 (IH 20 EB Frontage Road to North of SH 243) | 5 of 7 | $7,436,526 | +19% |
| 02 JUL 2026 | A00187783 | Dallas District | Rehabilitate Existing Roadway, SH 289 (SL 12 to IH 635) | 3 of 6 | $6,522,985 | +9.0% |
| 02 JUL 2026 | A00221809 | Paris District | MILL AND INLAY, SH0019 (Various locations in to Paris District) | 2 of 3 | $6,596,041 | +5.0% |
| 01 JUL 2026 | A00212454 | Dallas District | Rehabilitate Existing Roadway, FM 1461 (CR 123 to Franklin Branch Road) | 6 of 9 | $5,072,824 | +16% |
| 01 JUL 2026 | A00217855 | Fort Worth District | Resurface Roadway, BU 287P (Bailey Boswell to Bonds Ranch) | 2 of 7 | $9,179,735 | +7.0% |
| 01 JUL 2026 | A00008199 | Fort Worth District | Interchange Improvement, IH 35W (Bethesda Road to Asher Road) | 5 of 6 | $73,699,093 | +14% |
| 01 JUL 2026 | A00221638 | Fort Worth District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, SH0121 (Various locations to N. Tarrant County) | 2 of 6 | $6,597,321 | +8.0% |
| 03 JUN 2026 | A00219121 | Fort Worth District | Resurface Roadway, SS 341 (Bolliger Blvd to Scott St.) | 3 of 8 | $1,627,625 | +9.0% |
| 02 JUN 2026 | A00209489 | Dallas District | Rehabilitate Existing Roadway, US 67 (Dallas County Line to BUS 287Q) | 4 of 6 | $5,719,434 | +7.0% |
| 02 JUN 2026 | A00196130 | Dallas District | Rehabilitate Existing Roadway, SL 12 (SS 408 to West Fork Trinity River) | 1 of 4 | $19,588,668 | Low, 4.0% under the second |
| 13 MAY 2026 | A00219475 | Dallas District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0067 (VARIOUS LOCATIONS WITHIN to WEST DALLAS COUNTY MAINTENANCE SECTION) | 2 of 4 | $882,819 | +1.0% |
| 07 MAY 2026 | A00031457 | San Antonio District | Highway Improvement, IH 410 (At US 281/San Pedro to .) | 3 of 3 | $163,611,215 | +5.0% |
| 07 MAY 2026 | A00219911 | Dallas District | MILL AND INLAY, IH0035E (Crown Rd to FM2181) | 3 of 3 | $6,486,908 | +15% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.