TxDOT contract A00217855 bid tabulation

Resurface Roadway, BU 287P (Bailey Boswell to Bonds Ranch). Let by Texas DOT on July 1, 2026, Tarrant, Fort Worth District. 7 bids received; low bid $8,547,147 by Jagoe-Public Company, -1.5% against the engineer's estimate of $8,675,952.

Owner
Texas DOT
Letting
01 JUL 2026
Pay items
76
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Jagoe-Public Company$8,547,147Low-1.0%
2Austin Bridge & Road Services, LP$9,179,735+7.0%+6.0%
3Texas Materials Group, Inc.$9,657,482+13%+11%
4Foutsco Paving Company, LLC$9,778,196+14%+13%
5Peachtree Construction, LTD.$10,383,527+21%+20%
6Eurovia Atlantic Coast LLC$10,430,913+22%+20%
7Overland Corporation$11,700,979+37%+35%
TxDOT contract A00217855: bids by rank

Engineer's estimate: $8,675,952.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Jagoe-Public Company2. Austin Bridge & Road Services, LP3. Texas Materials Group, Inc.4. Foutsco Paving Company, LLC5. Peachtree Construction, LTD.6. Eurovia Atlantic Coast LLC
1Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004)SY4,904$6.00$12.00$8.28$11.00$15.00$11.50$16.00
2Backfill (type A or B) (134-7004)STA266$150.00$280.00$170.00$335.00$150.00$500.00$375.00
3Asphalt (AC-20-5TR) (316-7007)GAL50,566$5.00$5.30$5.25$4.00$3.00$5.20$5.30
4Aggregate (type-B, GR-4)(sac-B) (316-7173)CY1,165$180.00$255.00$225.00$190.00$250.00$250.00$255.00
5D-GR HMA type D PG64-22 (level-UP) (341-7046)TON2,831$115.00$130.00$94.75$137.00$136.00$160.00$140.00
6SP mixes SP-C sac-A PG70-28 (344-7024)TON14,703.67$120.00$125.00$159.50$155.00$177.00$155.50$156.00
7Tack coat (344-7077)GAL25,575$0.50$2.50$4.20$0.01$0.10$2.00$3.00
8Tom-F PG76-22 sac-B (347-7007)TON3,131$235.00$145.00$170.00$175.00$190.00$170.00$165.00
9Flexible pavement structure repair(6") (351-7005)SY15,727$75.00$39.00$69.52$65.00$45.00$55.00$64.00
10Flexible pavement structure repair(10") (351-7009)SY2,193$110.00$80.00$77.07$95.00$95.00$95.00$88.00
11Planing asphalt concrete pavement(0" to 6") (354-7035)SY127,858$2.30$3.25$2.50$2.98$1.00$3.25$4.15
12Full - depth repair CRCP (10") (361-7057)SY1,023$195.00$180.00$355.94$330.00$305.00$340.00$326.00
13Riprap (concrete)(6 in) (432-7003)CY1,020$725.00$300.00$455.21$590.00$356.00$610.00$784.00
14Riprap (mow strip)(4 in) (432-7013)CY151$615.00$950.00$516.16$625.00$475.00$650.00$680.00
15Mobilization (500-7001)LS1$780,106$948,000$1,009,771$780,000$625,000$700,000$825,000
16Barricades, signs and traffic handling (502-7001)MO10$9,500.00$26,000$20,740$21,500$100,000$35,000$38,000
17Portable changeable message sign (503-7002)EACH2$10,000$13,000$8,147.27$10,000$20,000$14,000$18,000
18TMA (stationary) (505-7001)DAY300$200.00$200.00$1.00$1.00$1.00$175.00$325.00
19TMA (mobile operation) (505-7003)DAY40$240.00$200.00$1.00$1.00$1.00$450.00$715.00
20Temporary sediment control fence (install) (506-7039)LF2,365$4.50$3.75$3.60$4.50$1.00$3.75$5.50
21Temporary sediment control fence (remove) (506-7041)LF2,365$1.50$1.00$1.10$0.65$0.50$1.15$2.00
22Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF10,980$52.00$95.00$54.63$87.00$97.00$100.00$92.50
23Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041)LF10,980$17.75$15.00$7.20$18.00$25.00$26.50$12.50
24Portable concrete traffic barrier (pinning) (512-7071)EACH2,932$58.00$100.00$95.31$150.00$100.00$130.00$53.00
25Mill rumble strips (asphalt) (shoulder) (533-7001)LF29,198$0.30$0.21$0.21$0.36$0.21$0.23$0.49
26Metal W-beam guard fence (timber post) (540-7001)LF2,025$28.00$24.00$22.25$24.00$22.50$25.50$22.25
27Downstream anchor terminal section (540-7015)EACH9$1,200.00$1,200.00$1,645.00$1,200.00$1,300.00$1,800.00$1,645.00
28Remove metal beam guard fence (542-7001)LF2,025$3.00$2.50$2.75$2.50$2.00$3.15$2.75
29Remove terminal anchor section (542-7002)EACH9$200.00$150.00$275.00$150.00$200.00$265.00$275.00
30Guardrail end treatment (install) (544-7001)EACH9$3,000.00$3,000.00$3,216.00$2,950.00$3,125.00$3,650.00$3,216.00
31Guardrail end treatment (remove) (544-7003)EACH9$245.00$250.00$275.00$250.00$200.00$265.00$275.00
32Crash cushion attenuator (move & reset) (545-7002)EACH7$1,400.00$800.00$1,289.96$2,000.00$4,000.00$4,700.00$3,535.00
33Crash cushion attenuator (remove) (545-7004)EACH1$755.00$800.00$1,914.97$900.00$2,800.00$1,600.00$1,969.25
34Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH1$24,700$29,000$25,855$13,000$27,500$34,000$32,326
35Install small roadside sign support and assembly (inst sign only) (644-7064)EACH43$355.00$210.00$205.55$270.00$210.00$315.00$205.55
36Remove SM RD SN sup&AM (sign only) (644-7075)EACH43$41.00$70.00$69.00$70.00$69.00$80.00$69.00
37Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH40$11.00$25.00$25.00$25.00$31.00$30.00$25.00
38Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH752$10.00$15.00$15.00$20.00$29.00$16.00$15.00
39Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF16,809$0.30$0.30$0.30$0.21$0.21$0.33$0.30
40Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF72,344$0.30$0.24$0.24$0.20$0.20$0.27$0.24
41Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF13,184$0.50$0.50$0.45$0.50$0.50$0.50$0.45
42Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF842$2.80$2.75$2.75$4.00$4.00$3.00$2.75
43Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH78$30.00$40.00$40.00$45.00$45.00$44.00$40.00
44Work zone pavement marking non-removing(W)(word) (662-7030)EACH78$30.00$50.00$50.00$45.00$45.00$55.00$50.00
45Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF81,120$0.30$0.24$0.24$0.20$0.20$0.27$0.24
46Work zone pavement marking non-removing (Y)24"(solid) (662-7042)LF1,906$2.00$2.75$2.75$3.00$3.00$3.00$2.75
47Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH2,555$1.50$2.00$0.50$0.84$5.00$2.50$2.19
48Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF152$1.10$1.00$1.00$1.00$1.00$1.10$1.00
49Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF6,592$1.00$0.90$0.90$0.85$1.00$1.00$0.90
50Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF421$8.00$7.00$6.75$6.49$1.00$7.50$6.75
51Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH39$145.00$140.00$140.00$149.00$149.00$155.00$140.00
52Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH39$150.00$160.00$155.00$155.00$155.00$170.00$155.00
53Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF953$9.00$7.00$6.75$6.40$6.40$7.50$6.75
54Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF8,426$0.70$0.60$0.55$0.55$0.54$0.60$0.55
55Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF36,172$0.70$0.50$0.51$0.54$0.53$0.55$0.51
56Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF40,560$0.70$0.50$0.51$0.54$0.53$0.55$0.51
57Pavement sler 6" (666-7347)LF85,289$0.15$0.13$0.13$0.13$0.13$0.14$0.13
58Pavement sler 8" (666-7348)LF6,592$0.25$0.18$0.18$0.20$0.20$0.20$0.18
59Pavement sler 24" (666-7352)LF1,374$1.15$1.00$1.00$0.70$0.70$1.10$1.00
60Pavement sler (arrow) (666-7353)EACH39$9.00$15.00$15.00$12.00$12.00$16.50$15.00
61Pavement sler (word) (666-7354)EACH39$9.00$15.00$15.00$12.00$12.00$16.50$15.00
62Reflectorized pavement marker type I-C (672-7002)EACH351$5.00$4.00$3.85$4.00$3.98$4.25$3.85
63Reflectorized pavement marker type II-A-A (672-7004)EACH452$4.50$4.00$3.85$4.00$3.98$4.25$3.85
64Reflectorized pavement marker type II-C-R (672-7006)EACH461$7.00$4.00$3.85$4.00$3.98$4.25$3.85
65Pavement surface preparation for marking (6") (678-7002)LF16,418$0.11$0.10$0.10$0.21$0.24$0.11$0.10
66Pavement surface preparation for marking (8") (678-7004)LF3,082$0.11$0.20$0.20$0.30$0.30$0.22$0.20
67Pavement surface preparation for marking (12") (678-7006)LF210$0.29$1.00$1.00$0.60$0.60$1.10$1.00
68Pavement surface preparation for marking (24") (678-7008)LF235$1.01$2.00$2.00$0.70$0.70$2.15$2.00
69Pavement surface preparation for marking (arrow) (678-7009)EACH18$16.40$30.00$30.00$10.00$10.00$33.00$30.00
70Pavement surface preparation for marking (word) (678-7016)EACH18$17.40$40.00$40.00$10.00$10.00$44.00$40.00
71Pavement surface preparation for marking (RPM) (678-7033)EACH643$0.50$1.00$1.00$0.40$0.40$1.10$1.00
72Spalling repair (hydraulic cement) (720-7001)CF921$275.00$25.00$190.00$259.00$100.00$270.00$225.00
73Full - width mowing (730-7022)ACRE14.15$33.00$450.00$100.00$400.00$500.00$700.00$550.00
74Litter removal (734-7001)ACRE14.15$16.00$20.00$819.05$400.00$250.00$1,000.00$850.00
75Tree trimming / brush removal (752-7001)MI2.65$2,077.00$37,000$36,645$5,000.00$1,000.00$40,000$36,650
76Ditch cleaning and reshaping (foot) (760-7001)LF13,557$1.60$1.50$0.83$2.00$6.00$4.00$4.50
TxDOT contract A00217855: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy