Overland Corporation: TxDOT bid record

Overland Corporation submitted 69 bids on Texas DOT contracts in the data, from 02 FEB 2024 to 04 NOV 2026, and was the low bidder on 5 of them (7%). When it was not low, its total sat a median +19% above the low bid.

Owner
Texas DOT
Low bid volume
$30,841,246
Latest bid
04 NOV 2026
Data through
19 NOV 2026
69Bids
5Low bids
7Win rate, percent
+19%Median gap to the low bid when not low, 64 bids

By year

YearBidsLow bidsWin rate
20244375%
20252500%
20264025%
Overland Corporation, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District2300%
Wichita Falls District14321%
Fort Worth District1300%
Paris District9222%
Childress District700%
Abilene District100%
Amarillo District100%
Lubbock District100%
Overland Corporation, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marking type I (W)6"(solid)(100MIL)666-7411LF4430 (68%)$0.54$0.75
Reflectorized pavement marking type I (Y)6"(solid)(100MIL)666-7423LF4329 (67%)$0.54$0.76
Reflectorized pavement marker type II-A-A672-7004EACH4726 (55%)$4.00$5.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF4626 (57%)$0.90$1.10
Reflectorized pavement marking type I (W)24"(solid)(100MIL)666-7036LF3823 (61%)$6.88$8.00
Remove metal beam guard fence542-7001LF3622 (61%)$2.25$3.00
Reflectorized pavement marker type I-C672-7002EACH3119 (61%)$4.05$5.00
Reflectorized pavement marking type I (Y)6"(broken)(100MIL)666-7420LF2919 (66%)$0.57$0.72
Guardrail end treatment (install)544-7001EACH3518 (51%)$3,050.00$3,245.00
Guardrail end treatment (remove)544-7003EACH3118 (58%)$200.00$275.00
Work zone pavement marking non-removing (W)6"(solid)662-7008LF2818 (64%)$0.24$0.39
Work zone pavement marking non-removing (Y)6"(solid)662-7038LF2718 (67%)$0.24$0.40
Overland Corporation, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Overland Corporation, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00222905Fort Worth DistrictWiden Road - Add Lanes And Shoulders, SH 114 (At Alliance Blvd to .)7 of 7$771,411+60%
04 NOV 2026A00221989Dallas DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0045 (Various Roadways in the to Ellis County Maintenance Section)7 of 7$1,719,992+38%
03 NOV 2026A00188510Fort Worth DistrictIntersection Improvements With Right And/Or Left Turn Lanes, US 180 (West of Cool Jct to East of Cool Jct)5 of 8$616,693+25%
03 NOV 2026A00187429Paris DistrictPreventive Maintenance, BU 82H (SL 286 to 33rd ST SE)3 of 5$3,649,514+4.0%
14 OCT 2026A00218279Dallas DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, SH0183 (VARIOUS MANAGED LANES IN to DALLAS, DENTON & TARRANT COUNTIES)5 of 7$1,092,801+76%
07 OCT 2026A00187431Paris DistrictPreventive Maintenance, FM 273 (SH 78 to FM 1396)3 of 6$11,920,777+22%
06 OCT 2026A00195499Wichita Falls DistrictResurface Roadway, US 281 (FM 1954 to Lake Creek)1 of 5$3,682,675Low, 6.0% under the second
06 OCT 2026A00066946Dallas DistrictRehabilitate Existing Roadway, FM 75 (MONTE CARLO BLVD to FM 1827)7 of 8$6,548,052+33%
06 OCT 2026A00207643Paris DistrictRehabilitate Existing Roadway, US 69 (Spruce Street (Whitewright) to Lovers Lane (Bells))2 of 7$10,086,028+2.0%
12 AUG 2026A00217106Dallas DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, FM1385 (US 380 to Fishtrap)2 of 7$683,203+3.0%
12 AUG 2026A00220238Dallas DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, FM 2933 (SH 121 to FM 545)4 of 6$574,587+15%
06 AUG 2026A00187792Dallas DistrictRehabilitate Existing Roadway, FM 981 (SH 78 to FM 1562)3 of 7$19,980,076+6.0%
06 AUG 2026A00195300Wichita Falls DistrictWiden Road - Add Lanes, SH 79 (Near FM 2224 to 1.7 miles south)4 of 5$14,747,030+13%
05 AUG 2026A00194650Childress DistrictRehabilitate Existing Roadway, US 82 (0.422 Miles East of Guthrie Airport, E to 0.109 Miles East of US 83)2 of 5$29,743,290+3.0%
05 AUG 2026A00133874Dallas DistrictRehabilitate Existing Roadway, SH 34 (IH 20 EB Frontage Road to North of SH 243)4 of 7$7,381,444+18%
02 JUL 2026A00188996Dallas DistrictRehabilitate Existing Roadway, FM 2933 (CR 335 to FM 545)6 of 6$14,130,847+28%
02 JUL 2026A00219620Fort Worth DistrictRepair Roadway, SH 171 (Willingham St to FM 1718)6 of 7$2,291,702+22%
02 JUL 2026A00221480Paris DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, US0377 (Various locations in to Paris District)4 of 4$10,281,623+184%
01 JUL 2026A00212454Dallas DistrictRehabilitate Existing Roadway, FM 1461 (CR 123 to Franklin Branch Road)5 of 9$5,035,333+15%
01 JUL 2026A00217855Fort Worth DistrictResurface Roadway, BU 287P (Bailey Boswell to Bonds Ranch)7 of 7$11,700,979+37%
03 JUN 2026A00210421Fort Worth DistrictRehabilitate Existing Roadway, FM 1884 (South of Fleet St to End of the State Maintenance)6 of 7$7,249,954+21%
03 JUN 2026A00220499Fort Worth DistrictFLEXIBLE PAVEMENT STRUCTURE REPAIR, US0380 (Various locations to Jack County)6 of 6$8,981,471+53%
03 JUN 2026A00076951Childress DistrictHighway Improvement, SH 70 (8 Miles North of US 82, South to US 82)5 of 6$4,690,151+17%
02 JUN 2026A00185027Fort Worth DistrictIntersection Improvements With Right And/Or Left Turn Lanes, FM 920 (College St to Ric Williamson Memorial Highway)5 of 9$9,632,104+14%
02 JUN 2026A00064555Fort Worth DistrictWiden Road - Add Lanes, SH 174 (Wicker Hill Rd to North of Elk Dr.)5 of 8$21,808,766+10%
Overland Corporation: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy