TxDOT letting results, August 6, 2026
60 contracts let by Texas DOT on August 6, 2026, $533,630,478 in low bids, a median of 5 bidders per contract. On the 60 with an engineer's estimate, the low bid came in under it 42 times; median low bid -6.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 60
- Low bids, total
- $533,630,478
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00119935 | Interchange Improvement (New Or Update), IH 35 (0.47 MI S OF UNIROYAL INTERCHANGE to 3.22 MI N OF UNIROYAL INTERCHANGE) | Laredo District | 4 | Pulice Construction, Inc. | $205,813,981 | $217,055,849 | +5.0% | -9.0% | TxDOT |
| A00191470 | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | Houston District | 9 | James Construction Group, LLC | $32,673,736 | $33,824,290 | +4.0% | -23% | TxDOT |
| A00193006 | Surfacing/Roadway Restoration, US 87 (AMARILLO CREEK to 11 TH STREET IN AMARILLO) | Amarillo District | 3 | J. Lee Milligan, Inc. | $30,085,056 | $30,964,796 | +3.0% | -3.0% | TxDOT |
| A00124182 | Widen Road - Add Lanes And Shoulders, FM 236 (US 77 to FM 622) | Yoakum District | 3 | CK Newberry, LLC | $24,999,762 | $26,432,444 | +6.0% | -26% | TxDOT |
| A00187792 | Rehabilitate Existing Roadway, FM 981 (SH 78 to FM 1562) | Dallas District | 7 | D. L. Lennon Incorporated - Contractor | $18,829,388 | $19,350,920 | +3.0% | +3.0% | TxDOT |
| A00049653 | Widen Road - Add Lanes, FM 2275 (FM 1845 (PINE TREE RD), E to SH 300 IN LONGVIEW) | Tyler District | 5 | Longview Bridge and Road, LTD. | $17,959,231 | $18,990,388 | +6.0% | -8.0% | TxDOT |
| A00062075 | Construct Ramps, IH 20 (FM 1884 to SH 171) | Fort Worth District | 7 | Indus Road & Bridge, Inc. | $15,697,165 | $15,958,879 | +2.0% | -14% | TxDOT |
| A00140254 | Construct Rest Area, IH 10 (IH 10 Approx 3 miles Pecos County Line to .) | San Angelo District | 6 | Ragle Construction, Inc. | $13,741,321 | $16,617,786 | +21% | -31% | TxDOT |
| A00195300 | Widen Road - Add Lanes, SH 79 (Near FM 2224 to 1.7 miles south) | Wichita Falls District | 5 | A. L. Helmcamp, Inc. | $13,042,633 | $13,191,271 | +1.0% | -4.0% | TxDOT |
| A00203348 | Construct Rest Area, IH 30 (0.5 Mi W of CR 4204 to 0.5 Mi E of CR 4204) | Atlanta District | 4 | East Texas Bridge, Inc. | $10,625,436 | $10,965,651 | +3.0% | -14% | TxDOT |
| A00120927 | Surfacing/Roadway Restoration, US 60 (5TH STREET IN FRIONA to WALNUT AVE IN FRIONA) | Lubbock District | 5 | A. L. Helmcamp, Inc. | $9,764,859 | $10,064,052 | +3.0% | -3.0% | TxDOT |
| A00209034 | Rehabilitate Existing Roadway, US 281 (Tullos St to N of SH 72 North) | Corpus Christi District | 8 | STX Civil | $9,709,793 | $9,867,643 | +2.0% | -8.0% | TxDOT |
| A00128671 | Rehabilitate Existing Roadway, SH 256 (FM 2361, East to US 287) | Childress District | 3 | J. Lee Milligan, Inc. | $9,477,781 | $13,244,546 | +40% | +7.0% | TxDOT |
| A00189724 | Rehabilitate Existing Roadway, US 57 (US 277 to 1.179 MILES SOUTH OF SL 480) | Laredo District | 3 | Anderson Columbia Co., Inc. | $8,822,697 | $8,991,896 | +2.0% | -24% | TxDOT |
| A00199843 | Rehabilitate Existing Roadway, FM 2448 (SH 17 to IH 10) | Odessa District | 5 | Dan Williams Company | $8,604,312 | $9,182,210 | +7.0% | -3.0% | TxDOT |
| A00218304 | Advanced Traffic Management System, IH 10 (US 87/Roland to IH 410) | San Antonio District | 7 | Sice, Inc. | $7,903,389 | $8,364,058 | +6.0% | -24% | TxDOT |
| A00193343 | Hazard Elimination & Safety, SL 375 (MIDWAY DR to FRANCIS ST) | El Paso District | 4 | Albatross Construction LLC | $6,996,636 | $7,658,192 | +9.0% | +1.0% | TxDOT |
| A00136986 | Bridge Replacement, IH 10 (At SH 80 to .) | San Antonio District | 8 | Hunter Industries, LTD. | $5,753,739 | $5,956,399 | +4.0% | +1.0% | TxDOT |
| A00207005 | Emissions Reduction, SH 172 (@ SH 111 to .) | Yoakum District | 3 | STX Civil | $5,347,067 | $6,196,528 | +16% | -6.0% | TxDOT |
| A00215821 | Resurface Roadway, IH 45 (North of BNSF RR to North of W Canino Rd) | Houston District | 5 | MBN Enterprises LLC | $5,092,365 | $5,374,049 | +6.0% | +13% | TxDOT |
| A00223083 | DEBRIS REMOVAL, US0083 (Districtwide-PHR to Districtwide-PHR) | Maintenance Division District | 2 | Aftermath Disaster Recovery Inc | $4,425,474 | $5,986,940 | +35% | -37% | TxDOT |
| A00187526 | Rehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line) | Bryan District | 6 | Big Creek Construction, LTD. | $4,287,440 | $4,492,337 | +5.0% | +2.0% | TxDOT |
| A00194280 | Construct Pedestrian Infrastructure, FM 3470 (SH 201 to IH 14) | Waco District | 8 | Rucoba & Maya Construction, LLC | $4,094,515 | $4,347,032 | +6.0% | -8.0% | TxDOT |
| A00197439 | Highway Improvement, RM 150 (0.476 MI SE of Darden Hill Rd to RM 1826) | Austin District | 7 | STX Civil | $3,441,590 | $3,447,342 | 0.0% | +10% | TxDOT |
| A00221512 | CONCRETE SPALL REPAIR, US0059 (Districtwide to .) | Atlanta District | 3 | O. Trevino Construction, LLC | $3,381,575 | $3,399,050 | +1.0% | -5.0% | TxDOT |
| A00196275 | Resurface Roadway, SH 43 (US 59 to SL 390) | Atlanta District | 5 | Madden Contracting Company, LLC. | $3,320,428 | $3,390,831 | +2.0% | 0.0% | TxDOT |
| A00220224 | Rehabilitate Existing Roadway, SH 121 (Hickory Dr. NB to Hickory Dr. SB) | Fort Worth District | 5 | Foutsco Paving Company, LLC | $3,202,525 | $3,256,791 | +2.0% | +9.0% | TxDOT |
| A00193283 | Rehabilitate Bridge, SS 347 (SH 121 WB to @ IH 35W SB) | Fort Worth District | 2 | Ragle Construction, Inc. | $2,868,397 | $4,002,559 | +40% | +81% | TxDOT |
| A00193246 | Intersection Improvement, US 87 (FM 2105 to 0.34 MI S OF FM 2105) | San Angelo District | 2 | Reece Albert, Inc. | $2,825,728 | $2,999,977 | +6.0% | +57% | TxDOT |
| A00194392 | Bridge Replacement, CR 1170 (At Sikes Creek to .) | Lufkin District | 6 | THK Construction LLC | $2,809,388 | $2,983,618 | +6.0% | +14% | TxDOT |
| A00221146 | PAVEMENT MARKINGS, US0281 (VARIOUS ROADWAYS to ACROSS WACO DISTRICT) | Waco District | 5 | Stripe-A-Zone, LLC | $2,469,735 | $2,528,369 | +2.0% | -30% | TxDOT |
| A00127779 | Rehabilitate Bridge, UA 90 (UA 90 SB at Buffalo Bayou to .) | Houston District | 4 | Garret Shields Infrastructure | $2,463,336 | $2,607,737 | +6.0% | +38% | TxDOT |
| A00193144 | Hazard Elimination & Safety, US 281 (0.8 MI N of PR1 to 0.515 MI S of PR1) | Austin District | 7 | Hunter Industries, LTD. | $2,419,095 | $2,489,091 | +3.0% | -3.0% | TxDOT |
| A00209788 | Traffic Signal Improvements, BU 77W (0.1 Mi. N. of SH 186 to 0.1 Mi. S. of SH 186) | Pharr District | 3 | Austin Traffic Signal Construction Co., Inc. | $2,385,103 | $2,529,692 | +6.0% | -16% | TxDOT |
| A00206666 | Install Illumination, SL 12 (US 175 to Pemberton Hill) | Dallas District | 10 | Albatross Construction LLC | $2,138,842 | $2,255,663 | +5.0% | -31% | TxDOT |
| A00193593 | Hazard Elimination & Safety, FM 3005 (Kiva Road to South of 89th Street) | Houston District | 14 | Jasco | $2,099,052 | $2,589,996 | +23% | -28% | TxDOT |
| A00206263 | Bicycle And Pedestrian Improvements, Various (Champions, Tradewinds, and Deauville to Between Arlington Rd & SH250) | Odessa District | 6 | Delgado'S Contractors, LLC | $2,075,905 | $2,097,279 | +1.0% | -4.0% | TxDOT |
| A00216599 | TRAFFIC SIGNAL MAINTENANCE, US0290 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 5 | Austin Traffic Signal Construction Co., Inc. | $1,975,939 | $2,141,390 | +8.0% | +13% | TxDOT |
| A00223205 | AGGREGATE, US0075 (Various locations in to the Paris District) | Paris District | 1 | RK Hall, LLC | $1,934,598 | -1.0% | TxDOT | ||
| A00220796 | CLEANING AND SWEEPING HIGHWAYS, IH0035 (VARIOUS to VARIOUS) | Laredo District | 3 | Digg Commercial, LLC | $1,786,303 | $1,908,054 | +7.0% | -8.0% | TxDOT |
| A00192187 | Bridge Replacement, CR 398 (AT LEE GULLY to EXISTING (STR#200360AA0184001)) | Beaumont District | 6 | Castillo Aranda LLC | $1,675,110 | $1,744,267 | +4.0% | +17% | TxDOT |
| A00223085 | ASPHALT, US0083 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 2 | Ergon Asphalt & Emulsions, Inc. | $1,538,330 | $2,327,680 | +51% | -7.0% | TxDOT |
| A00190819 | Bridge Replacement, COUNTY ROAD 1018 (At Big Creek to .) | Paris District | 5 | Hodges and Son Construction Company, Inc. | $1,492,466 | $1,522,873 | +2.0% | -3.0% | TxDOT |
| A00223074 | ASPHALT, SH0015 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 2 | Ergon Asphalt & Emulsions, Inc. | $1,147,052 | $1,650,320 | +44% | -6.0% | TxDOT |
| A00188243 | Install Traffic Signal, Various (VARIOUS LOCATIONS to DISTRICTWIDE FY 2026) | Fort Worth District | 9 | Durable Specialties, Inc. | $1,054,947 | $1,138,059 | +8.0% | -24% | TxDOT |
| A00219498 | CULVERT REPLACEMENT, FM3002 (FM 3002 and other to locations in Cooke & Montague Counties) | Wichita Falls District | 3 | Garret Shields Infrastructure | $987,928 | $1,289,312 | +31% | -5.0% | TxDOT |
| A00222319 | MILL AND INLAY, SH0006 (Various to Various) | Bryan District | 4 | Big Creek Construction, LTD. | $987,331 | $991,801 | 0.0% | -12% | TxDOT |
| A00214454 | Bridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .) | Fort Worth District | 8 | Hodges and Son Construction Company, Inc. | $961,912 | $967,631 | +1.0% | +13% | TxDOT |
| A00223052 | ASPHALT, US0087 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 2 | Ergon Asphalt & Emulsions, Inc. | $934,200 | $1,432,700 | +53% | -11% | TxDOT |
| A00193174 | Off System Signal System Upgrades, BERRY ST (E. Berry St at New York Ave to .) | Fort Worth District | 6 | Durable Specialties, Inc. | $919,477 | $927,830 | +1.0% | -19% | TxDOT |
| A00223088 | SNOW AND ICE CONTROL, US0087 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | Amarillo District | 1 | Volcanic Stone Co. | $833,061 | 0.0% | TxDOT | ||
| A00212319 | Highway Improvement, SH 183 (SH 157 to Bear Creek Blvd) | Fort Worth District | 4 | Foutsco Paving Company, LLC | $698,181 | $709,404 | +2.0% | -15% | TxDOT |
| A00192928 | Hazard Elimination & Safety, FM 1015 (Mile 12 N Rd. to Ida St.) | Pharr District | 4 | Artillery L.L.C. | $662,209 | $681,211 | +3.0% | +2.0% | TxDOT |
| A00219268 | Install Illumination, Various (Install Roadway Illumination to in the Tyler District) | Tyler District | 10 | Striping Technology, L.P. | $655,280 | $703,832 | +7.0% | -29% | TxDOT |
| A00211130 | Bridge Maintenance, IH 45 (N of CR 4742 to S of CR 4744) | Dallas District | 9 | Rear Contractors LLC | $480,955 | $487,080 | +1.0% | -25% | TxDOT |
| A00213982 | Landscape Development, Various (Various Locations Districtwide to .) | Lufkin District | 5 | Apex Landscape & Irrigation, LLC | $452,893 | $455,750 | +1.0% | -32% | TxDOT |
| A00218356 | Infrastructure Improvements, Various (SH 130 at IH 35 to SH 130 @ Caldwell/Guadalupe CL) | Austin District | 4 | The Levy Company, Inc. | $307,520 | $372,028 | +21% | -3.0% | TxDOT |
| A00184278 | Hazard Elimination & Safety, Various (COUNTY WIDE to .) | Beaumont District | 3 | Stripe Lines, Inc. | $224,135 | $232,649 | +4.0% | -69% | TxDOT |
| A00217764 | Landscape Development, Various (Various locations Bastrop County to SL 109; SH 21; US 290; FM 1704) | Austin District | 8 | Apex Landscape & Irrigation, LLC | $224,027 | $288,954 | +29% | -37% | TxDOT |
| A00206677 | Hazard Elimination & Safety, SH 11 (0.05 Mi W of FM 275 to 0.05 Mi E of FM 275) | Paris District | 7 | Striping Technology, L.P. | $48,148 | $48,460 | +1.0% | -39% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.