TxDOT contract A00214454 bid tabulation

Bridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .). Let by Texas DOT on August 6, 2026, Wise, Fort Worth District. 8 bids received; low bid $961,912 by Hodges and Son Construction Company, Inc., +13% against the engineer's estimate of $854,302.

Owner
Texas DOT
Letting
06 AUG 2026
Pay items
56
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hodges and Son Construction Company, Inc.$961,912Low+13%
2Garret Shields Infrastructure$967,631+1.0%+13%
3Texas Steel Industrial Placing, LLC$999,854+4.0%+17%
4Scott Tucker Construction Company, LLC$1,013,241+5.0%+19%
5Coppell Construction Co., Inc.$1,140,751+19%+34%
6Ed Bell Construction Company$1,265,000+32%+48%
7Earth Builders, L.P.$1,372,184+43%+61%
8THK Construction LLC$1,590,868+65%+86%
TxDOT contract A00214454: bids by rank

Engineer's estimate: $854,302.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hodges and Son Construction Company, Inc.2. Garret Shields Infrastructure3. Texas Steel Industrial Placing, LLC4. Scott Tucker Construction Company, LLC5. Coppell Construction Co., Inc.6. Ed Bell Construction Company
1Preparing row (100-7002)STA4$7,000.00$9,000.00$1,000.00$1,000.00$4,013.00$3,500.00$5,000.00
2Obliterating abandoned road (106-7002)SY956$8.00$15.00$40.00$18.08$14.00$29.00$16.00
3Excavation (roadway) (110-7001)CY35$37.00$35.00$30.00$50.00$14.00$59.00$175.00
4Excavation (channel) (110-7002)CY928$28.00$20.00$30.00$17.00$8.00$29.00$65.00
5Embankment (final)(DC)(type B) (132-7004)CY1,560$30.00$30.00$30.00$22.00$56.00$30.00$50.00
6Compost manuf topsoil (4") (161-7002)SY2,677$3.00$10.00$5.00$2.30$9.00$2.50$1.36
7Straw/hay mulch seed(permanent_rural_sand) (164-7025)SY2,677$3.00$3.00$0.10$1.78$0.70$1.80$0.65
8Straw/hay mulch seed (temporary_warm) (164-7029)SY1,339$1.00$3.00$0.10$2.33$0.70$2.50$0.60
9Straw/hay mulch seed (temporary_warm_cool) (164-7031)SY1,339$1.80$3.00$0.10$2.33$0.70$2.50$0.61
10Vegetative watering (168-7001)TGL21$10.00$1.00$10.00$103.59$452.00$50.00$365.21
11FL BS (compacted in place)(type A GR 1-2) (8") (247-7067)SY900$43.00$48.00$25.00$29.00$23.00$37.00$50.00
12Prime coat(MC-30 or AE-P) (310-7013)GAL270$15.00$10.00$8.00$30.47$33.00$15.00$7.63
13SP mixes SP-C PG70-28 (344-7023)TON95.50$160.00$450.00$450.00$699.00$745.00$433.00$471.97
14Tack coat (344-7077)GAL88$4.00$5.00$6.00$5.00$9.00$5.00$5.45
15Cem stabil BKFL (400-7010)CY66$300.00$300.00$200.00$150.00$218.00$330.00$575.00
16Drilled shaft (36 in) (416-7006)LF300$290.00$310.00$350.00$340.00$376.00$350.00$375.00
17Class C concrete (abutment)(HPC) (420-7013)CY31$1,210.00$1,900.00$1,200.00$1,100.00$1,131.00$1,350.00$2,000.00
18Reinforced concrete slab (HPC) (422-7002)SF1,820$18.00$32.00$30.00$22.00$33.00$39.00$40.00
19Approach slab (HPC) (422-7014)CY38.50$810.00$1,000.00$1,200.00$700.00$886.00$920.00$1,500.00
20Prestressed concrete girder (TX28) (425-7001)LF278$55.00$65.00$250.00$300.00$137.00$330.00$200.00
21Riprap (mow strip)(4 in) (432-7013)CY24$745.00$750.00$600.00$550.00$786.00$750.00$1,250.00
22Riprap (stone protection)(24 in) (432-7045)CY320$196.00$180.00$180.00$140.00$122.00$160.00$275.00
23Rail (type T631) (450-7020)LF172$122.00$90.00$150.00$99.25$112.00$100.00$108.18
24Armor joint (sealed) (454-7003)LF48$200.00$150.00$300.00$120.00$95.00$225.00$150.00
25Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$20,000$30,000$20,000$10,000$18,905$30,000$30,000
26Mobilization (500-7001)LS1$78,000$85,000$100,000$96,000$100,000$95,000$103,939
27Barricades, signs and traffic handling (502-7001)MO5$3,265.00$2,000.00$5,000.00$3,000.00$2,191.00$15,000$8,500.00
28Portable changeable message sign (503-7001)DAY75$91.00$95.00$100.00$115.00$98.00$55.00$275.00
29Rock filter dams (install) (type 2) (506-7002)LF100$45.00$1.00$20.00$58.57$47.00$59.00$72.66
30Rock filter dams (remove) (506-7011)LF100$11.00$1.00$5.00$20.20$15.00$21.00$14.99
31Temporary sediment control fence (install) (506-7039)LF1,864$4.00$1.00$5.00$5.40$3.70$5.50$4.15
32Temporary sediment control fence (remove) (506-7041)LF1,864$1.20$1.00$1.00$1.03$1.10$1.10$1.27
33Biodegradable erosion control logs (install) (18") (506-7045)LF100$8.00$5.00$5.00$10.84$7.00$11.00$8.07
34Biodegradable erosion control logs (remove) (506-7046)LF100$1.50$1.00$1.00$1.03$1.30$1.00$1.50
35Constructing detours (508-7001)SY1,094$125.00$100.00$60.00$175.00$103.00$105.00$94.00
36Driveways (ACP) (530-7010)SY131$75.00$90.00$120.00$112.00$125.00$66.00$265.00
37Metal W-beam guard fence (timber post) (540-7001)LF225$25.00$26.00$40.00$26.90$31.00$27.00$29.32
38Metal beam guard fence trans (T6) (540-7008)EACH4$500.00$1,500.00$500.00$1,199.00$1,335.00$1,200.00$1,306.91
39Metal thrie-beam guard fence adjustment (540-7010)LF25$12.00$20.00$40.00$29.55$34.00$30.00$32.21
40Short radius (28") (540-7013)LF43.75$42.00$40.00$30.00$59.45$67.00$60.00$64.80
41Downstream anchor terminal section (540-7015)EACH1$1,400.00$1,600.00$1,500.00$1,678.00$1,896.00$1,700.00$1,829.02
42Guardrail end treatment (install) (544-7001)EACH3$3,200.00$3,300.00$3,500.00$3,398.00$3,761.00$3,400.00$3,703.82
43Gate (remove) (550-7016)EACH1$500.00$50.00$500.00$500.00$40.00$500.00$545.00
44Wire fence (type C) (552-7003)LF96$23.00$35.00$10.00$23.00$54.00$23.00$25.07
45Gate (type 1) (552-7006)EACH1$1,781.00$2,000.00$1,000.00$1,800.00$1,049.00$1,800.00$1,962.00
46Remove SM RD SN sup&AM (644-7073)EACH4$100.00$50.00$100.00$100.00$63.00$250.00$163.50
47Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004)EACH6$49.00$500.00$40.00$79.00$79.00$79.00$86.11
48Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH19$48.00$25.00$40.00$30.00$30.00$30.00$32.70
49Work zone pavement marking non-removing (W)4"(solid) (662-7004)LF2,684$1.00$1.00$0.70$0.55$3.10$0.55$1.09
50Work zone pavement marking non-removing (Y)4"(solid) (662-7035)LF6,210$1.00$1.00$0.70$0.55$3.10$0.55$1.09
51Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH220$1.60$5.00$1.25$1.00$2.40$15.00$1.09
52Pavement sler 6" (666-7347)LF140$1.50$1.00$1.25$1.00$3.80$1.00$2.18
53Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF140$2.50$5.00$5.00$4.00$3.80$4.00$2.18
54Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF740$2.50$5.00$5.00$4.00$3.20$4.00$2.18
55Tree removal (18" - 24" diameter) (752-7007)EACH54$150.00$370.00$750.00$565.00$413.00$1,210.00$615.85
56Post and cable fence (removal) (772-7001)LF123$7.00$8.00$5.00$4.50$4.00$15.00$4.91
TxDOT contract A00214454: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy