Earth Builders, L.P.: TxDOT bid record
Earth Builders, L.P. submitted 142 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 07 OCT 2026, and was the low bidder on 15 of them (11%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $85,351,338
- Latest bid
- 07 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 15 | 1 | 7% |
| 2021 | 39 | 2 | 5% |
| 2022 | 18 | 5 | 28% |
| 2023 | 17 | 5 | 29% |
| 2024 | 17 | 0 | 0% |
| 2025 | 20 | 2 | 10% |
| 2026 | 16 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Childress District | 29 | 6 | 21% |
| Abilene District | 21 | 4 | 19% |
| Wichita Falls District | 18 | 0 | 0% |
| Fort Worth District | 11 | 0 | 0% |
| Yoakum District | 11 | 1 | 9% |
| Lubbock District | 10 | 2 | 20% |
| Houston District | 10 | 1 | 10% |
| Amarillo District | 10 | 1 | 10% |
| Brownwood District | 3 | 0 | 0% |
| Bryan District | 3 | 0 | 0% |
| San Angelo District | 2 | 0 | 0% |
| El Paso District | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 138 | 43 (31%) | $3,000.00 | $5,000.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 95 | 32 (34%) | $1.00 | $1.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 74 | 31 (42%) | $2.00 | $1.40 |
| Excavation (roadway) | 110-7001 | CY | 96 | 27 (28%) | $25.00 | $20.00 |
| TMA (stationary) | 505-7001 | DAY | 71 | 27 (38%) | $250.00 | $230.00 |
| Temporary special shoring | 403-7001 | SF | 54 | 22 (41%) | $30.00 | $35.73 |
| Install delineator assembly (D-SW)SZ (BRF)CTB (BI) | 658-6014 | EACH | 57 | 18 (32%) | $25.00 | $25.00 |
| Excavation (channel) | 110-7002 | CY | 50 | 18 (36%) | $25.00 | $27.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 69 | 17 (25%) | $150.00 | $110.00 |
| Removing concrete (riprap) | 104-7006 | SY | 40 | 15 (38%) | $20.00 | $25.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 105 | 14 (13%) | $3,500.00 | $3,245.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 77 | 14 (18%) | $50.00 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 71 | 42 of 71 |
| Gilvin-Terrill, LTD. | 41 | 13 of 41 |
| Coppell Construction Co., Inc. | 40 | 28 of 40 |
| J. Lee Milligan, Inc. | 18 | 4 of 18 |
| C. E. Barker, LTD. | 17 | 10 of 17 |
| Integrity Services, LLC | 16 | 12 of 16 |
| THK Construction LLC | 15 | 12 of 15 |
| Skyline Bridge LLC | 14 | 14 of 14 |
| Altus Construction LLC | 13 | 10 of 13 |
| Blackstone Concrete Ventures, LLC | 11 | 9 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | A00191892 | Odessa District | Bridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .) | 5 of 7 | $9,829,699 | +45% |
| 06 OCT 2026 | A00134683 | Houston District | Bridge Replacement, POOL HILL RD (Pool Hill Road/CR2030 @ Brookshire Creek to .) | 8 of 9 | $2,983,322 | +52% |
| 03 SEP 2026 | A00184830 | Amarillo District | Bridge Replacement, IH 40 (IH 40 AT SH 207 to .) | 7 of 7 | $13,990,306 | +41% |
| 03 SEP 2026 | A00207389 | Childress District | Bridge Replacement, FM 1547 (@ Buck Creek to .) | 2 of 7 | $3,434,175 | +14% |
| 02 SEP 2026 | A00206056 | Wichita Falls District | Construct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR) | 7 of 7 | $1,497,714 | +45% |
| 02 SEP 2026 | A00207438 | Wichita Falls District | Bridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw) | 6 of 6 | $4,529,737 | +62% |
| 06 AUG 2026 | A00127779 | Houston District | Rehabilitate Bridge, UA 90 (UA 90 SB at Buffalo Bayou to .) | 3 of 4 | $3,544,864 | +44% |
| 06 AUG 2026 | A00128671 | Childress District | Rehabilitate Existing Roadway, SH 256 (FM 2361, East to US 287) | 2 of 3 | $13,244,546 | +40% |
| 06 AUG 2026 | A00214454 | Fort Worth District | Bridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .) | 7 of 8 | $1,372,184 | +43% |
| 05 AUG 2026 | A00065091 | Fort Worth District | Bridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .) | 8 of 10 | $2,065,827 | +35% |
| 02 JUN 2026 | A00200068 | Childress District | Bridge Replacement, SH 70 (@ Quitaque River to .) | 7 of 9 | $4,869,671 | +43% |
| 13 MAY 2026 | A00214602 | Abilene District | DRAINAGE IMPROVEMENT AND/OR REPAIRS, FM2320 (SH208 to FM1228) | 5 of 7 | $957,412 | +67% |
| 06 MAY 2026 | A00211596 | Childress District | Bridge Maintenance, US 83 (US 83 SB @ Salt Fork of Red River to .) | 13 of 13 | $4,486,086 | +87% |
| 06 MAY 2026 | A00139927 | San Angelo District | Bridge Replacement, FM 72 (At Spring Creek Bridge to -) | 8 of 10 | $7,647,572 | +74% |
| 04 FEB 2026 | A00188551 | Amarillo District | Bridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .) | 3 of 7 | $2,520,955 | +26% |
| 04 FEB 2026 | A00032669 | Fort Worth District | Bridge Replacement, CR 6010 (ROBERTS RD. AT PANTHER CREEK to .) | 9 of 9 | $1,526,753 | +74% |
| 03 DEC 2025 | A00207372 | Childress District | Bridge Replacement, COUNTY ROAD 384 (@ Duck Creek to .) | 5 of 5 | $1,386,916 | +36% |
| 03 DEC 2025 | A00045322 | Abilene District | Bridge Replacement, FM 604 (AT JIM NED CREEK to .) | 5 of 9 | $4,096,531 | +52% |
| 06 NOV 2025 | A00036755 | Abilene District | Bridge Replacement, COUNTY ROAD 309 (AT CLEAR FORK BRAZOS RIVER to .) | 8 of 8 | $3,273,428 | +89% |
| 05 NOV 2025 | A00133631 | Childress District | Install/Upgrade Drainage Structure(S), FM 3257 (1.44 Miles North of US 287, North to 1.88 Miles North of US 287) | 1 of 6 | $1,781,819 | Low, 8.0% under the second |
| 08 OCT 2025 | A00207434 | Wichita Falls District | Bridge Replacement, S HANCOCK ST (Hancock St to at Dry Fork Little Wichita River) | 8 of 8 | $1,864,955 | +62% |
| 08 OCT 2025 | A00200728 | Wichita Falls District | Bridge Replacement, COUNTY ROAD 241 (CR 238 (Sign CR 128W) at Paradise Creek to .) | 4 of 5 | $1,693,517 | +19% |
| 09 SEP 2025 | A00216262 | Lubbock District | BRIDGE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | 3 of 3 | $1,325,492 | +38% |
| 05 SEP 2025 | A00205768 | Abilene District | Bridge Replacement, FM 1835 (FM 1835 to @ DOUBLE MOUNTAIN FORK BRAZOS RIVER) | 6 of 10 | $6,183,843 | +59% |
| 08 AUG 2025 | A00208402 | Wichita Falls District | CULVERT EXTENSION & CROSS DRAINAGE, BU0277A (BU 0277A; FM 91 to and FM 172) | 4 of 4 | $1,983,194 | +27% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.