Earth Builders, L.P.: TxDOT bid record

Earth Builders, L.P. submitted 142 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 07 OCT 2026, and was the low bidder on 15 of them (11%). When it was not low, its total sat a median +33% above the low bid.

Owner
Texas DOT
Low bid volume
$85,351,338
Latest bid
07 OCT 2026
Data through
19 NOV 2026
142Bids
15Low bids
11Win rate, percent
+33%Median gap to the low bid when not low, 127 bids

By year

YearBidsLow bidsWin rate
20201517%
20213925%
202218528%
202317529%
20241700%
202520210%
20261600%
Earth Builders, L.P., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Childress District29621%
Abilene District21419%
Wichita Falls District1800%
Fort Worth District1100%
Yoakum District1119%
Lubbock District10220%
Houston District10110%
Amarillo District10110%
Brownwood District300%
Bryan District300%
San Angelo District200%
El Paso District200%
Earth Builders, L.P., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO13843 (31%)$3,000.00$5,000.00
Temporary sediment control fence (remove)506-7041LF9532 (34%)$1.00$1.00
Biodegradable erosion control logs (remove)506-7046LF7431 (42%)$2.00$1.40
Excavation (roadway)110-7001CY9627 (28%)$25.00$20.00
TMA (stationary)505-7001DAY7127 (38%)$250.00$230.00
Temporary special shoring403-7001SF5422 (41%)$30.00$35.73
Install delineator assembly (D-SW)SZ (BRF)CTB (BI)658-6014EACH5718 (32%)$25.00$25.00
Excavation (channel)110-7002CY5018 (36%)$25.00$27.00
Remove SM RD SN sup&AM644-7073EACH6917 (25%)$150.00$110.00
Removing concrete (riprap)104-7006SY4015 (38%)$20.00$25.00
Guardrail end treatment (install)544-7001EACH10514 (13%)$3,500.00$3,245.00
Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI)658-7019EACH7714 (18%)$50.00$35.00
Earth Builders, L.P., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Hodges and Son Construction Company, Inc.7142 of 71
Gilvin-Terrill, LTD.4113 of 41
Coppell Construction Co., Inc.4028 of 40
J. Lee Milligan, Inc.184 of 18
C. E. Barker, LTD.1710 of 17
Integrity Services, LLC1612 of 16
THK Construction LLC1512 of 15
Skyline Bridge LLC1414 of 14
Altus Construction LLC1310 of 13
Blackstone Concrete Ventures, LLC119 of 11
Earth Builders, L.P., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 OCT 2026A00191892Odessa DistrictBridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .)5 of 7$9,829,699+45%
06 OCT 2026A00134683Houston DistrictBridge Replacement, POOL HILL RD (Pool Hill Road/CR2030 @ Brookshire Creek to .)8 of 9$2,983,322+52%
03 SEP 2026A00184830Amarillo DistrictBridge Replacement, IH 40 (IH 40 AT SH 207 to .)7 of 7$13,990,306+41%
03 SEP 2026A00207389Childress DistrictBridge Replacement, FM 1547 (@ Buck Creek to .)2 of 7$3,434,175+14%
02 SEP 2026A00206056Wichita Falls DistrictConstruct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR)7 of 7$1,497,714+45%
02 SEP 2026A00207438Wichita Falls DistrictBridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw)6 of 6$4,529,737+62%
06 AUG 2026A00127779Houston DistrictRehabilitate Bridge, UA 90 (UA 90 SB at Buffalo Bayou to .)3 of 4$3,544,864+44%
06 AUG 2026A00128671Childress DistrictRehabilitate Existing Roadway, SH 256 (FM 2361, East to US 287)2 of 3$13,244,546+40%
06 AUG 2026A00214454Fort Worth DistrictBridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .)7 of 8$1,372,184+43%
05 AUG 2026A00065091Fort Worth DistrictBridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .)8 of 10$2,065,827+35%
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)7 of 9$4,869,671+43%
13 MAY 2026A00214602Abilene DistrictDRAINAGE IMPROVEMENT AND/OR REPAIRS, FM2320 (SH208 to FM1228)5 of 7$957,412+67%
06 MAY 2026A00211596Childress DistrictBridge Maintenance, US 83 (US 83 SB @ Salt Fork of Red River to .)13 of 13$4,486,086+87%
06 MAY 2026A00139927San Angelo DistrictBridge Replacement, FM 72 (At Spring Creek Bridge to -)8 of 10$7,647,572+74%
04 FEB 2026A00188551Amarillo DistrictBridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .)3 of 7$2,520,955+26%
04 FEB 2026A00032669Fort Worth DistrictBridge Replacement, CR 6010 (ROBERTS RD. AT PANTHER CREEK to .)9 of 9$1,526,753+74%
03 DEC 2025A00207372Childress DistrictBridge Replacement, COUNTY ROAD 384 (@ Duck Creek to .)5 of 5$1,386,916+36%
03 DEC 2025A00045322Abilene DistrictBridge Replacement, FM 604 (AT JIM NED CREEK to .)5 of 9$4,096,531+52%
06 NOV 2025A00036755Abilene DistrictBridge Replacement, COUNTY ROAD 309 (AT CLEAR FORK BRAZOS RIVER to .)8 of 8$3,273,428+89%
05 NOV 2025A00133631Childress DistrictInstall/Upgrade Drainage Structure(S), FM 3257 (1.44 Miles North of US 287, North to 1.88 Miles North of US 287)1 of 6$1,781,819Low, 8.0% under the second
08 OCT 2025A00207434Wichita Falls DistrictBridge Replacement, S HANCOCK ST (Hancock St to at Dry Fork Little Wichita River)8 of 8$1,864,955+62%
08 OCT 2025A00200728Wichita Falls DistrictBridge Replacement, COUNTY ROAD 241 (CR 238 (Sign CR 128W) at Paradise Creek to .)4 of 5$1,693,517+19%
09 SEP 2025A00216262Lubbock DistrictBRIDGE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)3 of 3$1,325,492+38%
05 SEP 2025A00205768Abilene DistrictBridge Replacement, FM 1835 (FM 1835 to @ DOUBLE MOUNTAIN FORK BRAZOS RIVER)6 of 10$6,183,843+59%
08 AUG 2025A00208402Wichita Falls DistrictCULVERT EXTENSION & CROSS DRAINAGE, BU0277A (BU 0277A; FM 91 to and FM 172)4 of 4$1,983,194+27%
Earth Builders, L.P.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.