Altus Construction LLC submitted 238 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 NOV 2026, and was the low bidder on 15 of them (6%). When it was not low, its total sat a median +31% above the low bid.

Owner
Texas DOT
Low bid volume
$88,235,884
Latest bid
03 NOV 2026
Data through
19 NOV 2026
238Bids
15Low bids
6Win rate, percent
+31%Median gap to the low bid when not low, 223 bids

By year

YearBidsLow bidsWin rate
20205812%
20217823%
20223126%
20231218%
202416319%
202522314%
202621314%
Altus Construction LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District52510%
Fort Worth District2000%
Austin District1600%
San Antonio District1400%
Yoakum District1300%
Waco District1300%
Tyler District900%
Wichita Falls District9222%
Amarillo District9333%
Lufkin District800%
Abilene District8113%
Houston District800%
Altus Construction LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Portable changeable message sign503-7002EACH14652 (36%)$7,637.80$10,000
Riprap (mow strip)(4 in)432-7013CY13449 (37%)$498.08$643.00
Cem stabil BKFL400-7010CY7637 (49%)$154.63$200.00
Guardrail end treatment (install)544-7001EACH14233 (23%)$3,064.60$3,245.00
Temporary sediment control fence (remove)506-7041LF16529 (18%)$0.91$1.00
Temporary sediment control fence (install)506-7039LF16529 (18%)$3.32$4.00
TMA (stationary)505-7001DAY21526 (12%)$208.38$230.00
Crash cushion attenuator (install)(S)(N)(TL3)545-7014EACH6226 (42%)$7,663.48$9,000.00
Metal W-beam guard fence (timber post)540-7001LF9424 (26%)$26.12$27.00
Riprap (concrete)(4 in)432-7001CY6424 (38%)$515.67$650.00
RC pipe (CL III)(24 in)464-7005LF7623 (30%)$92.78$108.13
Riprap (concrete)(5 in)432-7002CY5322 (42%)$490.17$640.65
Altus Construction LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Altus Construction LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 NOV 2026A00211505Amarillo DistrictBridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .)2 of 8$5,903,119+2.0%
07 OCT 2026A00196909Dallas DistrictHazard Elimination & Safety, IH 45 (South of Risinger Rd to Dallas County Line)3 of 8$4,308,009+15%
03 SEP 2026A00184246Lubbock DistrictHazard Elimination & Safety, US 87 (CR0336 to Martin County LIne)2 of 5$4,197,803+5.0%
02 SEP 2026A00200023Fort Worth DistrictReplace Guardrail, Various (VARIOUS LOCATIONS to WITHIN FORT WORTH DISTRICT)9 of 11$4,811,296+32%
05 AUG 2026A00067416Wichita Falls DistrictConstruct Rest Area, US 81 (ON US 287 8 MILES SOUTH OF BOWIE to .)3 of 4$14,504,711+30%
02 JUL 2026A00213157Wichita Falls DistrictBridge Maintenance, US 281 (At SH 79 SB / FM 369 WB Connector to .)7 of 10$2,118,149+23%
01 JUL 2026A00212454Dallas DistrictRehabilitate Existing Roadway, FM 1461 (CR 123 to Franklin Branch Road)7 of 9$5,573,028+27%
01 JUL 2026A00080576Odessa DistrictConstruct Bridge, US 385 (AT SOUTH SL 338 to .)6 of 6$66,505,548+24%
03 JUN 2026A00209326Dallas DistrictRepair Roadway, US 75 (Dallas County Line to Ridgeview Road)1 of 7$2,190,495Low, 36% under the second
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)4 of 9$3,960,162+16%
07 MAY 2026A00208023Houston DistrictRehabilitate Bridge, IH 45 (At McKinney Ramp to .)6 of 8$7,684,676+97%
07 MAY 2026A00141254Dallas DistrictRehabilitate Existing Roadway, IH 35E (IH 20 to Ann Arbor Ave.)1 of 3$11,542,446Low, 1.0% under the second
06 MAY 2026A00209373Dallas DistrictRepair Roadway, BS 121H (Sam Rayburn Tollway to FM 2281)2 of 4$1,606,058+11%
06 MAY 2026A00139927San Angelo DistrictBridge Replacement, FM 72 (At Spring Creek Bridge to -)7 of 10$5,958,483+35%
08 APR 2026A00194074Abilene DistrictBridge Replacement, CR 305 (ALKALI CRK TRIB to .)7 of 7$2,507,700+33%
07 APR 2026A00061686Abilene DistrictBridge Replacement, COUNTY ROAD 412 (CR 412 to AT COTTONWOOD CRK TRIB)6 of 6$4,852,521+54%
04 MAR 2026A00207039Wichita Falls DistrictConstruct Pedestrian Infrastructure, FM 1306 (FM 51 to Gainesville High School)5 of 12$2,470,595+13%
04 MAR 2026A00188550Amarillo DistrictRehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .)1 of 6$4,519,471Low, 35% under the second
04 MAR 2026A00132533Dallas DistrictBridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS)4 of 9$17,327,418+4.0%
05 FEB 2026A00183903Yoakum DistrictBridge Replacement, FM 1093 (AT SAN BERNARD RIVER to STR #446-06-035)9 of 12$6,278,648+26%
06 JAN 2026A00218196Fort Worth DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0820 (VARIOUS LOCATIONS WITHIN to South Tarrant County)11 of 13$1,443,702+50%
02 DEC 2025A00188972Yoakum DistrictBridge Replacement, SH 35 (AT CARANCAHUA BAY to STR# 0179-09-062)6 of 6$34,823,498+64%
06 NOV 2025A00062085Austin DistrictConstruct Bridge, SL 360 (AT COURTYARD DRIVE to .)5 of 8$70,249,208+3.0%
09 OCT 2025A00188271Wichita Falls DistrictBridge Replacement, US 70 (US 70 to at FM 1763)1 of 5$3,176,311Low, 15% under the second
08 OCT 2025A00207434Wichita Falls DistrictBridge Replacement, S HANCOCK ST (Hancock St to at Dry Fork Little Wichita River)3 of 8$1,183,936+3.0%
Altus Construction LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy