TxDOT contract A00209373 bid tabulation
Repair Roadway, BS 121H (Sam Rayburn Tollway to FM 2281). Let by Texas DOT on May 6, 2026, Denton, Dallas District. 4 bids received; low bid $1,447,702 by O. Trevino Construction, LLC, -0.2% against the engineer's estimate of $1,450,132.
- Owner
- Texas DOT
- Letting
- 06 MAY 2026
- Pay items
- 66
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | O. Trevino Construction, LLC | $1,447,702 | Low | 0.0% |
| 2 | Altus Construction LLC | $1,606,058 | +11% | +11% |
| 3 | Gibson & Associates, Inc. | $1,863,388 | +29% | +28% |
| 4 | Winding Road Construction, Inc. | $1,915,280 | +32% | +32% |
Engineer's estimate: $1,450,132.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. O. Trevino Construction, LLC | 2. Altus Construction LLC | 3. Gibson & Associates, Inc. | 4. Winding Road Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(DC)(type C) (132-7006) | CY | 4 | $16.00 | $315.00 | $11.38 | $750.00 | $500.00 |
| 2 | Block sodding (162-7002) | SY | 20 | $4.00 | $25.00 | $3.91 | $92.18 | $50.00 |
| 3 | Vegetative watering (168-7001) | TGL | 3 | $20.00 | $500.00 | $5.40 | $715.00 | $100.00 |
| 4 | Full-depth repair CPCD (10") (361-7051) | SY | 2,500 | $190.00 | $200.00 | $267.80 | $265.65 | $284.00 |
| 5 | Cem stabil BKFL (400-7010) | CY | 292 | $200.00 | $184.00 | $218.51 | $220.00 | $350.00 |
| 6 | Flowable backfill (401-7001) | CY | 11 | $350.00 | $615.00 | $506.09 | $1,350.00 | $500.00 |
| 7 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 330 | $200.00 | $85.00 | $68.19 | $165.00 | $144.00 |
| 8 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 47 | $225.00 | $220.00 | $168.30 | $220.00 | $174.00 |
| 9 | Riprap (concrete)(flume) (432-7012) | CY | 10 | $700.00 | $1,400.00 | $681.45 | $1,650.00 | $1,000.00 |
| 10 | Riprap (stone protection)(12 in) (432-7041) | CY | 538 | $140.00 | $300.00 | $125.67 | $235.00 | $225.00 |
| 11 | Cleaning and sealing existing joints (438-7001) | LF | 1,227 | $30.00 | $15.00 | $18.06 | $24.20 | $24.00 |
| 12 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 835 | $28.00 | $24.00 | $24.16 | $58.00 | $34.00 |
| 13 | Set (replace pipe runner assembly) (467-7003) | EACH | 1 | $200.00 | $2,150.00 | $2,424.93 | $1,500.00 | $1,000.00 |
| 14 | Clean existing culverts (480-7001) | EACH | 1 | $5,000.00 | $2,200.00 | $870.87 | $14,000 | $3,500.00 |
| 15 | Mobilization (500-7001) | LS | 1 | $131,000 | $140,000 | $159,841 | $200,000 | $125,000 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $10,000 | $5,000.00 | $16,064 | $7,900.00 | $12,500 |
| 17 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $5,000.00 | $7,907.39 | $10,600 | $15,000 |
| 18 | TMA (stationary) (505-7001) | DAY | 71 | $220.00 | $25.00 | $197.42 | $350.00 | $325.00 |
| 19 | TMA (mobile operation) (505-7002) | HR | 300 | $35.00 | $25.00 | $46.34 | $50.00 | $125.00 |
| 20 | Temporary sediment control fence (install) (506-7039) | LF | 440 | $4.00 | $4.50 | $1.99 | $7.15 | $7.50 |
| 21 | Temporary sediment control fence (remove) (506-7041) | LF | 440 | $1.00 | $1.50 | $0.70 | $2.48 | $3.50 |
| 22 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 660 | $5.00 | $6.00 | $3.98 | $6.55 | $7.50 |
| 23 | Biodegradable erosion control logs (remove) (506-7046) | LF | 660 | $1.00 | $1.25 | $0.46 | $2.04 | $3.50 |
| 24 | Concrete curb (mono) (type II) (529-7007) | LF | 415 | $8.00 | $15.00 | $5.44 | $11.00 | $49.00 |
| 25 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,160 | $2.50 | $3.75 | $0.77 | $7.00 | $7.50 |
| 26 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,630 | $1.50 | $0.56 | $2.10 | $0.53 | $0.61 |
| 27 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 18,688 | $1.50 | $0.81 | $0.94 | $0.88 | $0.88 |
| 28 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 6,210 | $7.00 | $6.50 | $6.59 | $6.71 | $6.99 |
| 29 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 78 | $170.00 | $150.00 | $192.94 | $154.00 | $159.50 |
| 30 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 4 | $270.00 | $190.00 | $379.55 | $220.00 | $208.00 |
| 31 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 78 | $200.00 | $160.00 | $214.03 | $165.00 | $170.50 |
| 32 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 6 | $500.00 | $255.00 | $732.75 | $742.50 | $275.00 |
| 33 | Pavement sler 6" (666-7347) | LF | 187,702 | $0.20 | $0.12 | $0.19 | $0.17 | $0.13 |
| 34 | Pavement sler 8" (666-7348) | LF | 18,688 | $0.30 | $0.22 | $0.21 | $0.22 | $0.24 |
| 35 | Pavement sler 24" (666-7352) | LF | 6,210 | $1.20 | $0.45 | $0.63 | $1.10 | $0.50 |
| 36 | Pavement sler (arrow) (666-7353) | EACH | 78 | $30.00 | $10.25 | $15.81 | $55.00 | $11.00 |
| 37 | Pavement sler (word) (666-7354) | EACH | 78 | $30.00 | $10.25 | $15.81 | $60.50 | $11.00 |
| 38 | Pavement sler (double arrow) (666-7356) | EACH | 4 | $35.00 | $14.25 | $26.36 | $82.50 | $15.40 |
| 39 | Pavement sler (RR crossing) (666-7364) | EACH | 6 | $60.00 | $51.00 | $79.07 | $82.50 | $55.00 |
| 40 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 32,200 | $0.50 | $0.51 | $0.66 | $0.55 | $0.55 |
| 41 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 79,364 | $0.60 | $0.51 | $0.59 | $0.52 | $0.55 |
| 42 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 74,508 | $0.70 | $0.51 | $0.59 | $0.52 | $0.55 |
| 43 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 2,547 | $5.00 | $3.84 | $3.53 | $3.85 | $4.18 |
| 44 | Eliminating existing PM & markers (4") (677-7001) | LF | 178,317 | $0.50 | $0.55 | $0.52 | $0.55 | $0.58 |
| 45 | Eliminating existing PM & markers (8") (677-7004) | LF | 18,688 | $1.00 | $0.72 | $0.62 | $1.10 | $0.77 |
| 46 | Eliminating existing PM & markers (12") (677-7006) | LF | 2,760 | $2.00 | $1.53 | $1.53 | $1.60 | $1.65 |
| 47 | Eliminating existing PM & markers (24") (677-7008) | LF | 2,970 | $3.50 | $2.54 | $3.11 | $2.53 | $2.75 |
| 48 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 78 | $50.00 | $50.00 | $52.72 | $49.50 | $54.00 |
| 49 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 4 | $65.00 | $76.00 | $73.80 | $77.00 | $82.50 |
| 50 | Eliminating existing PM & markers (word) (677-7015) | EACH | 78 | $60.00 | $50.00 | $52.72 | $55.00 | $54.00 |
| 51 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 6 | $200.00 | $102.00 | $158.15 | $110.00 | $110.00 |
| 52 | Pavement surface preparation for marking (6") (678-7002) | LF | 18,771 | $0.03 | $0.17 | $0.05 | $0.14 | $0.19 |
| 53 | Pavement surface preparation for marking (8") (678-7004) | LF | 1,869 | $0.05 | $0.20 | $0.05 | $0.17 | $0.22 |
| 54 | Pavement surface preparation for marking (24") (678-7008) | LF | 621 | $0.50 | $0.40 | $0.16 | $1.05 | $0.44 |
| 55 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 8 | $25.00 | $9.00 | $7.91 | $33.00 | $10.00 |
| 56 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 1 | $30.00 | $10.50 | $15.81 | $55.00 | $11.00 |
| 57 | Pavement surface preparation for marking (word) (678-7016) | EACH | 8 | $30.00 | $9.09 | $7.91 | $49.50 | $10.00 |
| 58 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 1 | $25.00 | $40.40 | $42.17 | $82.50 | $44.00 |
| 59 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 0.10 | $8,150.00 | $50,000 | $2,612.60 | $140,000 | $100,000 |
| 60 | Slotted drain cleaning (764-7021) | LF | 270 | $10.00 | $16.00 | $2.27 | $27.00 | $20.00 |
| 61 | Replace timber post W/O concrete FND (770-7006) | EACH | 26 | $90.00 | $185.00 | $113.81 | $185.90 | $100.00 |
| 62 | Replace steel post W/O concrete FND (770-7007) | EACH | 1 | $80.00 | $770.00 | $399.38 | $768.90 | $250.00 |
| 63 | Repair of terminal anchors posts (770-7011) | EACH | 1 | $100.00 | $770.00 | $959.75 | $768.90 | $1,000.00 |
| 64 | Replacing elastomeric bearing pads (787-7001) | EACH | 2 | $3,500.00 | $14,700 | $8,424.32 | $25,000 | $50,000 |
| 65 | Spot grinding - concrete pavement (3017-7002) | SY | 246 | $20.00 | $32.00 | $6.85 | $32.00 | $84.00 |
| 66 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 11 | $400.00 | $1,561.00 | $613.19 | $880.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.