TxDOT contract A00194074 bid tabulation
Bridge Replacement, CR 305 (ALKALI CRK TRIB to .). Let by Texas DOT on April 8, 2026, Fisher, Abilene District. 7 bids received; low bid $1,880,830 by Tucan Contracting, LLC, -25% against the engineer's estimate of $2,507,178.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 49
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Tucan Contracting, LLC | $1,880,830 | Low | -25% |
| 2 | Delgado'S Contractors, LLC | $1,910,911 | +2.0% | -24% |
| 3 | Skyline Bridge LLC | $1,915,919 | +2.0% | -24% |
| 4 | Hodges and Son Construction Company, Inc. | $2,008,199 | +7.0% | -20% |
| 5 | J. H. Strain & Sons, Inc. | $2,228,175 | +18% | -11% |
| 6 | Coppell Construction Co., Inc. | $2,418,193 | +29% | -4.0% |
| 7 | Altus Construction LLC | $2,507,700 | +33% | 0.0% |
Engineer's estimate: $2,507,178.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Tucan Contracting, LLC | 2. Delgado'S Contractors, LLC | 3. Skyline Bridge LLC | 4. Hodges and Son Construction Company, Inc. | 5. J. H. Strain & Sons, Inc. | 6. Coppell Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 11.60 | $5,000.00 | $2,750.00 | $1,000.00 | $1,500.00 | $2,500.00 | $1,500.00 | $3,000.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 400 | $17.00 | $27.50 | $20.00 | $16.00 | $15.00 | $30.00 | $35.00 |
| 3 | Excavation (channel) (110-7002) | CY | 232 | $32.50 | $33.00 | $20.00 | $16.00 | $15.00 | $40.00 | $33.00 |
| 4 | Embankment (final)(DC)(type B) (132-7004) | CY | 276 | $30.00 | $27.50 | $31.00 | $40.00 | $30.00 | $30.00 | $37.00 |
| 5 | Drill seed (permanent_rural_sand) (164-7009) | SY | 2,220 | $0.50 | $1.10 | $2.00 | $4.60 | $2.00 | $5.00 | $1.35 |
| 6 | Vegetative watering (168-7001) | TGL | 31 | $55.00 | $55.00 | $40.10 | $1.00 | $1.00 | $100.00 | $50.00 |
| 7 | FL BS (compacted in place)(type A or B GR 4)(6") (247-7064) | SY | 2,892 | $40.00 | $27.50 | $22.50 | $35.00 | $20.00 | $33.00 | $25.00 |
| 8 | Prime coat (MC-30) (310-7004) | GAL | 228 | $16.50 | $20.00 | $42.50 | $20.00 | $25.00 | $25.00 | |
| 9 | Asphalt (AC-20-5TR) (316-7007) | GAL | 610 | $22.00 | $30.00 | $42.10 | $20.00 | $20.00 | $40.00 | |
| 10 | Aggregate (type-PB, GR-3)(sac-B) (316-7208) | CY | 7 | $1,100.00 | $1,500.00 | $2,970.00 | $1,500.00 | $1,000.00 | $100.00 | |
| 11 | Aggregate (type-PB, GR-4)(sac-B) (316-7211) | CY | 7 | $1,100.00 | $1,500.00 | $2,970.00 | $1,500.00 | $1,000.00 | $200.00 | |
| 12 | Cem stabil BKFL (400-7010) | CY | 187 | $160.00 | $220.00 | $255.00 | $272.75 | $230.00 | $300.00 | $333.00 |
| 13 | Drilled shaft (24 in) (416-7004) | LF | 474 | $260.00 | $247.50 | $280.00 | $225.00 | $240.00 | $330.00 | $345.00 |
| 14 | Drilled shaft (30 in) (416-7005) | LF | 300 | $341.00 | $310.00 | $235.00 | $300.00 | $370.00 | $410.00 | |
| 15 | Class C concrete (abutment) (420-7012) | CY | 75.40 | $1,815.00 | $1,430.00 | $1,350.00 | $1,000.00 | $1,400.00 | $1,300.00 | $1,400.00 |
| 16 | Class C concrete (cap) (420-7022) | CY | 36.80 | $1,540.00 | $1,350.00 | $1,350.00 | $1,600.00 | $1,300.00 | $1,200.00 | |
| 17 | Class C concrete (column) (420-7038) | CY | 8.10 | $1,485.00 | $1,350.00 | $1,975.00 | $2,000.00 | $1,150.00 | $1,900.00 | |
| 18 | Class C concrete (miscellaneous) (420-7067) | CY | 15.20 | $1,900.00 | $1,100.00 | $1,300.00 | $1,286.65 | $1,200.00 | $1,100.00 | $900.00 |
| 19 | Reinforced concrete slab (box beam) (422-7005) | SF | 4,042 | $25.30 | $25.00 | $26.00 | $28.00 | $31.00 | $25.00 | |
| 20 | Reinforced concrete slab (slab beam) (422-7007) | SF | 3,380 | $35.00 | $23.10 | $25.00 | $26.00 | $28.00 | $31.00 | $31.00 |
| 21 | Approach slab (422-7013) | CY | 49 | $935.00 | $1,000.00 | $675.00 | $1,000.00 | $1,000.00 | $1,000.00 | |
| 22 | Prestressed concrete slab beam (5SB12) (425-7017) | LF | 392.12 | $221.79 | $315.00 | $328.00 | $300.00 | $293.50 | $315.00 | |
| 23 | Prestressed concrete slab beam (5SB15) (425-7019) | LF | 247.50 | $300.00 | $221.79 | $315.00 | $400.00 | $325.00 | $321.00 | $352.00 |
| 24 | Prestressed concrete box beam (4B20) (425-7026) | LF | 370.50 | $332.57 | $335.00 | $292.00 | $395.00 | $324.00 | $350.00 | |
| 25 | Prestressed concrete box beam (5B20) (425-7027) | LF | 494 | $332.57 | $335.00 | $346.00 | $395.00 | $325.00 | $345.00 | |
| 26 | Riprap (stone protection)(15 in) (432-7042) | CY | 257 | $230.00 | $220.00 | $210.00 | $165.00 | $190.00 | $200.00 | $320.00 |
| 27 | Riprap (stone protection)(18 in) (432-7043) | CY | 286 | $220.00 | $210.00 | $160.00 | $185.00 | $220.00 | $240.00 | |
| 28 | Rail (type T223) (450-7008) | LF | 598 | $155.00 | $209.00 | $120.00 | $115.00 | $150.00 | $132.00 | $215.00 |
| 29 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 65 | $220.00 | $200.00 | $262.00 | $225.00 | $260.00 | $275.00 | |
| 30 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 2 | $50,000 | $8,800.00 | $15,000 | $10,400 | $15,000 | $26,000 | $45,000 |
| 31 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $11,000 | $25,000 | $19,915 | $40,000 | $80,000 | $35,000 | |
| 32 | Mobilization (500-7001) | LS | 1 | $230,000 | $150,000 | $125,000 | $150,000 | $180,000 | $177,500 | $200,000 |
| 33 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $15,000 | $1,100.00 | $3,000.00 | $2,800.00 | $2,000.00 | $5,000.00 | $9,500.00 |
| 34 | Portable changeable message sign (503-7002) | EACH | 2 | $8,800.00 | $8,000.00 | $11,000 | $12,000 | $9,500.00 | $13,000 | |
| 35 | Rock filter dams (install) (type 1) (506-7001) | LF | 130 | $55.00 | $55.00 | $55.00 | $45.00 | $1.00 | $85.00 | $49.00 |
| 36 | Rock filter dams (remove) (506-7011) | LF | 130 | $25.00 | $16.50 | $10.00 | $10.00 | $1.00 | $2.50 | $22.00 |
| 37 | Temporary sediment control fence (install) (506-7039) | LF | 1,661 | $5.00 | $3.30 | $8.50 | $4.00 | $1.00 | $6.50 | $6.00 |
| 38 | Temporary sediment control fence (remove) (506-7041) | LF | 1,661 | $2.00 | $1.10 | $1.00 | $1.50 | $1.00 | $1.00 | $2.00 |
| 39 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 360 | $12.00 | $5.50 | $10.00 | $8.00 | $1.00 | $7.00 | $8.00 |
| 40 | Biodegradable erosion control logs (remove) (506-7046) | LF | 360 | $2.50 | $1.10 | $1.00 | $2.00 | $1.00 | $2.00 | $2.00 |
| 41 | Metal W-beam guard fence (timber post) (540-7001) | LF | 287.50 | $35.00 | $27.50 | $29.00 | $31.50 | $26.00 | $37.00 | $30.00 |
| 42 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 12 | $1,500.00 | $1,540.00 | $1,350.00 | $1,225.00 | $1,300.00 | $1,380.00 | $1,669.00 |
| 43 | Guardrail end treatment (install) (544-7001) | EACH | 12 | $3,350.00 | $3,300.00 | $3,250.00 | $3,525.00 | $3,500.00 | $4,600.00 | $4,400.00 |
| 44 | Wire fence (type C) (552-7003) | LF | 1,553 | $30.00 | $16.50 | $25.00 | $14.00 | $18.00 | $33.00 | $25.00 |
| 45 | Gate (type 1) (552-7006) | EACH | 1 | $2,250.00 | $3,300.00 | $1,500.00 | $3,500.00 | $2,000.00 | $2,500.00 | $1,500.00 |
| 46 | Wire fence (water gap) (552-7010) | LF | 165 | $55.00 | $55.00 | $50.00 | $150.00 | $45.00 | $60.00 | $45.00 |
| 47 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $40.00 | $110.00 | $255.00 | $100.00 | $50.00 | $200.00 | $99.00 |
| 48 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 18 | $45.00 | $38.50 | $32.00 | $47.75 | $45.00 | $60.00 | $55.00 |
| 49 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 36 | $35.00 | $44.00 | $31.00 | $47.75 | $45.00 | $50.00 | $55.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.