Tucan Contracting, LLC: TxDOT bid record

Tucan Contracting, LLC submitted 34 bids on Texas DOT contracts in the data, from 04 FEB 2026 to 07 OCT 2026, and was the low bidder on 5 of them (15%). When it was not low, its total sat a median +23% above the low bid.

Owner
Texas DOT
Low bid volume
$9,338,443
Latest bid
07 OCT 2026
Data through
19 NOV 2026
34Bids
5Low bids
15Win rate, percent
+23%Median gap to the low bid when not low, 29 bids

By year

YearBidsLow bidsWin rate
202634515%
Tucan Contracting, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District7229%
Fort Worth District600%
Paris District400%
Waco District4250%
Wichita Falls District300%
Abilene District2150%
Bryan District200%
Childress District200%
San Angelo District200%
Yoakum District100%
Houston District100%
Tucan Contracting, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO348 (24%)$2,200.00$5,000.00
Removing structure (bridge 0 - 99 FT length)496-7009EACH146 (43%)$11,000$26,200
Prestressed concrete girder (TX28)425-7001LF115 (45%)$220.00$250.00
Drilled shaft (36 in)416-7006LF154 (27%)$275.00$300.00
Prestressed concrete slab beam (5SB15)425-7019LF54 (80%)$221.79$265.00
Preparing row100-7002STA263 (12%)$2,200.00$2,750.00
Pavement surface preparation for marking (6")678-7002LF123 (25%)$0.60$0.18
Temporary special shoring403-7001SF113 (27%)$22.00$35.73
Prestressed concrete slab beam (5SB12)425-7017LF53 (60%)$221.79$250.00
Temporary sediment control fence (remove)506-7041LF272 (7%)$1.10$1.00
Cem stabil BKFL400-7010CY202 (10%)$220.00$200.00
Metal W-beam guard fence (timber post)540-7001LF142 (14%)$28.03$27.00
Tucan Contracting, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Tucan Contracting, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 OCT 2026A00135746Dallas DistrictConstruct Pedestrian Infrastructure, IH 35E (DART Victory Station to At IH 35E Southbound Frontage Roads)8 of 9$1,411,848+20%
07 OCT 2026A00196909Dallas DistrictHazard Elimination & Safety, IH 45 (South of Risinger Rd to Dallas County Line)7 of 8$5,183,617+38%
03 SEP 2026A00207389Childress DistrictBridge Replacement, FM 1547 (@ Buck Creek to .)4 of 7$3,835,569+27%
03 SEP 2026A00127879Paris DistrictBridge Replacement, FARMINGTON RD (Farmington Rd to AT CHOCTAW CREEK)8 of 8$3,471,852+63%
02 SEP 2026A00206056Wichita Falls DistrictConstruct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR)3 of 7$1,139,850+11%
02 SEP 2026A00207438Wichita Falls DistrictBridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw)4 of 6$3,510,334+25%
05 AUG 2026A00065091Fort Worth DistrictBridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .)9 of 10$2,073,462+35%
05 AUG 2026A00217911Dallas DistrictBridge Maintenance, US 80 (at Big Brushy Creek to .)6 of 10$1,152,052+44%
01 JUL 2026A00196687Dallas DistrictConstruct Pedestrian Infrastructure, FM 3039 (South of Hunter Lane to South of West Lewis)3 of 9$685,106+15%
01 JUL 2026A00131299Waco DistrictBridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82))1 of 8$2,080,558Low, 4.0% under the second
03 JUN 2026A00185405Dallas DistrictBridge Replacement, FRANKFORD RD E (Frankford Rd WB AT Furneaux Creek to .)1 of 5$2,342,967Low, 2.0% under the second
02 JUN 2026A00219663Fort Worth DistrictInstall Noise Barrier, SH 360 (Ave J to N of Ave J)3 of 7$1,322,000+12%
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)2 of 9$3,678,460+8.0%
02 JUN 2026A00198038San Angelo DistrictBicycle And Pedestrian Improvements, Various (Along BU 67H From S Milton Street to Along BU 67H To S Koenigheim Street)3 of 7$1,967,078+18%
07 MAY 2026A00210343Dallas DistrictBicycle And Pedestrian Improvements, Various (Various Locations along SH 78 to In the Dallas District)2 of 8$2,725,664+2.0%
07 MAY 2026A00203223Waco DistrictRemoval And/Or Replacement And/Or Disposal, OLD ROBINSON DR (Old Robinson Rd @ Drain to Old Robinson Rd @ Drain)5 of 6$862,810+49%
06 MAY 2026A00206377Bryan DistrictConstruct Pedestrian Infrastructure, FM 3090 (SH 6 SB Frontage Road to N. Railroad Street)9 of 10$2,620,510+43%
06 MAY 2026A00139927San Angelo DistrictBridge Replacement, FM 72 (At Spring Creek Bridge to -)5 of 10$5,534,673+26%
08 APR 2026A00194074Abilene DistrictBridge Replacement, CR 305 (ALKALI CRK TRIB to .)1 of 7$1,880,830Low, 2.0% under the second
08 APR 2026A00037264Fort Worth DistrictBridge Replacement, OLD GRANBURY RD (OLD GRANBURY RD OVER WALNUT CREEK to .)2 of 8$658,219+4.0%
08 APR 2026A00209284Paris DistrictBridge Maintenance, Various (Various Locations to .)9 of 12$1,190,575+62%
08 APR 2026A00131274Waco DistrictBridge Replacement, COUNTY ROAD 104 (@ WILLIAMS CREEK to (MAP #2))1 of 10$1,810,423Low, 6.0% under the second
07 APR 2026A00061686Abilene DistrictBridge Replacement, COUNTY ROAD 412 (CR 412 to AT COTTONWOOD CRK TRIB)4 of 6$3,887,221+23%
07 APR 2026A00189999Bryan DistrictBridge Replacement, ARTESIAN PARK RD (ON CR 830 (ARTESIAN PARK LANE, F-CR 419) to AT EAST FORK OF MILL CREEK)9 of 9$1,061,625+45%
07 APR 2026A00186047Waco DistrictBridge Replacement, COUNTY ROAD 325 (FCR 461 @ Hog Creek to (MAP #2064))9 of 12$1,360,924+30%
Tucan Contracting, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy