Knife River Corporation - South: TxDOT bid record
Knife River Corporation - South submitted 397 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 18 NOV 2026, and was the low bidder on 92 of them (23%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $270,515,878
- Latest bid
- 18 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 39 | 12 | 31% |
| 2021 | 59 | 17 | 29% |
| 2022 | 50 | 13 | 26% |
| 2023 | 51 | 20 | 39% |
| 2024 | 39 | 11 | 28% |
| 2025 | 87 | 13 | 15% |
| 2026 | 72 | 6 | 8% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bryan District | 164 | 40 | 24% |
| Waco District | 114 | 25 | 22% |
| Dallas District | 49 | 18 | 37% |
| Austin District | 18 | 3 | 17% |
| Yoakum District | 14 | 0 | 0% |
| Brownwood District | 12 | 3 | 25% |
| Fort Worth District | 12 | 1 | 8% |
| Houston District | 10 | 1 | 10% |
| Lufkin District | 3 | 0 | 0% |
| Tyler District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Portable changeable message sign | 503-7002 | EACH | 176 | 52 (30%) | $7,500.00 | $10,000 |
| Barricades, signs and traffic handling | 502-7001 | MO | 263 | 49 (19%) | $6,400.00 | $5,000.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 215 | 49 (23%) | $1.05 | $1.00 |
| Preparing row | 100-7002 | STA | 158 | 48 (30%) | $1,500.00 | $2,750.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 140 | 40 (29%) | $100.00 | $110.00 |
| Excavation (roadway) | 110-7001 | CY | 170 | 39 (23%) | $20.00 | $20.00 |
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 146 | 35 (24%) | $1.10 | $1.41 |
| TMA (stationary) | 505-7001 | DAY | 214 | 34 (16%) | $437.50 | $230.00 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 68 | 30 (44%) | $1.60 | $3.00 |
| Work zone pavement marking SHT terminal (tab)type W | 662-7112 | EACH | 112 | 27 (24%) | $1.00 | $1.45 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 145 | 26 (18%) | $650.00 | $710.00 |
| Vegetative watering | 168-7001 | MG | 105 | 26 (25%) | $40.00 | $29.97 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Big Creek Construction, LTD. | 218 | 145 of 218 |
| Texas Materials Group, Inc. | 218 | 95 of 218 |
| A. L. Helmcamp, Inc. | 78 | 26 of 78 |
| Larry Young Paving, Inc. | 50 | 35 of 50 |
| Hodges and Son Construction Company, Inc. | 48 | 21 of 48 |
| Cornerstone Paving and Construction, L.L.C. | 45 | 31 of 45 |
| Brazos Paving, Inc. | 45 | 16 of 45 |
| James Construction Group, LLC | 38 | 10 of 38 |
| FNH Construction, LLC | 31 | 3 of 31 |
| Lone Star Paving Company | 30 | 19 of 30 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 NOV 2026 | A00224407 | Bryan District | HOT MIX, IH0045 (Various to Various) | 2 of 3 | $288,000 | +2.0% |
| 18 NOV 2026 | A00224408 | Bryan District | HOT MIX, IH0045 (Various to Various) | 1 of 3 | $270,750 | Low, 0.0% under the second |
| 17 NOV 2026 | A00224405 | Bryan District | HOT MIX, SH0006 (Various to Various) | 1 of 3 | $378,400 | Low, 15% under the second |
| 17 NOV 2026 | A00224406 | Bryan District | HOT MIX, IH0045 (Various to Various) | 2 of 3 | $481,500 | +8.0% |
| 17 NOV 2026 | A00223456 | Waco District | HOT-MIX COLD-LAID, SL0121 (VARIOUS LOCATIONS to IN THE WACO DISTRICT) | 3 of 3 | $646,563 | +38% |
| 04 NOV 2026 | A00124162 | Bryan District | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | 3 of 12 | $33,911,798 | +12% |
| 04 NOV 2026 | A00206631 | Bryan District | Hazard Elimination & Safety, FM 485 (1.99 Mi W of FM 979 to 1.86 Mi E of FM 979) | 3 of 7 | $10,424,591 | +7.0% |
| 04 NOV 2026 | A00224201 | Waco District | BASE FAILURE PAVEMENT REPAIR, SH0081 (VARIOUS LOCATIONS to ACROSS HILL, FALLS, AND LIMESTONE) | 3 of 3 | $1,799,220 | +12% |
| 03 NOV 2026 | A00204003 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK) | 3 of 15 | $735,430 | +2.0% |
| 03 NOV 2026 | A00224202 | Waco District | BASE FAILURE PAVEMENT REPAIR, FM3476 (VARIOUS LOCATIONS to WITHIN MCLENNAN COUNTY) | 3 of 4 | $2,340,970 | +8.0% |
| 03 NOV 2026 | A00224203 | Waco District | BASE FAILURE PAVEMENT REPAIR, US0084 (VARIOUS LOCATIONS to ACROSS CORYELL, HAMILTON, & BOSQUE) | 3 of 4 | $1,358,179 | +18% |
| 14 OCT 2026 | A00223022 | Dallas District | ROCK/RIPRAP, FM0876 (Ellis to Maintenance Section) | 5 of 5 | $134,000 | +28% |
| 07 OCT 2026 | A00209263 | Waco District | Rehabilitate Existing Roadway, IH 35W (IH 35E to Johnson Co Line) | 2 of 5 | $11,124,726 | +2.0% |
| 07 OCT 2026 | A00222965 | Fort Worth District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0281 (Various locations to Erath County) | 3 of 3 | $4,172,799 | +70% |
| 06 OCT 2026 | A00206378 | Bryan District | Construct Pedestrian Infrastructure, FM 486 (Front Street to Salty Street) | 8 of 10 | $438,544 | +70% |
| 03 SEP 2026 | A00189990 | Bryan District | Bridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK) | 6 of 7 | $1,276,197 | +12% |
| 02 SEP 2026 | A00197294 | Austin District | Preventive Maintenance, FM 1331 (0.53 MI W of FM 619 to Milam C/L) | 4 of 4 | $3,103,126 | +43% |
| 12 AUG 2026 | A00219467 | Dallas District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0045 (Various Roadways in to Navarro County Maintenance Section) | 3 of 4 | $1,082,879 | +13% |
| 11 AUG 2026 | A00222989 | Bryan District | HOT MIX, IH0045 (Various to Various) | 3 of 3 | $724,400 | +14% |
| 06 AUG 2026 | A00222319 | Bryan District | MILL AND INLAY, SH0006 (Various to Various) | 3 of 4 | $1,026,287 | +4.0% |
| 06 AUG 2026 | A00187526 | Bryan District | Rehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line) | 2 of 6 | $4,492,337 | +5.0% |
| 05 AUG 2026 | A00196824 | Bryan District | Intersection Improvement, SH 36 (1.28 Mi S of SH 21 to 0.71 Mi N of CR 122) | 5 of 6 | $5,590,058 | +12% |
| 05 AUG 2026 | A00189992 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (On CR 244 (F-CR 265) to At Eads Creek) | 3 of 8 | $2,595,573 | +1.0% |
| 15 JUL 2026 | A00222526 | Bryan District | AGGREGATE, SH0036 (Various to Various) | 4 of 5 | $145,000 | +26% |
| 02 JUL 2026 | A00222320 | Bryan District | MILL AND INLAY, IH0045 (Various to Various) | 2 of 4 | $1,574,771 | +10% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.