Brazos Paving, Inc.: TxDOT bid record

Brazos Paving, Inc. submitted 58 bids on Texas DOT contracts in the data, from 07 JAN 2022 to 17 NOV 2026, and was the low bidder on 8 of them (14%). When it was not low, its total sat a median +18% above the low bid.

Owner
Texas DOT
Low bid volume
$20,407,594
Latest bid
17 NOV 2026
Data through
19 NOV 2026
58Bids
8Low bids
14Win rate, percent
+18%Median gap to the low bid when not low, 50 bids

By year

YearBidsLow bidsWin rate
202222100%
20237114%
20247114%
202526312%
20261616%
Brazos Paving, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Bryan District57814%
Yoakum District100%
Brazos Paving, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Riprap (mow strip)(4 in)432-7013CY148 (57%)$518.38$643.00
Cem stabil BKFL400-7010CY116 (55%)$117.50$200.00
TMA (stationary)505-7001DAY435 (12%)$295.00$230.00
Driveways (ACP)530-7010SY145 (36%)$50.15$60.00
Driveways (concrete)530-7006SY105 (50%)$113.70$110.00
Reflectorized pavement marker type II-A-A672-7004EACH234 (17%)$7.80$5.00
Preparing row100-7002STA204 (20%)$1,752.50$2,750.00
Concrete curb & gutter (type II)529-7009LF104 (40%)$50.85$42.58
Class A concrete (collar)420-7008EACH64 (67%)$1,125.00$1,534.05
Riprap (concrete)(4 in)432-7001CY73 (43%)$1,020.00$650.00
SP mixes SP-C sac-A PG70-223077-6022TON73 (43%)$158.40$142.65
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH242 (8%)$828.75$710.00
Brazos Paving, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Brazos Paving, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 NOV 2026A00224405Bryan DistrictHOT MIX, SH0006 (Various to Various)2 of 3$434,500+15%
06 OCT 2026A00206378Bryan DistrictConstruct Pedestrian Infrastructure, FM 486 (Front Street to Salty Street)10 of 10$580,723+126%
06 AUG 2026A00222319Bryan DistrictMILL AND INLAY, SH0006 (Various to Various)2 of 4$991,8010.0%
06 AUG 2026A00187526Bryan DistrictRehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line)3 of 6$4,729,455+10%
05 AUG 2026A00196824Bryan DistrictIntersection Improvement, SH 36 (1.28 Mi S of SH 21 to 0.71 Mi N of CR 122)6 of 6$6,623,664+33%
01 JUL 2026A00222317Bryan DistrictMILL AND INLAY, SH0036 (Various to Various)1 of 5$1,091,717Low, 4.0% under the second
01 JUL 2026A00206416Bryan DistrictWiden Road - Add Shoulders, FM 974 (3 Mi S of FM 2776 to FM 2776)4 of 8$4,384,483+16%
10 JUN 2026A00221779Bryan DistrictHOT MIX, SH0006 (Various to Various)4 of 5$392,160+19%
09 JUN 2026A00221778Bryan DistrictHOT MIX, SH0036 (Various to Various)4 of 5$235,300+11%
02 JUN 2026A00206629Bryan DistrictIntersection Improvements With Right And/Or Left Turn Lanes, SH 90 (0.16 Mi N of FM 244 to 0.31 Mi S of FM 244)6 of 7$1,405,648+13%
07 MAY 2026A00217203Bryan DistrictMILL AND INLAY, SH0006 (Hearne to Calvert)5 of 5$3,070,815+35%
06 MAY 2026A00206377Bryan DistrictConstruct Pedestrian Infrastructure, FM 3090 (SH 6 SB Frontage Road to N. Railroad Street)10 of 10$2,927,236+60%
08 APR 2026A00200748Bryan DistrictSurfacing/Roadway Restoration, US 290 (1.3 Mi E of FM 577 to 3 Mi E of FM 1371 (Brazos River Bridge))7 of 7$7,990,313+22%
05 MAR 2026A00217747Bryan DistrictMILL AND INLAY, US0079 (9th St to Anderson St.)5 of 7$2,601,126+12%
10 FEB 2026A00219214Bryan DistrictDRAINAGE IMPROVEMENT AND/OR REPAIRS, US0190 (Various to Various)4 of 4$745,755+41%
06 JAN 2026A00211861Bryan DistrictBridge Maintenance, BS 6S (BS 6 NB to at SH 6 SB)8 of 8$4,682,431+65%
10 DEC 2025A00218326Bryan DistrictHOT MIX, SH0006 (Various to Various)2 of 2$321,600+8.0%
10 DEC 2025A00218387Bryan DistrictHOT MIX, SH0036 (Various to Various)2 of 2$627,800+8.0%
07 AUG 2025A00192967Bryan DistrictIntersection Improvements With Right And/Or Left Turn Lanes, FM 974 (At SH 6 West Frontage Rd. to .)5 of 5$3,721,478+32%
09 JUL 2025A00216197Bryan DistrictHOT MIX, SH0006 (Various to Various)2 of 4$423,000+3.0%
08 JUL 2025A00216200Bryan DistrictHOT MIX, SH0036 (Various to Various)1 of 3$292,200Low, 2.0% under the second
01 JUL 2025A00209975Bryan DistrictConstruct Pedestrian Infrastructure, HOLLEMAN DR (0.1 Mi W of BS 6R to 0.2 Mi W of BS 6R)2 of 4$129,883+45%
01 JUL 2025A00184431Bryan DistrictReconstruct Existing Roadway, SH 75 (IH 45 to 0.2 Mi S of IH 45)5 of 5$1,098,305+34%
12 JUN 2025A00215641Bryan DistrictHOT MIX, SH0006 (Various to Various)2 of 2$196,860+2.0%
12 JUN 2025A00215732Bryan DistrictSPOT BASE REPAIR, FM0244 (FM 244 to FM 244)2 of 4$387,435+7.0%
Brazos Paving, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.