TxDOT letting results, July 1, 2025
59 contracts let by Texas DOT on July 1, 2025, $338,175,000 in low bids, a median of 5 bidders per contract. On the 59 with an engineer's estimate, the low bid came in under it 49 times; median low bid -15% against the estimate.
- Owner
- Texas DOT
- Contracts
- 59
- Low bids, total
- $338,175,000
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00125991 | Construct New Roadway Lanes, US 77 (1.5 MI N. OF SH 285 INTERSECTION to KENEDY/KLEBERG COUNTY LINE) | Corpus Christi District | 6 | Anderson Columbia Co., Inc. | $178,365,453 | $179,222,220 | 0.0% | -15% | TxDOT |
| A00062051 | Resurface Roadway, FM 730 (SH 114 to TARRANT COUNTY LINE) | Fort Worth District | 4 | Foutsco Paving Company, LLC | $15,286,842 | $15,604,535 | +2.0% | -9.0% | TxDOT |
| A00064919 | Highway Improvement, US 96 (FM 83 to 0.15 mi N of SS 414) | Lufkin District | 5 | Pinto Construction Co., Inc. | $14,650,398 | $15,672,119 | +7.0% | -15% | TxDOT |
| A00214432 | DRY DOCKING FERRY BOATS, SH0361 (SH0631 to at Ferry Landing) | Corpus Christi District | 1 | Palacios Shipyard, Inc. | $8,596,700 | 0.0% | TxDOT | ||
| A00214769 | PAINT, IH0069 (IH 69 to SL 8) | Houston District | 5 | Roy Jorgensen Associates, Inc. | $7,978,981 | $9,459,665 | +19% | -43% | TxDOT |
| A00196911 | Rehabilitate Existing Roadway, US 380 (Wise County Line to West of FM 156) | Dallas District | 7 | Jagoe-Public Company | $7,632,634 | $8,391,095 | +10% | -20% | TxDOT |
| A00188134 | Resurface Roadway, SL 13 (S. Presa St. to Fairlawn Drive) | San Antonio District | 6 | Clark Construction of Texas, Inc. | $5,240,622 | $6,351,538 | +21% | -33% | TxDOT |
| A00197100 | Bridge Maintenance, US 90 (@ HILLEBRANDT BAYOU to STR#20-124-0-0028-07-044) | Beaumont District | 9 | Ragle Construction, Inc. | $5,167,740 | $5,976,728 | +16% | -31% | TxDOT |
| A00214842 | Total Maintenance, IH0045 (SH 87 to SOUTHERN STREET) | Houston District | 3 | Roy Jorgensen Associates, Inc. | $4,988,410 | $5,262,303 | +5.0% | -10% | TxDOT |
| A00205962 | Bridge Maintenance, US 67 (US 67 SB at Wheatland Road to .) | Dallas District | 6 | Ragle Construction, Inc. | $4,922,876 | $5,477,163 | +11% | -24% | TxDOT |
| A00193383 | Hazard Elimination & Safety, FM 3084 (FM 1090 to 0.722 Mi N OF SH 35) | Yoakum District | 7 | Clark Construction of Texas, Inc. | $4,398,168 | $4,520,307 | +3.0% | -12% | TxDOT |
| A00206338 | Bridge Replacement, SH 159 (At Rocky Creek to Str # 0267-02-022) | Yoakum District | 5 of 10 | Acme Bridge Company, Inc. | $4,282,480 | $4,331,880 | +1.0% | +6.0% | TxDOT |
| A00205586 | Repair Roadway, Various (VARIOUS LOCATIONS to Within the Fort Worth District) | Fort Worth District | 2 | O. Trevino Construction, LLC | $4,218,125 | $5,573,300 | +32% | -16% | TxDOT |
| A00214015 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0820 (VARIOUS LOCATIONS WITHIN to NORTH TARRANT COUNTY) | Fort Worth District | 6 | Foutsco Paving Company, LLC | $4,210,079 | $4,230,250 | 0.0% | -15% | TxDOT |
| A00183298 | Bicycle And Pedestrian Improvements, SH 36 (BU 83D to FM 1750) | Abilene District | 5 | J. H. Strain & Sons, Inc. | $4,169,101 | $4,239,250 | +2.0% | +2.0% | TxDOT |
| A00199763 | Hazard Elimination & Safety, FM 1423 (BUS 83S to CR 3677 /End of State Maintenance) | Pharr District | 6 | Texas Cordia Construction, LLC | $3,406,133 | $3,546,657 | +4.0% | -16% | TxDOT |
| A00061208 | Resurface Roadway, SL 353 (Pitluk Ave. to Cass Ave.) | San Antonio District | 7 | Clark Construction of Texas, Inc. | $3,232,999 | $3,724,579 | +15% | -40% | TxDOT |
| A00215303 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0377 (Various locations in to Hood, Erath, Somervell Counties) | Fort Worth District | 3 | Foutsco Paving Company, LLC | $3,185,928 | $4,225,451 | +33% | -28% | TxDOT |
| A00064769 | Bridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .) | Dallas District | 13 | STX Civil | $3,124,045 | $3,149,367 | +1.0% | -9.0% | TxDOT |
| A00214310 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, FM0148 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | Dallas District | 5 | Foutsco Paving Company, LLC | $2,959,052 | $3,490,037 | +18% | -20% | TxDOT |
| A00193596 | Hazard Elimination & Safety, US 90 (East of SL 8 to Liberty County Line) | Houston District | 8 | Isi Contracting, Inc. | $2,899,776 | $3,251,689 | +12% | -16% | TxDOT |
| A00194291 | Bridge Replacement, COUNTY ROAD 267 (At Draw to STR# AA03-06-002) | Yoakum District | 7 | John Reed and Company, LLC | $2,789,318 | $2,842,227 | +2.0% | -3.0% | TxDOT |
| A00183418 | Bridge Replacement, COUNTY ROAD 341 (CR258/Sign CR 341 at Draw to .) | Wichita Falls District | 8 | THK Construction LLC | $2,437,821 | $2,514,569 | +3.0% | -11% | TxDOT |
| A00214920 | CRASH CUSHION ATTENUATOR REPAIR, IH0020 (VARIOUS LOCATIONS WITHIN to Fort Worth District) | Fort Worth District | 6 | Ross Sa Enterprise LLC | $2,311,375 | $3,142,518 | +36% | -22% | TxDOT |
| A00190867 | Bridge Replacement, PRESCOTT RD (At Draw to .) | Paris District | 11 | RB Contracting, LLC | $2,294,027 | $2,427,098 | +6.0% | -15% | TxDOT |
| A00215430 | FULL DEPTH CONCRETE REPAIR, US0082 (Various Counties to Wichita Falls District) | Wichita Falls District | 3 | GHB Equipment Company, L.L.C. | $2,136,200 | $2,388,950 | +12% | -15% | TxDOT |
| A00213920 | HOT MIX, SH0031 (Various locations to In Hill & Bosque County) | Waco District | 3 | Big Creek Construction, LTD. | $1,959,150 | $1,967,475 | 0.0% | -5.0% | TxDOT |
| A00193627 | Hazard Elimination & Safety, GRANDVIEW S (Murphy St to BI 20) | Odessa District | 3 | Vaca Underground Utilities Inc | $1,911,951 | $2,323,256 | +22% | -17% | TxDOT |
| A00183588 | Bridge Replacement, FM 94 (@ Draw to .) | Childress District | 7 | STX Civil | $1,837,101 | $1,941,370 | +6.0% | -13% | TxDOT |
| A00215015 | PAINT, IH0035 (Various to Various) | Laredo District | 4 | Ragle Construction, Inc. | $1,788,378 | $1,942,145 | +9.0% | +30% | TxDOT |
| A00214692 | MILL AND INLAY, IH0010 (VARIOUS to VARIOUS) | Odessa District | 5 | Reece Albert, Inc. | $1,781,182 | $1,811,167 | +2.0% | -6.0% | TxDOT |
| A00193092 | Hazard Elimination & Safety, FM 1990 (0.1 mi N of Gum Cr to CR 2137) | Tyler District | 10 | THK Construction LLC | $1,639,418 | $1,941,518 | +18% | -31% | TxDOT |
| A00214581 | METAL BEAM GUARD FENCE REPAIR, US0081 (Various Locations In to North Tarrant County) | Fort Worth District | 7 | T&L Cleaning Services LLC | $1,434,062 | $1,660,091 | +16% | -40% | TxDOT |
| A00213952 | HOT MIX, SL0121 (VARIOUS ROADWAYS to ACROSS BELL AND FALLS COUNTY) | Waco District | 4 | Texas Materials Group, Inc. | $1,367,899 | $1,390,250 | +2.0% | -7.0% | TxDOT |
| A00199643 | Construct Pedestrian Infrastructure, Various (DISTRICTWIDE to .) | Brownwood District | 9 | Westfield Insurance Company | $1,364,489 | $1,456,908 | +7.0% | -8.0% | TxDOT |
| A00212312 | Landscape Development, Various (DISTRICTWIDE to .) | Beaumont District | 4 | Tight Line Construction, LLC | $1,263,786 | $1,363,490 | +8.0% | -25% | TxDOT |
| A00197982 | Hazard Elimination & Safety, RM 3404 (Llano River to RM 1431) | Austin District | 5 | Hunter Industries, LTD. | $1,179,800 | $1,284,000 | +9.0% | -12% | TxDOT |
| A00213131 | Landscape Development, Various (PRESIDIO COUNTYWIDE to .) | El Paso District | 3 | Abescape Landscaping, LLC | $1,179,328 | $1,190,821 | +1.0% | +39% | TxDOT |
| A00214916 | BRIDGE PREVENTATIVE MAINTENANCE, IH0035 (various locations to in Bexar County) | San Antonio District | 5 | Roy Jorgensen Associates, Inc. | $1,143,629 | $1,540,980 | +35% | -30% | TxDOT |
| A00212752 | Landscape Development, GREENLEE DR (At Tippit Middle School to .) | Austin District | 5 | Rare Earth Landscape Solutions LLC | $1,125,475 | $1,404,435 | +25% | -27% | TxDOT |
| A00184686 | Hazard Elimination & Safety, HACKBERRY (In San Antonio on Hackberry to at Steves Ave.) | San Antonio District | 6 | Vaca Underground Utilities Inc | $1,122,573 | $1,132,760 | +1.0% | -15% | TxDOT |
| A00183318 | Bicycle And Pedestrian Improvements, Various (On Taylor St and Waller-Tomball Rd to From Farr St to FM 2920) | Houston District | 8 | Highway 19 Construction LLC | $948,028 | $949,545 | 0.0% | -18% | TxDOT |
| A00058846 | Purchase And Install Signs & Equip, Various (DISTRICTWIDE (SIGNING) to .) | El Paso District | 3 | Centerline Technologies, LLC | $890,833 | $1,314,276 | +48% | -21% | TxDOT |
| A00214621 | FULL DEPTH CONCRETE REPAIR, IH0010 (Various Locations in to Jefferson & Hardin Counties) | Beaumont District | 4 | O. Trevino Construction, LLC | $879,310 | $965,686 | +10% | -25% | TxDOT |
| A00197546 | Surfacing/Roadway Restoration, SL 8 (West of Lockwood Rd to IH 10(E)) | Houston District | 4 | Professional Traffic Control LLC | $875,958 | $921,413 | +5.0% | -20% | TxDOT |
| A00208026 | Furnish & Install Dynamic Message Signs, Various (Various locations to Various locations) | Atlanta District | 1 | Light It Up Electric | $828,166 | -11% | TxDOT | ||
| A00184431 | Reconstruct Existing Roadway, SH 75 (IH 45 to 0.2 Mi S of IH 45) | Bryan District | 5 | Cornerstone Paving and Construction, L.L.C. | $820,741 | $894,308 | +9.0% | 0.0% | TxDOT |
| A00215376 | TRAFFIC CONTROL SERVICES, US0069 (Various locations in to Grayson County) | Paris District | 1 | Awp Safety | $814,000 | -37% | TxDOT | ||
| A00182262 | Landscape Development, RM 1431 (At Old RM 1431 to .) | Austin District | 3 | Tight Line Construction, LLC | $787,071 | $827,617 | +5.0% | -1.0% | TxDOT |
| A00184187 | Hazard Elimination & Safety, DOWLEN RD (DELAWARE STREET, NORTH to EASTEX FREEWAY) | Beaumont District | 4 | Florida Traffic Control Devices, Inc. | $702,600 | $716,224 | +2.0% | +19% | TxDOT |
| A00184068 | Traffic Signal Improvements, S 14TH ST (Sayles Boulevard to .) | Abilene District | 4 | Willis Electric Co., LP | $643,372 | $768,329 | +19% | -2.0% | TxDOT |
| A00215341 | CLEANING AND SEALING CRACKS, US0081 (Various locations in to Jack and Wise Counties) | Fort Worth District | 3 | Icos Management, LLC | $622,343 | $758,738 | +22% | +23% | TxDOT |
| A00213069 | BRIDGE PREVENTATIVE MAINTENANCE, US0096 (Various to Various) | Beaumont District | 11 | Gibson & Associates, Inc. | $594,806 | $605,231 | +2.0% | -48% | TxDOT |
| A00209144 | Install/Rehabilitate Its, Various (Various Locations to In the Dallas District) | Dallas District | 5 | Light It Up Electric | $497,235 | $628,708 | +26% | -36% | TxDOT |
| A00211766 | Landscape Development, BU 287P (City of Saginaw Limit to Palomino Drive) | Fort Worth District | 4 | C. Green Scaping, L.P. | $494,458 | $519,763 | +5.0% | -27% | TxDOT |
| A00215350 | CLEANING AND SEALING CRACKS, SH0171 (Various location in to Parker and Palo Pinto Counties) | Fort Worth District | 3 | Icos Management, LLC | $322,280 | $382,294 | +19% | +14% | TxDOT |
| A00207014 | Hazard Elimination & Safety, US 380 (Intersection of to FM179) | Lubbock District | 2 | Marcom'S Mowing Service, LLC | $249,241 | $252,185 | +1.0% | +9.0% | TxDOT |
| A00207270 | Landscape Development, Various (Various locations to Various locations) | Atlanta District | 4 | Rayford'S Truck & Tractor | $131,209 | $136,879 | +4.0% | -22% | TxDOT |
| A00209975 | Construct Pedestrian Infrastructure, HOLLEMAN DR (0.1 Mi W of BS 6R to 0.2 Mi W of BS 6R) | Bryan District | 4 | MB Western Industrial Contracting Co. | $89,848 | $129,883 | +45% | -11% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.